Laying of 11KV Line on 8meter ST Poles using 120 mm2AB cable for charging 11KV dedicated feeder Ayurvedic Medical College Hospital at Sanghani Akhnoor falling under the jurisdiction of Electric Sub Division Akhnoor on Turnkey basis.
Construction of New 11KV Dedicated feeder from Receiving Station Ganapora to WSS Sonwani Lookipora upto Lift Station Sonwani Lookipora and Further Extension of 11KV Line from Left Station Lookipora to Filtration Plant Lookipora under JJm Programm
Extension of 33KV line from Peernia to Barrage by utilizing existing 11KV Barrage line structure with new 100KVA 33 by 0.4 KVA Transformer at Barrage along with stabilization of line by way of replacement of deteriorated wooden poles and other allied
Supply, Erection/Creation, Testing and Commissioning of 25 KVA transformer substation along with laying of HT and LT Line on turnkey Basis at Rajinder Pura , Bagoona under the jurisdiction of Executive Engineer Electric Division Vijaypur, JPDCL,
Creation of 02 Nos.1000KVA 11/0.433KV Sub Stations alongwith erection of 11KV HT Line Double Circuit from 66/11KV Receiving Station up to site at GMC Kathua falling under the jurisdiction of Electric Division Kathua on Turnkey Basis.
Shifting of HT line of Feeder-5 of Receiving Silk Factory and Feeder-2 Rajbagh to pave way for Modification of Main Entrance Gate complex at Tulsibagh by Estates Division, Srinagar (DC Work)
Supply Survey Erection Testing and Commissioning for creation of 100 KVA sub station along with HT Line at Stage 2nd Hergam under WSS Chamalwas JJM under the Jurisdiction of Electric Division JPDCL Batote
SUPPLY ERECTION TESTING COMMISSIONING FOR CONSTRUCTION OF HT LINE NETWOK SUB STATIONS AT VARIOUS LOCATIONS OF DISTT RAMBAN AGAINST UT CAPEX BUDGET 2024 25 UNDER THE JURISDICTION OF ED BATOTE on Turnkey Basis
Supplying/ Errection/ Testing and Commissioning of 63 KVA Pole Mounted Distribution substation along with tapping point and HT line with in the premises of Labour Sarai at Industrial Growth Centre Samba Phase-II
Creation of 250KVA and 100KVA New Sub Stations along with HT/LT Line for PHE at WSS Sar-Sabal under the jurisdiction of Electric Sub Division Ramkot of OM Division, Kathua(JPDCL) on Turnkey Basis
Shifting of 11kv HT Line
Erection of 11kv HT Line
Creation of 100 KVA Distribution Sub Stations along with Laying of HT Line on turnkey basis at various locations of Block Bishnah for PHE installations under Jal Jeevan Mission within the jurisdiction of Electric Division Vijaypur, JPDCL Jammu
Creation of 63 KVA sub station along with HT/LT network, Shifting of LT Line, Creation of 100 KVA Substation, Shifting of Line
Laying of LT line on 8 Mtr long ST Poles alongwith ACSR Weasel Conductor at village Kohsar W. No. 8 in Assembly Constituency Chenani ( FINDC2526111737) under Constituency Development Fund
Creation of 2X100 KVA S.Stn. along with HT/LT line at WSS Chandyal Sanjiote 100 KVA Ward No. 4 Sanjiote and 100 KVA Ward No. 5 Sanjiote under JJM-2023-24
Supply, Installation, Testing, Commissioning of 250 KVA, 11/0.415KV Distribution Substation along with HT/LT line at Karnelay Chak Kargil Friend Colony, Nandini Opp. Army Ground, Near Masjid, Jammu under ED2
Supply, Erection, Testing and Commissioning of 100KVA Substation along with HT/LT line in Arnia Block, Village Pindi Charkan Seema Samridhi Yojna 2023-24 on turnkey basis (Scheme Code- PLNDC2324-101294)
Supply Installation, Testing, Commissioning of 63KVA, 11/0.415KV distribution substation along with HT/LT line at Village Kothey, Salehar falling under the jurisdiction of Electric Division-II Jammu (Scheme Code- PDDSS2324100250).
Creation of 3X100 KVA S.Stn. along with HT/LT line at WSS 100 KVASalotri Base, 100 KVA Kayian Islamabad Kayian Base and 100 KVA Kayian Stage 1st under JJM-2023-24
Shifting of existing LT line of Basohli Hostel and realigning the same in new place for making way for Pre Engineering Structure for 100 capacity Boys Hostel in SMVDU Kakryal Katra
Supply Erection Testing Commissioning of 100KVA Distribution Substation along with HT/LT line for PHE Pumping Station at Kalyana on turnkey basis (WSS Kalyana Scheme under Languishing Projects LUP Code-2356
Rate contract for laying of 11KV line on 8Mtr and 9 Mtr ST Poles using 120mm2 AB Cable at different locations within the jurisdiction of Electric Division-II Jammu on turnkey basis during the Financial Year 2024-25
Supply Erection Testing Commissioning of 11KV line with 3Cx185mmsq XLPE armoured Cable and ACSR Rabbit conductor for bifurcation of 11KV Simbal-1 feeder emanating from 33/11KV, 2x10MVA Receiving Station Miran Sahib on turnkey basis (LUP-1396)
Construction of New 11KV Dedicated feeder from Receiving Station Phorupeth for wss Haripora upto Lift Station Haripora under JJM Programme and Further Extension of 11Kv Line from Left Station Haripora to Filtration Plant Haripora C under JJM
Construction of New 11KV Dedicated/Essential feeder from Receiving Station Safalpora to water supply Scheme Deedarpora and Further Extension of 11KV Line stage II from Water Supply Scheme Deedarpora to Badra Payeen Stage II . (WSS Badra Payeen)
Erection of LT LINE
HT and LT Line
Laying of LT line
Creation of 100 KVA Distribution Sub Stations along with Laying of HT Line on turnkey basis at various locations of Sub Division Vijaypur for PHE installations under Jal Jeevan Mission within the jurisdiction of Electric Division Vijaypur, Jammu
Creation of 250 KVA Substation along with Laying of HTand LT line for 350 LPM Oxygen Generation Plant at Sub District Hospital Bhaderwah, in respect of Electric Sub-Division Bhaderwah JPDCL Doda
Supply Erection Testing and Commissioning of 100 KVA Sub Station along with laying of HT line at WSS Panjgrain under Languishing Scheme on Turnkey Basis Under the jurisdiction of JPDCL Electric DivI Parade Jammu
Supply Erection Testing and Commissioning for Creation of 25 KVA Sub-Station and HT line at Rotary Indira Chowk Jammu Under the jurisdiction of Electric Division Div-I JPDCL Jammu On Turn Key basis
Supply Survey Erection Testing and Commissioning for creation of 100 KVA sub station along with HT Line at BOREWELL CHAMALWAS UPPER SHALGADI under WSS Chamalwas JJM under the Jurisdiction of Electric Division JPDCL Batote
Shifting/Laying of 11 KV HT Line and Isolation Point at Talimorh, Nandpur Morh, Miran Sahib under Capex Budget ( Scheme Code PDDSS2425100400) on Turnkey Basis under the jurisdiction of Elect. Div-II JPDCL, Jammu
Supply, Erection Testing, Commissioning of DC 33 KV line and other works works for newly under construction Receiving station KULDABI
Supply, Erection, Testing and Commissioning of 100KVA Substation along with HT/LT line in Phallian Mandal Block, Village Rambagh under Seema Samridhi Yojna 2023-24 on turnkey basis (Scheme Code- PLNDC2324-101131)
Supply Erection Testing and Commissioning of 100 KVA 63 KVA Sub Stations laying of HT LT line along with isolation point in respect of Elect DIVI JPDCL Parade Jammu On turnkey basis
Supply, Erection, Testing and Commissioning of 100KVA Substation along with HT/LT line in R S Pura Block, Village Bega under Seema Samridhi Yojna 2023-24 on turnkey basis.Scheme Code- PLNDC2324-101250
Supply, Erection, Testing and Commissioning of 100KVA Substation along with HT/LT line in Arnia Block, Village Rakh Arnia under Seema Samridhi Yojna 2023-24 on turnkey basis.(Scheme Code- PLNDC2324-101273)
Supply, Erection, Testing and Commissioning of 100KVA Substation along with HT/LT line in Arnia Block, Village Joian Colony under Seema Samridhi Yojna 2023-24 on turnkey basis. (Scheme Code- PLNDC2324-101301)
Laying of LT line on 8 Mtr PCC Pole using ACSR Weasel at different locations of Chhamb Constituency under SSY 2026 27 in the jurisdiction of Electric Division III on turnkey basis
Laying of LT line on 8 Mtr PCC Pole using ACSR Weasel at different locations of Marh Constituency under SSY 2026 27 in the jurisdiction of Electric Division III on turnkey basis
Erection Testing and Commissioning of 11 KV HT Line on 9mtrs PCC Poles with ACSR weasel Conductor for providing dedicated 11 KV feeders for Pump sets with in The Jurisdiction of Sub Division III Miran Sahib
Construction of 33KV line using 100 Sq mm ACSR Conductor on 13-11 Mt long S T Poles including two 4 pole structure both sides on 200Mt long Sandren River Crossing from R st Nowgam Chowgund to Under construction receiving Station Qamar Shabad.
. Creation of 63 KVA Sub Station alongwith HT.LT Pyt. Dhandal West near the house of Sh. Faqir chand Ramnagar 2. Shifting of HT line from School Ground Premises IMP Academy Krimachi for ED Udhampur
Creation of 03 Nos 100 KVA Sub Station alongwith HT LT line at Boura in respect JPDCL Electric Sub Division Kathua of Electric Division Kathua under JJM Scheme
Shifting of HT line Khan mohalla ward 8 Tanghar A near the houses of Mukhtar Sheikh, Zahid Sheikh, Iqbal Khan, Shameem Khan and Naseer Khan Block Tanghdar under District Capex Budget (PRI grants) 2024-25.
Improvement of LT network at (Alamdar Colony Anchidora) and installation /Laying of HT relocation of HT line from congested area to (Raod at Donipawa from Checkpost to Ziyarat Sharief Anantnag). Under CDF Scheme-44-Anantnag
Supply, Erection, Testing, Commissioning for Creation of 100 KVA Sub-Station, laying of HT Line, Tapping Point on 9 Mtr Long ST Pole under JJM WSS Simbel lehad at Proposed Dugwell site upper Simbel Lehad