Loading…
Loading…
3,980 results • Best match
VARIOUS SITE 11 KV LINE MAINTENANCE AND OTHER WORK
construction of 11 kv line and other associated work
VARIOUS SITE 11 KV LINE MAINTENANCE AND OTHER WORK
Work related to shifting in 11 KV line NJVVN
11 kv line shifting work under EDD siddharth nagar
11 KV LINE GAURDING WORK FOR DFCCIL ROHANA KALA
SHIFTING OF 11 KV LINE UNDER EDD III MEERUT
11 kv line shifting work under EDD siddharth nagar
Work for Prepare New 11 KV Line, EDD Budhana
Protection and other miscellaneous works for the 33 kV line (BP 2026-27)
For the Work of Additional Business Plan 2023-24 of Replacement of Damage Pole, HT 11 KV Line by XLPE Cable and Guarding of HT Line for Safety Purpose Work EUDD-II, Meerut.
Strengthening Work of 33 KV Line, Strengthening Work of 11 KV Line, Strengthening and Protection of 33 11 KV Sub-stations, 11 KV VCB Work, 33 KV VCB Work, Switch Yard Work 11 0.4 KV Distribution Transformer Plinth Fencing Earthing Work BP 2026-27
CONSTRUCTION OF NEW 33/11 KV SUBSTATION WITH 2X5 MVA POWER TRANSFORMER FOR PHOOLLI, DIST. GHAZIPUR, CONSTRUCTION OF NEW 33 KV LINE AND 11KV LINE FOR 33/11 KV SUBSTATION PHOOLI, DIST. GHAZIPUR ON SEMI TURNKEY BASIS.
CONSTRUCTION OF NEW 33/11 KV SUBSTATION WITH 1X5 MVA POWER TRANSFORMER FOR BAURI, DIST. GHAZIPUR, CONSTRUCTION OF NEW 33 KV LINE AND 11KV LINE FOR 33/11 KV SUBSTATION BAURI, DIST. GHAZIPUR ON SEMI TURNKEY BASIS.
Construction of 33 KV Line and Metering work at Biofule Campus IOCL, Dhuriyapar Distt. Goprakhpur.
Repairing and Improvement of 33KV Line U.P.S.I.D.C and 33KV Line Naipura, District Amroha.
CONSTRUCTION OF 33 KV LINE FROM 132 KV S/S DOHNA TO CIVIL ENCLAVE (AIR PORT), BAREILLY.
Supply of Materials for Construction of 33KV Line and Erection work, Increasing Capacity of Power T/F installed at various Sub-Stations, Repairing and Replacement of 33 KV Switchyard equipments, Strengthening of 33 KV line etc. under EDC Fatehpur
Supply of Materials for Construction of 33KV Line and Erection work, Increasing Capacity of Power T/F installed at various Sub-Stations, Repairing and Replacement of 33 KV Switchyard equipments, Strengthening of 33 KV line etc. under EDC Fatehpur
Supply of Materials for Construction of 33KV Line and Erection work, Increasing Capacity of Power T/F installed at various Sub-Stations, Repairing and Replacement of 33 KV Switchyard equipments, Strengthening of 33 KV line etc. under EDC Pratapgar
Construction work of 33 KV line from 132/33 KV Transmission Primary Substation-Pashahi, Sonbhadra to 33/11 KV Power Substation-Ranitara.
11 KV Line Nirman Bifurcation under EDC I MBD
Construction of 33KV line
33 KV LINE SHIFTING WORK IN DEPOSIT SCHEME UNDER EDD 1 MORADABAD.
Construction of 33 KV Line of 33 11 KV Substation nanpur moradabad
33 KV LINE SHIFTING WORK IN DEPOSITE SCHEME UNDER EDD 1 MORADABAD.
33 KV LINE SHIFTING WORK IN DEPOSIT SCHEME UNDER EDD 2 MORADABAD.
33 KV LINE SHIFTING WORK IN DEPOSITE SCHEME UNDER EDD 1 MORADABAD
Construction of new 33 kv line under EDD-V and VI AZAMGARH
33 KV Line Isolator 400A/800A 33 KV Bus Isolator 400A/800A
Construction 33 KV line and line maintenance under EDD-1/2 Azamgarh
SHIFTING OF 33 KV LINE UNDER DEPOSIT SCHEME UNDER EDD IV MEERUT
33 KV Line Isolator 400A 800A 33 KV Bus Isolator 400A 800A
VARIOUS SITE 33 KV LINE MAINTENANCE WORK IN BUSINESS PLAN 2024 25
08 No. Different Strengthening works and 33 KV line Majhauliraj Disttl Deoria
Construction of 33 kV Line from Bhatwaliya to Rampur Karkhana Distt Deoria
The strengthening of 11 kv line/LT line and capacity enhancement of distribution transformer of newly border extended area in nagar nikay under deposit scheme 2022-23 in Juridiction of EE EDDI BHADOHI
CONSTRUCTION OF NEW 33 KV LINE FOR 33/11 KV SUBSTATION DEVKALI 2X5 MVA CAPACITY FROM 220/132 KV G.I.S AYODHYA, DISTT-AYODHYA
Miscellaneous maintenance works on Tubular poles of 33 KV Line to maintain the Substation supply
Shifting of 11 KV line of Central School, GT Road, Etah in deposit scheme under EDD IInd Etah.
Construction of 33 KV Line from 132 KV S/s FCI-II to Surajkund S/s Gorakhpur
Proposed work for Maintenance of Damaged 33KV Line at various place under E.D.D.-IIIrd, Mathura
Construction of new 33 kv line New Duddhi enamated from 132/33 kv s/s Myorpur, Sonbhadra (Semi-Turnkey)
Work of 11 KV Line Shifting Under EDD Ist Chandpur
WORK PROPOSED 11 KV LINE SHIFTING WORK UNDER DEPOSIT HEAD
11 KV line bifurcation on semi turnkey under EDD-III
2 No 11 KV LINE CONSTRUCTION AND FEEDER BIFURCATION WORK
Work of 11 KV Line Shifting Under EDD Ist Chandpur
Construction of Work of 11 kv Line under Deposit Plan
Change of 11 KV Line and pole Under EDD Farrukhabad