Loading…
Loading…
5,623 results • Best match
M C road from Longwood Chowk to Green Gate in ward No 1 Bharari RD 0 0 to 0 505 (SH Construction of Retaining wall etc RD 0 95 to 0 103)
Restoration of rain damages on road leading to Petrol Pump Vikas Nagar to Tilak Raj House in ward No 29 (SH Construction of Retaining wall at RD 0 150 to 0 160)
RR of LWSS Solang Saskir in GP Solang in Tehsil Jubbal Distt Shimla HP SH Repair and renovation of pump house Extracting of filter media and construction of plum concrete Retaining Wall
Construction of Pucca Path alongwith Retaining wall for the House of Sh. Ashwani Kumar S/O Sh. Birbal Singh etc. Ward No-3 village Janera G.P. Khajjan Tehsil Nurpur Distt. Kangra (H.P.)
M/R to Lower Summer Hill during 2023-24. SH: Repair and Restoration of damaged and settled retaining wall and front courtyard of CPWD Workers quarter Block at Lower Summer Hill, Shimla
A/R & M/O to Residential & Non Residential building at IIAS R.P. Niwas Shimla during 2023-24. SH: Provision of gravity retaining wall near Squire Hall, IIAS Campus at R.P. Niwas Shimla.
A/R and M/O to DPRA under Lower Summer Hill Section, Shimla during 2025-26. SH: Restoration/provision of retaining wall infront of E-barrack at Lower Summer Hill, Shimla (H.P.)
M/R to GPRA Grand Hotel, Shimla during 2023-24. SH:- Protection of earth near front side of old Lounge Block Gallery by provision of retaining wall at Grand Hotel, Shimla (H.P.)
(NDF/2026/47) Restoration of rain damages various LWSS Sherpur in GP Binga in Tehsil Dharampur Distt. Mandi HP (SH. C/O retaining wall for protection of filter bed and sump well)
Tender for Reconstruction of damaged retaining wall and concreting on upside bench at Tower No.138 of 132KV D C Transmission Line from Larji to Kangoo under Electrical System Division HPSEBL, Bilaspur
Restoration of rain damages to various residential qtr Under Brock hurst Shimla 2.SH Construction of Retaining wall in approach road to type 1 set no 1 to 24 at Brock Hurst.
Construction of Water Harvesting Structure and Gabion Structure at Dehi Chhapper Nala in Rangas Beat Nadaun Block in Nadaun Range of Hamirpur forest Division during 2021-22.
2. Construction of Wire created Gabion wall on Bathed Khad RD 810-930 Left Bank RD 1080-1200 Right Bank RD 1230-1290 Right Bank Under SDMF
Restoration of Rain Damages on Kalsuin to Tralla road Km. 0/0 to 4/500 (SH Construction of Gabion Wall at RD 1/220 to 1/230 )
Improvement of Road Safety on NH-70 from Km 58 400 to Km 114 0 by Providing and fixing Thrie Metal Beam Crash Barrier Construction of Retaining wall Breast wall Construction of U-Shape drain with edge wall and Providing and fixing of Sign
Construction of Retaining wall at R.D. 0/135 to 0/145, 0/195 to 0/205, 0/230 to 0/265, 0/350 to 0/380 and Breast wall with V-shape drain at R.D. 3/630 to 3/705). Under Chief Minister Announcement work.
SH Construction of PCC Retaining wall at damaged portion occurred due to heavy slide at front side building of JE quarter at JS Section Balera
C/O Breast wall at RD 7/050 to 7/067.90(DC Deposit)
C/O PCC. Breast Wall between km RD. 0/0 to 0/100
(Sub Head -Construction of Breast wall at km 0/740 to 0/765).
Construction of wire crated Breast wall at R.D. 12/180 to 12/230).
Construction of Breast wall at RD 14/300 to 14/330) PDNA 2023
Construction of crate work Breast wall at R.D. 0/225 to 0/250
Construction of wire crated Breast wall at R.D. 10/750 to 10/775
C/O Breast wall at RD 14/200 to 14/217.90 ( DC Deposit
Construction of PCC Breast wall at R. D. 23/480 to 23/490)
Construction of PCC Breast wall at R. D. 2/520 to 2/550
SH Co RCC Counterfort Breast wall at RD 0 900 to 0 910
Construction of Breast wall between reach at RD 5/540 to 5/900
(Sub Head - Construction of Breast wall at km 1/465 to 1/480)
(Sub Head - Construction of breast wall at Km. 0/050 to 0/062)
C/o Breast wall at RD 1/920 to 1/953) Under SCSP
C/O Wire crates Breast wall between RD. 14/660 to 14/676.80
(SH Construction of breast wall for protect the sedimentation tank and filter unit)
C/O Wire Crated Breast wall at RD-4/240 to 4/270)
(C/O wire Crated Breast wall at RD-3/720 to 3/740).
Construction of Breast wall at RD 7/060 to 7/085)(under PDNA).
Tender for Construction of damaged retaining wall for water conductor system and wire crates ,trash rack cover at Weir site Sach HEP 2X450 MW under ESD HPSEBL Sach (U) PVED Killar under (OP) Circle HPSEBL Dalhousie.
A/R & M/O to residential/non residential building at NAAA, Yarrows, Shimla during 2024-25. SH: Repair to toe wall, drain gratings, repair of settled path, repair of polycarbonate roofing sheet and repair of existing manholes at Yarrows campus at ... of toe wall , ...
C/O Link Road from Nilawas to Dhalet Road Km 0/0 to 1/00 (SH- P/L Gr.I in Km 0/500 to 1/00 , Gr.II , Premix carpet in Km 0/00 to 1/00 and C/O Breast/wall at RD 0/160 to 0/200)
Restoration of rain damages on Sanaba Tippari Road Km 0.0 to 1.0 SH Removal of slips at various RDs,Curve cutting at RD 0.065 to 0.085,0.150 to 0.170,Rwall at RD 0.295 to 0.300,CO Breast wall at RD 0.585 to 0.600,unlined drain km 0.0 to 0.600
C/O D/S Toe wall, Flooring an R/Wall
SH Construction of Retaining walls U-Shape drain GSB and RCCP in different RDs
Construction of retaining walls laying paver blocks Metalling/Tarring and drain in various RDs
SH ROFD Retaining walls and CD work in km 0/0 to 0/300
Formation cutting, retaining walls, cross drainage work, metalling and tarring, side drain and parapets
SH Formation deficiency and construction of retaining walls in Km0/00 to 2/500
construction of retaining walls for protection of school building and development of play ground
SH Construction of retaining walls at various RDs Hume Pipe Culverts and Slab Culvert
SH ROFD Retaining walls and CD work in km 0 0 to 0 300