Construction of Paver block road including Protection wall at various locations under the ward no 22 UMC UDP 2026 27. Length of P wall 180.00 m and Length of Paver block road 180.00 m.
Construction of RCC protection wall and Paver Block road from the house of Tanay Ranjan Saha to Anil Das at Ward No 19 under Udaipur Municipal Council during the year 2024_25 Total Length 138.60 m.
Mtc. of road from Duganga to Ditlang under Damcherra Sub-Division during the year 2020-21SH Construction of R.C.C. protection wall at ch.0.80 km, Length 8.00 mtr and ch.02.20 km, Length 9.00 mtr.
FDR/ Urgent Repair of Road from Bat tala to Radha nagar and Chotu kutna to Sanitala market ( L- 4.34 Km) during the year 2024-25/ SH WBM-3, patch repair, Carpeting, protection wall etc. complete.
Urgent FDR of road from Vanghmun to Sabual (Near Tlangsang Village) under Jampui Hill Sub-Division, PWD(RnB) during the year 2023-2024 SH RCC Protection wall at CH. 9.00 Km (Approx.) Length 27.25 mtr.
Urgent mtc of road from Burighat Bazar to Burighat Bridge under Dasda Sub-Division,PWD(RnB) during the year 2025-26/S.H Construction of R.C.C protection wall(right side), pucca drain and approach slab etc.
Mtc of road i Khedachera PHC approach road ii Khedacherra Panchayat approach road iii Khedacherra Duganga road to Kalagang para iv Construction of Gravity protection wall at Damcherra to Khedacherra road under Damcherra Sub Division
FDR of road from South Anandanagar to Dukhiya kubra during the year 2024_2025_SH Strengthening of RCC Box Cell culvert at Padmamohan Para by construction of wing wall, protection wall, appron along with other allied works
Protection work by construction of CC Block toe wall at the damaged portion, patch repairing etc.
SH Patch Metalling, Grouting, Re-carpeting ,bats filling,toe wall ,Solling and allied works.(Gr-2)
SH- Formation, brick soling, Toe wall etc. from ch.0.00 Km to 0.496 Km.(Balance Work
Construction of (i) CC road with drain from Pankaj Boul to Anjan Bhowmik house (ii) RCC retaining wall from Subash Majumder house to Anjan Bhowmik house (iii) Construction of new brick soling road from Anjan Bhownik house to Madan Das house at Matri
Maintenance of road from Damcherra Khedacherra Road to Uttamjoy Para via Tabjirai Para at CH.1.20KM L S under Damcherra Sub Division, PWD R and B during the year 2025 2026 SH Patchmetalling, carpeting. seal coating,RCC retaining wall, WBM 3, Pavers
Mtc. of road starting from NH-08 at Jawharnagar (Near BSF Camp) to Babukumar (Length - 9.20 Km) during the year 2025-2026/ SH- Constn. of R.C.C Retaining Wall at Ch.4.79 Km(R/S),7.41 Km (R/S) and 8.15 Km(L/S).
Periodical renewal of completed PMGSY Road (Link L-032, part) from Dumra karidak to Tulsiram para, (L- 2.067) under SJTNY (SL No-204)/ SH Patch WBM-3, Carpeting, Pucca drain, Retaining wall, unlined surface drains etc. complete. Ch 0.0 Km to 2.067 Km
Mtc of road from Jalabassa to Bhandarima from Ch. 41.50 Km to 54.07 Km (Total Length- 12.57 Km) under Dasda R.D. Block during the year 2025-2026/SH- Patch metalling, Re-carpeting, Seal coating, Pucca Drain, Retaining Wall, Surface Drain, etc. from C
Maintenance of brick soling road from Nehru Smriti Sangha to Adhi Loknath via Ranjit Datta house by constructing retaining wall and new brick soling at W/No-7 of Belabar under Dukli R.D. Block DT-5 dt 23-10-2019 2nd Call
Mtc. of road starting from NH-08 at Jawharnagar (Near BSF Camp) to Babukumar (Length -9.20 Km) during the year 2025-2026/ SH- Constn. of R.C.C Retaining Wall at Ch. 4.79 Km(L/S), 7.13 Km(L/S) and 7.28 Km(L/S).
Const. of 2 nos RCC foot bridge under RD Manu Division namely i) over Hajatwisa cherra at Juri Kr. para VC, approach road with RCC Retaining wall under Chawmanu RD Block ii)Over Bhaibooncherra at Lalitdhan para under Chawmanu RD Block.(2nd call)
Improvement of road from near Asha Holy Cross to Agartala-Simna road (Awja Restaurant) during the year 2024-25/SH Flat soling, edge soling, WBM-3, carpeting, seal coat, Side berm dressing and construction of retaining wall. (L-1.50 km)/2nd Call.
Layrng of CC interlocking paver block on road surface from pwd road to towards Rahim Miah house at ward no 09 under Melaghar MC during the year 2022 23 SH Laying CC paver block const of RCC retaining wall and side wall
Improvement of road from Chandrapur to Aralia Bridge Embakment RoadL1200.00 mtr SH Construction by GSB, WMM, BM, BC and retaining wall under ward No 25 of AMC under Scheme of Special Assistance to states for Capital investment for 2024 25 Re surfacei
Periodical renewal of completed PMGSY road from Twichakma to Garjan tilla Length-3.250 km Link No L-056 under Ampi Sub-Division SH- Surface Drain, Road side pucca Drains, Landslide Clearance, Retaining wall, WBM-3, PMC, Sand seal coat etc. during the
Approach road filling including bank of cheera and construction of retaining wall and CC Block to protect of bank of cheera (length-16 mtr) over the RCC Foot Bridge of Nilmani Para over Champacheera at Paschim Champacheera VC under Tulashikhar RD Blo
Improvement of Road from Chandrapur Bazar to Aralia Bridge embankment road L 1200.00 mtr SH Construction by GSB, WMM, BM, BC and retaining wall under Ward No. 25 of AMC under Scheme for Special Assistance to States for Capital Investment for 2024
Mtc. of road starting from NH-08 at Jawharnagar (Near BSF Camp) to Babukumar (Length - 9.20 Km) during the year 2025-2026/ SH- Constn. of R.C.C Retaining Wall at Ch. 6.562 Km(L/S), 6.73 Km(L/S) and 6.80 Km(L/S).
Construction of C.C. Road, Brick soling, Retaining wall and drain works at different location under 13 Pratapgarh Assembly Constituency under BEUP Scheme SH I Const. of Soling and C.C Road approx 100 mtr. near the Ho Bimal Deb to Ratan Das under Ward
Improvement of road from Chowkider hour para to Tulashikhar Brindaban ghat road length 1.50km from Ch 1.00Km to Ch 1.50 Km under Tulashikhar RD Block during the year 2025 26 SH GSB, WBM 2 and WBM3, Carpeting, Seal coat, Retaining wall and protection
Improvement of Road from Bagabhan Thakur Chowmuhani to Kathakhal embankment via Vulcan club L 700.00 mtr SH widening by GSB, WMM, BM and BC retaining wall under Ward No. 23 of AMC under Scheme for Special Assistance to States for Capital Investment f
Improvement of Road from Bagabhan Thakur Chowmuhani to Kathakhal embakment via Vulcan club L 700.00 mtr SH widening by GSB, WMM, BM and BC retaining wall under ward No. 23 of AMC under Scheme for Special Assistance to States for Capital Investment fo
Imp of road by brick soling, retaining wall i. H.O Dipankar Deb to H.O Mani Saha at NarayanpurAmbedkar Colony ii. H.O Partha Das to pond of Durga Ch. Sarkar at Narayanpur iii H.O GopalDebnath to H.O HariprasadChakraborty at Madhya Bhubanban, W.02
a. Const of CC road and retaining wall started from H.O Bishnu Rudra Pal via H.O Naru Rudra Pal to H.O Sankar Pal at Palpara b. Mtc of drain started from H.O Sankar Pal to culvert at Palpara, under ward no.08, AMC
mprovement of road from Rabicharan para to Chowkider hour para length 1.50km from Ch 0.50Km to Ch 1.00Km under Tulashikhar RD Block during the year 2026 27 SH GSB WBM 2 and WBM3 Carpeting Seal coat Retaining wall CD and protection work etc.
Brick soling, WMM, BM, PMC , retaining wall, CD, Drain etc.
Construction of Retaining wall and Earth filling etc.(2nd Call)
Construction of CC Retaining wall and allied works etc .(Gr.I).
SH- WBM, Carpeting, Seal coat, retaining wall and RCC drain.
SH- Metaling, Carpeting, seal coat, retaining wall etc. (Gr-II)
Retaining Wall, WBM-3, Carpeting, Road side CC Drain etc.
Construction of composite building for Accommodation of different offices of PWD at Capital Complex, Khejurbagan, Agartala/ Construction of internal road, boundary wall, protection wall etc. in/c works of Lower Ground Floor and Upper Ground Floor
SH- widening Of road , Toe Wall, Brick works, Soiling, Earth works etc. ( L-1.00 K.M) GP -I
Construction of toe wall, providing and laying of RCC pipe, pucca drain etc. at Ch. 1.50 km.
Grouting,re carpeting, tack coat,Seal coat, Jungle cutting, unlined drains,pucca drain,toe wall,road marking
Patch soling, patch WBM, Re-Carpeting, road side pucca drain and Toe wall and other allied works
SH- widening Of road , Toe Wall, Brick works, Soiling, Earth works etc. ( L-1.00 K.M) GP -II
Construction of retaining wall at bailey bridge approach,block pitching etc.
Retaining wall, Flat brick soling, Metalling, Carpeting and other allied works
Foundation and substructure, Construction of Superstructure, approach road, retaining wall etc.
SH- Missing Soling, WBM, Cross drain, retaining wall and PMC etc.
Carpeting, Patch WBM, Grouting, Construction of Retaining Wall, RCC Drain etc