Loading…
Loading…
1,144 results • Best match
SH- Construction of Toe Wall , Repairs of Potholes, Carpeting, Re- Carpeting, Protections works, etc. during the year 2024-25
SH Patch soling WBM III road side drain construction of Toe wall laying of Paver Block and allied works
Construction of Toe Wall , Metalling, Repairs of Potholes, Carpeting, Re- Carpeting, Protections works etc. during the year 2024-25.
Missing soling WBM CC pavement Toe Wall Road side protection work carpeting sand seal coating and other allied works
Mtc. of Ambassa - Gandacherra road during the year 2023-24/ SH- Construction of 01 (one) no R.C.C Box Cell Culvert (2.00 m x 2.00 m), C.C Retaining/ Protection Wall in/c road side U Shape Pucca drain at Ch. 21.00 Km.
Improvement of road from Kekomacherra to Ramratanpara from chainage 0.00 Km to 2.00 Km (L-2.00 Km) SH- GSB, WBM-III, Carpeting, Protection wall and drain etc. under Scheme for Special Assistance to States for Capital Investment for 24-25.
Renovation of existing court building at SDJM-cum-Civil Judge (Jr. Div) and Civil Judge (Jr. Div)- Cum-J.M., Teliamura, Khowai, Tripura/SH- Construction of Water reservoir, DG shed including car parking shed, Over head tank and Protection wall in fro
Urgent flood damage repair of road from NH-8 to Haduklau Bru settlement camp (L-3.80Km) /SH-WBM-3, Grouting,Re-Carpeting , seal coat , protection wall,road side drain and providing CC block appron etc from chainage 0.00Km to 3.80 Km .
Renewal of KMA Road to Balaram PMGSY Road (Link no-043) of Length-5.916 Km/SH-WBM-3, Grouting, Re-Carpeting, Seal Coat, Road Side Drain, Protection Wall, etc. (Chainage from 0.00Km to 5.10Km) (Job. No.TP/COM/116/205-26)
Urgent Mtc. of road from Kanchanpur to Machmara under Jampui Hill Sub-Division, PWD(R and B) during the year 2023 2024/SH Protection wall at CH. 13.855 Km Length 10.00 mtr (L/S),Hume pipe and Gunny Bag etc.
Improvement of road from Uttar Thalibari to Gamaicherra Market (L-3.00 Km) under RIDF-XXV (Gap fund, OTPMGSY) / SH Formation, re-soling, metalling, carpeting and sand seal coat in/c protection wall, pucca drain and CD structure etc. Kathalia Block
Urgent Mtc. of road from Kanchanpur to Machmara under Jampui Hill Sub Division, PWD(R and B) during the year 2023 2024/SH Protection wall at CH. 6.87 Km Length 15.00 mtr (L/S),CH.7.09 Km, (Length 7.00 mtr).
Improvement of road from Santi Kali Ashram to Subash Colony via Kani Pathar (L-3.50 Km) under Mohanbhog RD Block under RIDF-XXV (Gap fund) / SH Formation, soling, metalling, carpeting, CD structure in/c protection wall and road side pucca drain.
Construction of Paver block road including protection wall from PWD road to house of I. Sushmita Dasgupta TL 35.00 m II. Dr. K.L. Bhowmik TL 53.00 m III. Ashutosh Das TL 26.00 m under Ward No_10 UMC_UDP_2025_26 Total Length 114.00 m.
CC block pitching/CC retaining wall, brick soling, construction of embankment and etc.
Formation, WBM-II , III, Construction of CD, Retaining wall, PMC Seal coat etc
construction of RCC Retaining Wall Road side pucca drain etc and allied works
S.H- Construction of approach road upto soling stage in/c Retaining Wall etc.
Construction of RCC Retaining wall on settled embankment side and allied works etc.
Re-carpeting, retaining wall, mtc. of bailey bridge and other allied works etc.
Grouting, Patch carpeting, Protection wall, Palasiding, Gunny bags etc.
Protection wall, CC pavement etc at ch 5.70 km
Construction of CD , Protection wall and other allied works.
Const. of Protection wall, CD and other allied works
during the year 2022-23. S.H Pot hole repairs, Patch soling, turfing, palasiding, gunny bag, toe wall etc.(Group- II)
Patch soling , WBM-3 , Carpeting ,Grouting , Brick Toe wall ,in/c side drain etc. (Ch.0.00 km to 3.0 Km).
COMPREHENSIVE MAINTENANCE TO IBB ROAD ID 104, 105, 106, & 107(BP NO. 2075 TO 2125) UNDER SUB DIVISION-I IN SOUTH TRIPURA DURING 2022-23, 2023-24, 2024-25. SH: ORDINARY REPAIR AND PATCH REPAIR, FLOOD DAMAGED REPAIR, RCC CULVERT, RCC RETAINING WALL AND BRICK WORK.(RE-CALL)
Construction of CD (1.50x1.50) mtr, retaining wall, roadside pucca drain and surface drain etc.
WBM-III, Carpeting, Seal coat and retaining wall etc. during the year 2025-26
SH-Grouting, Patch carpeting and construction of Cross drainage structure and retaining wall etc
WBM-3 , Carpeting, Sand Seal Coat, Retaining Wall and other allied works(2nd call)
SH_Soling, WBM_2, WBM_3, Carpeting, Road side drain, CD, Retaining Wall and other allied works
Construction of RCC Box cell 3.00 3.00 mtr 1 no and retaining wall etc.
WBM-III, Carpeting, Seal coat and retaining wall etc. during the year 2025-26
WBM-3 , Carpeting, sand Seal Coat, retaining wall and other allied works(2nd call)
formation, WBM-II and III, construction of CD, retaining wall. PMC and seal coat
S.H WBM-III Grouting Tack Coat Carpeting Seal coat Pucca Drain and Retaining wall
Retaining Wall, Pucca drain Earth Filling, Brick Solling, Pelasiding etc. under Santirbazar Municipal Council.
Construction of Embankment, Toe Wall , Missing Soling, Repairs of Potholes, Carpeting, Re- Carpeting, Protections works, etc. during the year 2024-25.
SH Dismantling and demolishing of existing damaged drains and re-construction of RCC drain and road side kerb, toe wall etc.
Construction of Embankment, Toe Wall , Missing Soling, Repairs of Potholes, Carpeting, Re- Carpeting, Protections works, etc. during the year 2024-25.
Urgent FDR Of existing PWD road under PWD Sub Division No-II, Udaipur , Gomati District during the year 24-25 from Uttar Shalgarah Panchayat to Tepania Bagma PWD road via Dheparpar / SH- Road side drain , Construction of protection wall and allied w
Maintenance of road from Kanchanpur Sub-Jail road to Kanchanpur Helipad road Ch 0.00 Km to Ch1.350 Km (Length 1.350 Km), under Jampui Hill Sub Division, PWD(RnB) during the year 20242025 SH CD, RCC Protection Wall, Drain, GSB, WBM, Tack coat, carpeti
Construction of CC Road including Protection Wall in various spots a.from the house of Mona Guha to Dipak Dey Length 45.00 m. b.from the house of Sankar Dey to Brahmabari Traffic Point Length 161.10 m. Ward No 22 UMC_UDP 2023_24. Total Length 206.10
Maintenance of PWD road from Kar Chowmuhani to Ambedkar Chowmuhani L-2 point 90 KM under Dukli Block during the year 2024-25 / SH Construction of RCC Drain Brick drain Protection wall Grouting Patch Carpeting Premix Seal Coat etc with other necessary
Urgent mtc. of Ambassa - Ganganagar road during the year 2025-26/ SH - Construction of 01 (one) no R.C.C Box Cell Culvert (2.00 m x 2.00 m), C.C Retaining/ Protection Wall in/c road side U Shape Pucca drain at Ch. 24.00 Km.
Maintenance of PWD road from Kar Chowmuhani to Ambedkar Chowmuhani L 2 point 00 KM under Dukli Block during the year 2023_24 SH Construction of RCC Drain Brick drain Protection wall Grouting patch carpeting premix seal coat etc with other necessary w
FDR Construction of Protection wall and Road side Drain from Ranirbazar NIT road to thanda kalibari road under Jirania Sub Division PWD (R and B) during the year 2024 2025 SH Protection work, RCC Drain , WBM III, carpeting, seal coat etc (2nd Call)
Flood Damage and restroration of PMGSY handed over road from Sonamura Boxanagar Road to tilla no 1 Link No 049 L 0.837 km under PWD RandB Boxanagar Sub Division during the FY 2024 25 SH WBM Carpeting Seal coat pucca drain Protection wall
Periodical renewal of completed PMGSY Road (L022) from Subal Mangal to Gomanta para ( L- 1.850 km) during the year 2023-24 under SJTNY (SL No-200) / SH Patch Grouting, WBM-3, Carpeting, protection wall etc. complete Ch. From 0.0 Km to 1.800 Km.