Loading…
Loading…
1,147 results • Best match
SH Construction of approach road SH Retaining Wall Earth filling Metalling Carpetting Block pitching Pucca Drain Etc
SH- Protection of eroded portion embankment by construction of retaining wall, GI wire crates and PMC, etc.
SH- Constn. of R.C.C Retaining Wall at different spots in between Ch. 0.00 km to 5.208 Km.
Retaining wall, drain, bats filling etc. during the year 2024-25 under PWD(RnB),Chawmanu sub-division.
Earth filling soling WBM 2 WBM 3 carpeting with sand seal coat retaining wall and allied works
SH- Metaling, Carpeting, seal coat, retaining wall etc. (portion from 0.573 km to 0.928 km) Gr-II.
SH- Protection of eroded portion embankment by construction of retaining wall, GI wire crates and PMC, etc
SH GSB, WBM 2 and 3, DBM, BC, Retaining wall, CD and protection work etc. Group 2
SH GSB, WBM 2 and 3, DBM, BC, Retaining wall, CD and protection work etc. Group 1
Pot holes repair, Patch metalling, Re-carpeting, Protection wall and other allied works.
Pot holes repair, Patch metalling, Re-carpeting, Protection wall and other allied works.
Soling, WBM-II, WBM-III, carpeting, drain, CD, protection wall, traffic sign etc
Pot holes repair, Patch metalling, Re-carpeting, Protection wall and other allied works.
Missing soling, WBM, Carpeting, CD, Protection wall and allied works under BADP Scheme.
Pot holes repair, Patch metalling, Re-carpeting, Protection wall and other allied works.
Pot holes repair, Patch metalling, Re-carpeting, Protection wall and other allied works
Formation, Soling, RCC Box culvert, Slab Culvert, Protection wall and pucca drain etc.
Brick soling WBM Recarpeting Seal coat Protection wall and CC road maintenance etc.
SH_Widening of existing Soling, WBM, Carpeting, Pucca drain, Toe wall and other allied works portion from 0 point 00 Km to 0 point 54 Km
Earthwork, Erosion Control and Drainage, Granular Sub-bases, Bases (Non-Bituminous), Bases and Surface Courses (Bituminous) ,Box Culvert and Toe Wall and Traffic signs etc.
Earthwork,R wall, toe wall,patch metalling,jungle cutting etc. during the year 2024-25 under PWD(RnB),Chawmanu sub-division, at Ch. 13.50 km.
Patch Soling WBM Prime Coat Tack Coat Carpeting Seal Coating, Toe Wall, , Earth filling Work Road Side Drain Markings and Road signage etc under NABARD
FDR and Mtc. of K-M-A road and mahabir to Chankapbasti road under the jurisdiction of Kamalpur Sub-Division during the year 2024-25/SH- Protection wall etc. at Ch. 10.365 Km on K-M-A road and at Ch. 0.38 km on Mahabir to Chankapbasti road.
Construction of CC road including some portion of protection wall at various spots a. NH to the house of Bablu Datta Length 65.00 m b. From the house of Haradhan Das to Anil Malakar Length 47.50 m (c) From the house of Dulali Bibi to Momin Hossain Le
i Imp. of road by protection wall and laying by paver block at ward ofiicepara ii Mtc. of road by laying paver block at Natun Nagar fish and meat market side road iii Imp. of road by laying paver block at Kalyanpur Para, under ward no.03, AMC
Construction of Paver Block road including Protection wall and R.C.C Cover Drain in Various Locations from 1. PWD Road to House of Sudhama Taran L 35.00 m 2. PWD Road to Swapan Roy L 50.50 m 3. Najir Islam To Satu Miah L 46.00 m Drain and Pvr Block
Construction of M. Drain with cover slab and Paver Block road including Protection wall at various locations a. From PWD road to the house of Niranjan Baras b. From the house of Dilu Miah to the house of Samu Miah c. From PWD road to the house of Tah
SH GSB WBM carpeting sand seal coat Road side pucca drain RCC Retaining wall etc and allied works
SH GSB WBM carpeting sand seal coat Road side pucca drain RCC Retaining wall etc and allied works
Construction of 1 no CD(1.00m x 1.00m), RCC retaining wall and pucca drain , Patch carpeting, seal coat
SH- Construction of Retaining Wall, Pucca Drain etc. at Ch.1.50 km under Rupaichari PWD(RandB) Sub-Division
SH GSB WBM carpeting sand seal coat Road side pucca drain RCC Retaining wall etc and allied works
Re-soling metalling carpeting road side drain and retaining wall etc portion from ch 1.00km to 3.00 km
SH GSB WBM carpeting sand seal coat Road side pucca drain RCC Retaining wall etc and allied works
Soling, Metalling, Carpeting, Grouting, Recarpeting, Pucca drain, Protection Wall and other allied works./ 3rdCall.
Construction of one no Box Cell 1.00 x 1.00 m , C.C Protection Wall etc.
Bituminous grouting, Patch metalling, Re-carpeting, construction of protection wall and other allied works
Bituminous grouting, Patch metalling, Re-carpeting, Const. of Protection wall and other allied works.
Bituminous grouting, Patch metalling, Re-carpeting, Const. of Protection wall and other allied works
Restoration of collapsed part of compound wall by construction of RC C retaining wall Manughat District Dhalai Tripurta BA
Construction of CC gravity retaining wall at pond site and barded weir boundary wall at North side(Part-3).
SH- R.C.C. Retaining Wall , C.C. Blocks, Construction of Embankment, Filter media, Flat Brick soling, WBM-III, Paver Block etc.
Construction of cover drain some portion of CC road including protection wall at various spots a.house of Rabi Gazi to house of Babul Miah L 47.00 m. b.house of Rabi Gazi to Ahar Miah L 12.70 m. c.NH to house of Rajib Biswas L 40.00 m. Ward No 21 UMC
Construction
ii. CC wall and Barrier at Railway Goods Yard Road under PWD (RandB) Sabroom Sub-Division.
under Santirbazar Municipal Council.
Raising and widening of embankment ,Cement Concrete Block,Flat brick soling, Toe Wall along with other allied works at ch 0.60 km to 1.215km(Group No-I)
SH- construction of retaining wall, laying of CC block, soling, WBM-III, Carpeting etc. ch 0.94 km to 1.00 Km.
SH- Surface Drain ,Road side pucca Drains, Landslide Clearance, Retaining wall, WBM-3, PMC, Sand seal coat etc. Group- I.
SH- Construction of a RCC box culvert (Clear 1.5 mx1.5m) brick masonry retaining wall and drains along with allied works.