Loading…
Loading…
1,146 results • Best match
SH- Constn of RCC Retaining wall with 1.50 mtr x 1.50 mtr opening RCC Box-cell and other allied works.
Construction of RCC Retaining wall, RCC road side drain, patch soling, patch matelling, grouting, Re-carpetting and other allied works
SH GSB Patch Metalling Re Carpetting including Construction of Toe wall,Pucca Drain and unlined Surface drain etc Portion from Ch 0.00 km to 1.195 Km Gr I
Patch metalling, Bituminous grouting, Re-carpeting, Brick masonry toe wall, Road side pucca drain, Road side katcha drain, Stripping of excess soil from shoulder and other allied works
Grouting, Patch Soling, Patch WBM-3, Carpeting with sand Seal coat, RCC Toe wall, CC Block pitching, RCC Pucca Drain, V-shape Pucca drain etc. other allied works.
Raising and widening of embankment ,Cement Concrete Block,Flat brick soling, Toe Wall along with other allied works at ch 1.215 km to 2.69 km(Group No-II
CONSTRUCTION WORK
CONSTRUCTION WORK
Periodical maintenance of road from US Road - Manughat Para to Mandali Para (Link No. L038) (Length- 2.419 km) under Suvarna Jayanti Tripura Nirman Yojana Scheme under Satchand Block in PWD (R and B) Division, Sabroom during the year 2023-24
SH- WBM-III, Carpeting, paver block ,Road side drain and protection wall etc.( L-4.20 K.M).
GSB, metalling, carpeting, seal coat, protection wall, RCC box cell culvert and other allied works etc.
Patch Soling, Patch WBM, Re-Carpeting, Road side pucca drain, Protection Wall and other allied works.
SH-soling, WBM-III, carpeting, Protection wall and drain etc.(Ch. 1.50 km to 2.50 km).
Patch metalling, Pot holes repairing, Re-carpeting, Tack coat, Seal coat, Const. of protection wall etc.
Re-carpeting, Patch metalling, Patch grouting, Seal coat, Box culvert, Protection wall and other allied works.
Re-carpeting, Patch Metalling, Patch grouting, Seal coat, Box culvert, Protection wall and other allied works.
SH Re-grading, widening, metaling, B.M, carpeting, retaining wall, Box- cell culvert etc. (Job No.TP/COM/120/2016-17) (6th Call)
Building portion G4 storied including internal water supply sanitary installation sewage and drainage works Boundary wall retaining wall and Road Works
Extra Ordinary Repair of Indo Bangladesh Border Road in the State of Tripura IBBR- 92, 92(A), 92 (B) & 93 at various locations identified of total length 20.77 Kms between BP 1842/3RI to 1885/MP of 20 BN BSF (HQ Panisagar), Dharmanagar, Tripura ... Foundations, Retaining Walls , ...
Extra Ordinary Repair of Indo Bangladesh Border Road in the State of Tripura IBBR- 92, 92 (A), 92 (B) & 93 at various locations identified of total Length 20.77 Kms between BP 1842/3RI to 1885/MP of 20 BN BSF (HQ Panisagar), Dharmanagar, Tripura ... Foundations, Retaining walls , ...
Protection work.
Modern/civil works
Construction of Brick masonry retaining wall (L 78.00 mtr) at Aralia from Box culvert to Harbal Das pond under Bishramganj Sub-Division
SH GSB WBM2 WBM3 Carpeting Construction of Pucca drain RCC Covered Drain Box culvert Retaining wall and allied works at different stretches
Construction of approach road by Soling, Metalling, Paver block, C.D. structure, Protection wall and other allied works.
Construction of Protection wall on the road from NH-08 to Naliamura and NH-08 to Barabhaiya.
Widening, Patch soling, WBM-2, WBM-3, carpeting, road side pucca drain, protection wall and allied works.
Widening, WBM-III in patches, Patch repairing, Re-Carpeting, Pucca drain, Protection wall and allied works etc.
SH GSB WBM carpeting sand seal coat Road side pucca drain Protection wall etc and allied works
Raising and widening of embankment by earth filling, Double layer soling,C. C Block,Toe wall, along with other allied works at ch 0.65 km to 1.30 km(Group No-II)
Construction of Bailey Bridge approach by Soling, Metalling, Carpeting and Construction of Toe wall, Supplying and fitting fixing of various missing parts, replacement of various damaged parts for bailey bridge etc.
Stripping of excess soil Patch soling WBM carpeting sand seal coat Road side pucca drain RCC Retaining wall t etc. and allied works
Stripping of excess soil, Patch soling WBM carpeting sand seal coa Road side pucca drain RCC Retaining wall t etc and allied works
Protection work.
CONSTRUCTION WORK
Construction of Protection wall and other allied works at OHT Kanchanpur SDH Tilla under DWS Sub-Division Dasda.
SH- Construction of RCC return wall for protection of road side erosion, toe wall, patch metalling, Patch Carpeting, seal coat etc. under PWD (RandB) Rupaichari Sub-Division during the year 2024-25
patch Soling, Metalling, Carpeting, roadside drain, Retaining wall and other allied works under PWD (R and B) Sub-Division during the year 2024-25
SH - Const. of Boxcell (4m x 4m), wing wall, Retaining Wall etc. during the year 2024-25. (portion from 0.00 km to 15.10 km)
Brick Soling, WBM II, WBM III,Carpeting, Seal coating, Pucca Drain, Surface Drain, RCC Protection wall etc. 2nd Call
SH-soling, WBM-III, carpeting, Protection wall and drain etc.(Ch. 0.50 to 1.50km and 2.50km to 2.995 km).
WBM-II, WBM-III, Carpeting with sand seal coat, Protection wall, Road side pucca drain and other allied works.
CONSTRUCTION
SH- Patch GSB, WBM Grading-3, Re-carpeting, Seal coat, Brick masonry retaining wall, Road side pucca n Katchaa drain, road marking and signs etc.
SH-Construction of 2 nos Single cell RCC Box Culvert (2.00 m x 2.00 m), Bricks Retaining Wall, Earth Filling, Soling etc. under BADP Scheme
SH-Edge soling, Retaining wall , Cover slab, Brick massionry drain and Old brick masionry drain clean etc.during the year 2019-2020(Based on SoR-2020).
Subgrade, GSB, metalling, carpeting, Retaining wall, kutcha drain, pucca drain, etc.L-2.30 km under Scheme for Special Assistance to States for Capital Expenditure-Part-III