Loading…
Loading…
1,147 results • Best match
patch metaling, GSB, grouting, re-carpetting, sand seal coat, RCC retaining wall, Pucca Drain and protection work etc. portion from 3.067 km to 6.11 km.
SH- Surface Drain , Road side pucca Drains, Landslide Clearance, Protection wall, WBM-3, PMC, Sand seal coat etc. Group-I
CONSTRUCTION WORK
Construction work
CONSTRUCTION
Bituminous Grouting, Patch Metalling, Re-carpeting, Const. of Protection wall, Mtc. of 1 (One) no. slab culvert and other allied works.
GSB, WBM-III, Carpeting, protection wall and road side, Pucca drain and Trafffic Sign, Marking etc during the year 2023-24.
CONSTRUCTION WORK
SH- Formation, flat brick soling, road side pucca drain, retaining wall and CD etc under the Scheme for Special Assistance to States for Capital Expenditure- Part III.
Construction of Cement Concrete Gravity Retaining Wall (L-33.00 Mtr) and Rehabilation of damaged wing wall of Das Para Slab Culvert, Re-carpeting and Patch Carpeting etc.
Raising and widening of embankment by earth filling, Double layer soling,C. C Block,Toe wall, Reconstruction of Sluice gate (Flap Shutter) along with other allied works at ch 0.00 km to 0.65km(Group No-I).
Raising and widening of embankment by earth filling, Double layer soling,C. C Block,Toe wall, Reconstruction of Sluice gate (Flap Shutter) along with other allied worksat ch 0.00 km to 0.80 km.(Group No-I)
GSB, metalling, carpeting, seal coat, protection wall, RCC box cell culvert and other allied works etc. Job No.TP/COM/27/ 2018-19
SH- Surface Drain ,Road side pucca Drains,Landslipe Clearance, Protection wall, WBM-3, PMC,Sand seal coat etc. Group II 2nd call.
S.H.-Formation, Cross Drain, Protection wall, GSB, WBM - 3, Carpeting and Sand Seal Coat etc. ( L - 0.90 Km. ) (Based on SoR-2020).
Development of Integrated Check Post at Sabroom Tripura external development works for road works parking zone footpath and retaining wall Tripura on EPC Mode Design and Build Basis
CONSTRUCTION WORK
Works
170/BLG-MC/eDNIT/2021-22
Construction of a Retainning wall and earth filling in lungga Land at the Road from Salbagan Bamutia to Tarak Sarkar para under Bamutia RD Block under BADP.
SH Building portion including internal water supply sanitary installation sewage and drainage works
Const
SH Construction of 4 Four Nos. CD 1m x 1m in between Ch 8.50km to Ch 10.00km Toe wall at Ch 6.55km Pucca Drain and unlined surface drain in between Ch 8.50 Km to 10.57 Km etc Gr II
Raising and widening of embankment by earth filling, Double layer soling,C. C Block,Toe wall, RCC Drain, Reconstruction of Sluice gate (Flap Shutter) along with other allied works at ch 0.80 km to 1.60 km(Group No-II)
Works
Construction of Protection wall at Dakshin Bagma panchayat ward No.5 , Shakuntala palli, Bagabassa Nalchar road and allied works during the year 2025-2026
Desilation of pond Construction of Protection wall and inside pond earth filling including Turfing making of Footpath Plantation, illumination etc. including all allied works.
Widening of road adjacent to proposed Oxygen building and construction of one retaining wall alongwith extension of existing cross drain at District Hospital complex , Tepania during the year 2021-2022
138/BLG-MC/eDNIT/2021-22
144/BLG-MC/e-DNIT/2021-22
CONSTRUCTION WORK
Development and construction R Wall-road work under AMC Ward No.33, 8 Bardowali AC.
RCC work, Brickwork, steel work etc.
SH-Construction of RCC cut of wall, protection wall, RCC apron etc at upstream and down stream of box cell culvert at Ch 0.45 Km
Bituminous grouting, Metaling, Carpeting, Seal coating, Constn. of Protection wall, CC drain, Maintenance of drain, Culvert, Hume pipe, railing etc. Link No- TR-03-20
SH - Soling, WBM, Carpeting, RCC Drain, Protection Wall etc. (L 770.00 M) under Scheme for Special Assistance to States for Capital Investment for 2024-25
GSB WBM II and III PMC Seal coat side shouldering road side drain Retaining wall etc. Length 2.625Km under Scheme for Special Assistance to States for Capital Investment for 2024 25
GSB WBM II and III PMC Seal coat side shouldering road side drain Retaining wall etc. Length 3.24Km under Scheme for Special Assistance to States for Capital Investment for 2024 25
SH-Construction of Gabian structure, RCC retaining wall for protection of road side erosion at different chainage under PWD(R and B) Rupaichari Sub-Division during the year 2024-25. (Gr-I).
SH-Construction of Gabian structure, RCC retaining wall for protection of road side erosion at different chainage under PWD(R and B) Rupaichari Sub-Division during the year 2024-25. (Gr-II)
Extra Ordinary Repair of Indo Bangladesh Border Road in the State of Tripura IBBR- 92, 92 (A), 92 (B) & 93 at various locations identified of total Length 20.77 Kms between BP 1842/3RI to 1885/MP of 20 BN BSF (HQ Panisagar), Dharmanagar, Tripura ... Foundations, Retaining Walls , ...
Patch Grouting, Patch Metalling, Re-carpeting, sand seal coat, construction of drain, protection wall, etc. during the year 2025-26 (Job.No. TP/COM/ 106/ 2025-26).
SH-WBM-3, Grouting,Re-Carpeting , seal coat , protection wall,CD,road side drain and providing CC block appron etc from chainage 0.00Km to 3.194 Km .
CONSTRUCTION WORK
SH- Soling, Metalling, Carpeting, protection wall and road side Pucca Drain etc ( Total Length - 4.824 Km) under RIDF(XXV) Scheme , Job No. TP/COM/09/2019-20
SH Construction of RCC Retaining wall at Kaskaupara Innovative Water supply Scheme(HRF SSF CWR Portion) and Halampara Innovative Scheme (CWR Portion) within The jurisdiction of Damcherra R.D Block under DWS Sub-Division Damcherra