Loading…
Loading…
3,829 live2,617 closing this weekmost from Madhya Pradesh Rural Road Development Authority and PWD
3,829 results • Best match
SH-Formation cutting jeep able standard to 5/7 Mtrs wide road and Retaining structure from Km 0/0 to 2/210)Under Deposit
LAC-ADS-LAC ADS 2025-26 Peravoor LAC Sri. Sunny Joseph MLA-Theyyambadi Mundayamparamba Colony Road Construction work in Aralam GP at Peravoor LAC (13)- General Civil Work (Re-tender)
ASPHALTING OF ROAD WORK FROM H.NO.165-171 AND FROM H.NO.319-KIDS PARADISE SCHOOL DURGESH VIHAR, NEAR SIDDESHWAR MAHADEV MANDIR PARK AND FROM H.NO.146-131 NEERJA NAGAR W-66 Z-15.
Laying of CC road from near arsha school to h.no:5-9-278/92/A and Other Internal Roads at Rock Garden, Yapral ward no-189 in Keesara Circle 1, Malkajgiri Zone, MMC (Reseverd for ST only)(Item no.3)
Providing Intercepting & Diverting (I&D) Works, 250 kVA Transformer, Approach Road and Site Levelling at 5.90 MLD STP at Hosanna Mandir Road of Piduguralla Municipality under SBM (U) 2.0 Grant
Providing Intercepting & Diverting (I&D) Works, 250 kVA Transformer, Approach Road and Site Levelling at 5.20 MLD STP near SC Burial Ground of Piduguralla Municipality under SBM (U) 2.0 Grant.
Maintenance Repair to the approach road of bridge at Ch.770.00 of LBMC at Village- Rondia, GP-Chaktentul ,Block-Galsi-I, P.S- Budbud, Dist.- Purba Bardhaman under Damodar Headworks Division
Construction of G plus 2 Administrativem B plus G plus 4 Storey Academic and G pus 7 Storey Girls Hostel building Internal Water Supply Sanitary INstallation Internal Electric Installation Specialized E and M works and Electrical Sub-Station etc ... work Internal Road and ...
Construction of Various Works under 6th ASFC under Guwahati Municipal Corporation
IMPROVEMENT OF ROAD BY LAYING HOT- MIX AT BYE LANE OF JAGAT ROY CHOWDHURY ROAD NEAR PRE NO-1/4 IN WARD NO-126
Construction of a C.C. road from the highway to Dayalpur in Gram Panchayat Tikariya, Deva Development Block, Barabanki district, under the Integrated Development Scheme.
Construction of a CC road up to Gram Panchayat Narauli in Harkh Development Block, Barabanki district, under the Integrated Development Plan.
Road construction work (including drains and CC surfacing) in Ward 53, Shastri Nagar Sector 3, Vidya Nagar, spanning the stretch from Sanjeev Sehgals house to Fateh Chands house.
Drain repair and CC road construction work in Ward 17, Village Raishana spanning the stretch from Arvind shop to Chamand Mata and including the lane near Rakesh house.
Drain repair and CC road construction work in Ward-17 (Abdullapur Handiya locality) specifically in Yunus Wali Gali and the lanes of Haji Babu, Veer Singh, and Khalil.
In Ward-40 Sahibabad village, from Kiran Pal Singh to Ganeshilal house, from Jitendra to Roshan and in Soni ji street, drain repair and CC road construction work.
Balance work for Construction of Road at Chatroon Pyt. Gadyog by way of earth work in cutting/filling, Construction of R/B/Crated Wall, Providing and Laying of GSB, Providing and Laying 02 No Hume Pipe Culvert
Balance work of construction of road from Lahla Co-operative Society to Shamshanghat Assanpatt (SW- C/o 2.00 Mtrs Span RCC Slab Culvert at RD 0/110 and Grating over Kuhal crossing at RD 0/060 (MMGSY)
In Ward-43 Kadkad Model Village, from Sube Singh Raghav to Anil Raghav and from Chandan to Gopi Raghav, from Nanak Rana to Durga Rana via Jasse Mahipal, repair of drain and construction of road by CC.
MAINT OF C C ROAD AT E M BYPASS LINK ROAD ITS SURROUNDING AREA IN WARD NO 110 BR XI
Moulik Nidhi Construction of C.C. Road Work At Hari Shankar puram in D-10 to D-104 and Kushwah House to sahib singh. ward No. 58. Zone No. 13. File No. 432/26x3/6.
Please refer to BOQ
B.T. Patch Repair Works on (1) Tongpal-Leda-Pushpal Road Km 1 To 15 = 15.00 Km. (2) Southnaar Approach Road Length 6.60 km (3) Chhindgarh Twon Approach Road 0.70 km (4) Sukma-Jhapra-Malkangiri Road Km 1 To 12 = 12.00 Km., (5) Pushamipara – Kumharras Road Length 4.80 Km, (6) Sukma- Pawaras Road 3.70 km, And Various Road 13.30 Km = Total Length 56.10 Km. Under PWD Sub Division Sukma , Division-Sukma.
Refer tender document
Sub Head- Providing and Laying Interlocking Paver Block and U-Shape Drain in Km. 0/000 to 0/250) Under Head PDNA-2025.
SH Providing and laying Interlocking paver block in damaged various stretches Total Length 250m other than AMP
SH Providing and laying resurfacing course in damaged various stretches total Length 500 metre other than AMP
SH Providing and laying resurfacing course in damaged stretches Total Length 300 metre other than AMP
C/O B/wall, 900mm dia /600mm dia RCC hume pipe culvert and V-shape Drain in km 0/00 to 1/050).
Annual Maintanace of Gokak Taluka border to SH-134 (Channapur) link road Via.Hulkund-Salahalli-Bannur-Bannur Tanda- Dadibavi Tanda-Batakurki-Nandihal SH-189 from km 5.33 to 17.10, 18.27 to 23.57, 23.83 to 24.37, 26.78 to 28.52,33.71 to 33.04, 33.55 to 37.15, 41.94 to 51.88, 52.22 to 58.28 and 61.82 to 62.82 in Ramdurg Taluka for the year 2026-27
RRD on various roads under Pragpur Sub Division (1) Chalali to Sukhar road Km. 0/0 to 2/150 (SH C/O R/wall at RD0/700 to 0/730 (2) Link road Shamshan Ghat to Ward No. 3 Chalali (SH C/o B/wall at RD 0/020 to 0/040 and R/wall at RD 0/045 to 0/065) PD
11 KV line, 11 KV DP Line, 11 KV X-Mer DP Line, LT Line Shifting & Electrification Work Under Ongoing Proposed Road widening work of Sandi To Keshla Road Dist.-Baloda-Bazar (C.G.)
Preparation of DPR for Construction of road from DAHA BRIDGE TO TAMAGHATA JUNIOR HIGH SCHOOL ASRAM within Purbasthali-II Block Block in the district of Purba Bardhaman towards inclusion of the UPCOMING Projects under RIDF-XXXII 2026-27
Authority Engineer for supervision of Construction of road from Lada Sarli section of Frontier Highway NH 913 koloriang to Sarli km 168.0 to 183.40 15.40 km and Sarli to Huri km 0.00 to 78.38 78.38km on EPC mode
Construction of road from Charchandramerh to Santipur via Ratnali Bus Stand to Tamluk College para within Sahid Matangini Panchayat Samity. ( 0.00 to 27.00 K.M.) under Sahid Matangini Block in the District of Purba Medinipur (Road Length 23.600 km)
Electrical work in connection with provision of Electronics interlocking under remodilling work at LJN yard, Proposal for extension of electric loco shed at Lucknow Jn. yard, CYM Building at coaching Depot ASH, Development of goods platform surface, ... and approach road at ...
A)PR - Miscellaneous annual maintenance work of quarters in lieu of zonal work under SSE(W)Parel for year 2026-27. B)Arresting leakages, exposed ceiling repair with polymer, painting & routine maintenance repair work in RB-I Bldg (25/120 No of Qtrs), ... of approach Road from ...
Comprehensive Operation, Maintenance and Repair of Civil & Electromechanical assets such as Sump, Pump house, Intake Channel, Approach Road, Security Cabin, Staff quarters, Compound Wall, Bulk transmission pipeline, Valves, Pumping machinery & electrical equipment etc. for the Maliya to Bhachau – NC-09 Project, execution of required civil and electro-mechanical scheme strengthening works, including proper supply of water as per demand and maintaining complete and accurate records of all operation and maintenance activities, for a total period of 60 months, Dist.: Kutch.
In Ward 79 Nyay Khand 01, construction of drain and road construction through interlocking tiles from plot no. 1041G to 380G and 392 to 405 and 125 to 96.
Geotechnical investigation and Road construction material investigation for Preparation of detailed design and feasibility studies report for Construction of Flyover underpass at various locations of Delhi under Flyover Zone
Repairing and Restoration of the damaged Existing road shoulder from Ch. 0.3 km to Ch.0.34 km of Mahespota Link Road.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - COLLEGE; REPAIR OF ROAD; Service Provider
Land Development, Approach Road, Boundary Wall, Improvement of Pump house for MAHIL Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. (3rd Call)
Providing Intercepting & Diverting (I&D) Works, 160 kVA Transformer, Approach Road And Site Levelling at 3 MLD STP at existing Compost Yard, Jammulapalem Road in Bapatla Municipality under SBM (U) 2.0 Grant