Loading…
Loading…
8,037 results • Best match
Package No.AP GNT-MRR/2017-035 Routine maintenance to 18 no. of road works to provide pot hole free roads in Ipur Mandal Package Estimate Cost :Rs.95.59 Lakhs
Package No.AP GNT-MRR/2017-034 . Routine maintenance to 17 no. of road works to provide pot hole free roads in Bollpalli Mandal Package Estimate Cost : Rs.137.38 Lakhs
Package No.AP GNT-MRR/2017-038 - Routine maintenance to 4 no. of road works to provide pot hole free roads in Piduguralla Mandal, Package Estimate Cost Rs.161.80 lakhs
Package No-2 Six (06) Road Work in Nandikotkur Constituency (Pamulapadu Mandal) of Kurnool District, Estimate Cost Rs.168.00 Lakhs
Urgent Repairs to road work (Intensive Patch work ) in km.7/0 to 13/8 of Ulchala - Remata - Kothakota road
Urgent Repairs to road work (Intensive Patch work ) in km.1 8/0 to 22/0 of Kurnool -Sunkesula road
Urgent Repairs to road work (Intensive Patch work ) in km.1 8/0 to 22/0 of Kurnool -Sunkesula road
Urgent Repairs to road work (Intensive Patch work ) in km.7/0 to 13/8 of Ulchala - Remata - Kothakota road
Package No-2 Six (06) Road Work in Nandikotkur Constituency (Pamulapadu Mandal) of Kurnool District, Estimate Cost Rs.168.00 Lakhs
Package No 4 Consisting of 3 Road work in Hukumpeta Mandal of Alluri Seetharamaraju District Est. Cost Rs.252.40 Lakhs
Item No.2 Estimate for formation of B.T Road in damaged BT Road road at link road of sagar matha church main road and main canal road from Km:0.235 to Km: 0.455 in Vijayapuri south colony, Nagarjunasagar Dam.
Item No.4 Estimate for formation of B.T Road in damaged BT Road road at link road of sagar matha church main road and main canal road from Km:0.800 to Km: 1.020 in Vijayapuri south colony, Nagarjunasagar Dam.
Item No.5 Estimate for formation of B.T Road in damaged BT Road road at link road of sagar matha church main road and main canal road from Km:1.100 to Km: 1.320 in Vijayapuri south colony, Nagarjunasagar Dam.
4th call - Shifting Poles of existing 33KV, 11KV, LT lines, M+6 Towers and DTRS at 1) Samalkota - Gokavaram road from Km 0/0 to 8/8. 2) Peddapuram - Burugupudi road from Km 0/0 to 1/0 due to extension of road widening works from Anjaneya swami temple to ADB road in East Godavari District.
3Rd calls - Shifting of Pole of existing 33KV, 11KV, LT LInes , M+6 Towers and DTRS at 1) Samalkota-Gokavaram road from Km 0/0 to 8/8. 2) Peddapuram - Burugupudi road to from Km 0/0 to 1/0 due to extension of road widening works from Prasanna Anjaneya swami temple to ADB road in East Godavari.
Shifting of 33KV/11 KV/LT lines and Dist. Transformers along the road from Hanuman Circle to Gajulapeta in Vempalli Town for purpose of Road Widening in Vempalli Town under Turnkey basis Wihich taken up by R&B Department under DC works in operation section, Vempalli Town vide WBS No.:D-2023-06-05-21-01-007
Laying of CC Road from D.No. 7/396 to 7/401, 7/413 to 7/404-36 and 3 Internal Roads, CC road and CC Drain from Raqueebshavalli Darga Backside to 7/404-23 and CC Drain from D.No. 7/89-1 to 7/92 and Culvert at 7/92, CC road from Chilakala bavi Center to 7/119-6-3 in 39th Division of Kadapa Municipal Corporation
Laying of CC Road from D.No. 7/396 to 7/401, 7/413 to 7/404-36 and 3 Internal Roads, CC road and CC Drain from Raqueebshavalli Darga Backside to 7/404-23 and CC Drain from D.No. 7/89-1 to 7/92 and Culvert at 7/92, CC road from Chilakala bavi Center to 7/119-6-3 in 39th Division of Kadapa Municipal Corporation
Laying of CC Road from D.No. 7/396 to 7/401, 7/413 to 7/404-36 and 3 Internal Roads, CC road and CC Drain from Raqueebshavalli Darga Backside to 7/404-23 and CC Drain from D.No. 7/89-1 to 7/92 and Culvert at 7/92, CC road from Chilakala bavi Center to 7/119-6-3 in 39th Division of Kadapa Municipal Corporation
Laying of CC Road from D.No. 7/396 to 7/401, 7/413 to 7/404-36 and 3 Internal Roads, CC road and CC Drain from Raqueebshavalli Darga Backside to 7/404-23 and CC Drain from D.No. 7/89-1 to 7/92 and Culvert at 7/92, CC road from Chilakala bavi Center to 7/119-6-3 in 39th Division of Kadapa Municipal Corporation
Laying of CC Road from D.No. 7/396 to 7/401, 7/413 to 7/404-36 and 3 Internal Roads, CC road and CC Drain from Raqueebshavalli Darga Backside to 7/404-23 and CC Drain from D.No. 7/89-1 to 7/92 and Culvert at 7/92, CC road from Chilakala bavi Center to 7/119-6-3 in 39th Division of Kadapa Municipal Corporation
Construction of Andhra Pradesh Judicial Academy with Pile Foundation, Super Structure with RC Columns-Beams Framed Structure, Architectural Finishes, Internal Electrical and Plumbing works, HAVC works and IT works including External Electrical, ... Facilities, Internal Roads , ...
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Sewerage Network, Court Yard Filling, Trunk Mains etc., in the approved EWS layouts at of GVMC (Suddagedda,Burma Colony,Duvvada,Bhanojithota,Peddagantyada,Kondakoppaka,Sirasapalli,Padmanabha nagar,Kommadhi-2),Yelamanchili ULBs in Visakhapatnam District under AHP PMAY HFA (U) Project on Lump sum contract (Percentage Tender) (with Defect Liability Period of 2 years) cum Reverse Tendering.
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Sewerage Network, Court yard filling, Trunk Mains etc., in the approved layouts at Srikalahasthi Ph-1 (Rajeev Nagar) Srikalahasthi Ph-II (Near S.W. Hostel), Chittoor Ph-II (Murakambattu), Puttur Ph-II (Nandi Mangalam), Punagnur Ph-II (Ethur), Madanapalli Ph-II (Venkappakota) ULBs of Chittoor District under AHP-PMAY-HFA(U) with 2 years defects liability period
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Sewerage Network, Court Yard Filling etc., in approved EWS Layouts in CRDA areas of Ananthavaram, Dondapadu, Inavolu, Mandadam, Nidamarru, Nowluru, Penumaka, Thulluru, and Municipalities of Mangalagiri, Narasaraopeta in Guntur District and Kandukuru in Prakasam District under AHP-PMAY- (HFA) (U) Project on Lump sum contract ( Percentage Tender) (with Defect Liability Period of 2 Years) cum reverse tendering.
Laying of CC Road from D.No. 7/396 to 7/401, 7/413 to 7/404-36 and 3 Internal Roads, CC road and CC Drain from Raqueebshavalli Darga Backside to 7/404-23 and CC Drain from D.No. 7/89-1 to 7/92 and Culvert at 7/92, CC road from Chilakala bavi Center to 7/119-6-3 in 39th Division of Kadapa Municipal Corporation
Construction of New Office Building G plus 1 storeyed including internal water supply, sanitary installations, drainage, IEI and Fans, split AC system, fire fighting with down comer system, manual fire alarm system, UPS system, LAN networking system, ... sump, internal roads , ...
Laying of CC Road from D.No. 7/396 to 7/401, 7/413 to 7/404-36 and 3 Internal Roads, CC road and CC Drain from Raqueebshavalli Darga Backside to 7/404-23 and CC Drain from D.No. 7/89-1 to 7/92 and Culvert at 7/92, CC road from Chilakala bavi Center to 7/119-6-3 in 39th Division of Kadapa Municipal Corporation
Construction of Concrete Storm Water Drains in place of collapsed Drain including construction of New Drains for facilitating free passage of Rain Water from 220/132KV Yards, Providing Sump with necessary pumping system, Providing Ramp for approach Road,...
Providing Infrastructure & Civil amenities under R&R scheme of Polavaram Project for Kottamamidigondi village site at Kamayyapalem (V) of Jeelugumilli (M) of West Godavari District. Sub work: Construction of burial ground cremation, site levelling, ... and approach road to ...
Providing Infrastructure & Civil Amenities Under R&R Scheme of Polavaram Project for Tekuru Village site at P.Narayanapuram(V) of Jeelugumilli (M) of West Godavari District. Sub-work:- Construction of Burial ground cremation, Site Leveling, Compound ... and approach road to ...
Providing basic infrastructure works of jungle clearance, site levelling, ETS survey for the total area of land pooling sites and peg marking, formation of earthen roads of one cent plots layout & approach road for the lay out development for the land parcels in Aganampudi ( V ), Gajuwakha and Pedagantyada ( M), Visakhapatnam (Balance works) (2nd call)
Providing Infrastructure & Civil Amenities Under R&R Scheme of Polavaram Project for Tallavaram Village site at Puchikapadu(V) of Jeelugumilli (M) of West Godavari District. Sub-work:- Construction of Burial ground cremation, Site Leveling, Compound ... and approach road to ...
Construction of Concrete Storm Water Drains in place of collapsed Drain including construction of New Drains for facilitating free passage of Rain Water from 220/132KV Yards, Providing Sump with necessary pumping system, Providing Ramp for approach Road,...
Package No.2 (3 works) - 1) R/F MV Road to Potlapadu (via) Gandigunta Harijanawada, Est.Rs. 270.00 lakhs 2) Kunderu harijanawada approach road to Main road of Kankipadu(M), Rs. 35.00 lakhs 3) R&B Road to mbedkar Nagar of Katuru (V) of Vuyyuru (M)Rs.40.00 lakhs in Penamaluru Constituency, Total Est.Rs. 345.00 lakhs
Providing Infrastructure & Civil Amenities Under R&R Scheme of Polavaram Project for Tallavaram Village site at Puchikapadu(V) of Jeelugumilli (M) of West Godavari District. Sub-work:- Construction of Burial ground cremation, Site Leveling, Compound ... and approach road to ...
Construction of village Community centre (Racha banda) and providing Amenities to Burrial Grounds (Gravel to approach road and Rituals shed) at 1. C. Ramapuram, 2. Gangireddypalle, 3. P.V.Puram, 4. Nennuru, 5. Ganeswarapuram,6. Pathakandulavaripalli, 7. Nadavaluru, 8. Kammakandriga, 9. KKV Puram, 10 Venkataramapuram, 11. Ravillavaripalle, 12. Sorakayalapalem, 13. Kammapalle Gramapanchayath G.P.s of Ramachandrapuram Mandal
Providing Infrastructure & Civil Amenities Under R&R Scheme of Polavaram Project for Cheeduru Village site at P.Narayanapuram(V) of Jeelugumilli (M) of West Godavari District. Sub-work:- Construction of Burial ground cremation, Site Leveling, ... and approach road to ...
Providing Approach Road from Sivalayam to Godavari River in Bodasakurru (V) of Allavaram (M) Est.Rs.13.00 Lakhs
Laying of gravel road and cross drainage works on Approach Road to R and R Colony, Dharmavaram.
AS PER BOQ AND TENDER DOCUMENTS
Black topping of internal BT roads of Phase-II and balance internal roads in Phase-I excluding main Raod in Deepanjali Nagar Township atNTPC Simhadri
Providing Standard Lane Marking, Cautionary Boards, Name Boards, Moulded Shanks in Main roads, Street roads ,Internal Roads of 1 to 35 wards in Srikalahasti Municipality
Construction of Toilets, Water Supply,Electrical and Internal Roads works in OC & BC Burial Grounds at Junamchunduru in Div no.26 Under AE-15 Section
Construction of road from Chitla Chalapati rao house to Pulleti Kurti Rama Krishna house in shivapuram in ward no.26 of Narsipatnam Municipality
Construction of Road from Sontyam VZM R&B Road to Padmanabhaswamy temple hill top in Padmanabham (M) of Visakhapatnam District,Est.Cost.Rs.500.00 lakhs
Giddalur Nagar Panchayat - SFC Grant - Construction of Road and Drain near Brahmaiah House to Ganji Raghuvulu at Koppuvari Street in Ward No.5
CONSTRUCTION OF ROAD FROM ANKIREDDYPALLI TO SRI BAIRAVA SWAMY TEMPLE IN PTM MANDAL OF THAMBALLAPALLI CONSTITUENCY IN ANNAMAYYA DISTRICT.ESTIMATE COST .RS:126.00 LAKHS
CONSTRUCTION OF ROAD FROM NALAMILLI R&B ROAD TO NADIPUDI FOOT PATH BRIDGE IN AMALAPURAM MANDAL, EST.RS.130.00 LAKHS IN DR.B.R.AMBEDKAR KONASEEMA DISTRICT
CONSTRUCTION OF ROAD FROM KUNAVARAM BRIDGE TO UPPALAGUPTAM R&B ROAD VIA PERAICHERUVU IN UPPALAGUPTAM MANDAL, EST.RS.90.00 LAKHS IN DR.B.R.AMBEDKAR KONASEEMA DISTRICT