Loading…
Loading…
677 results • Best match
WARD NO. 20 SANTI SCHOOL TO SHUKLA HOUSE CC ROAD CONSTRUCTION WORK
Road Construction Work at Ward 04,05,06,11,13,14 and 15 (Group 01) (1st Call)
Bitumen Road work at Power House Road Fatak to Old Bus Stand (Under Bridge Raod) at Korba
Construction Of C.C. Road Work Of 20200 Mt Godown Premises At- Khokra (Janjgir) Distt-Janjgir-Champa (C.G.)
Construction Of C.C. Road Work Of 10800 MT Godown Premises At- Ucchibhatti (Champa) Distt-Janjgir-Champa (C.G.)
Shifting of LT line Conductor, LT line Cable, 11KV line, 33KV line, 11KV line DP, 33KV line DP, 11KV line TP, 33KV line TP, 11KV line FP, 63KVA X-mer DP, 25 KVA X-mer DP for road widening from Bemetara _ Nawagarh_ Mungeli Road (S.H. - 07, 43KM, Bemetara to Atargawan road 34KM) Dist-Bemetara (C.G.)
Rate Contract for Excavation, loading of Pond Ash from Ash Dyke NTPCSingrauli, transporting and unloading at construction site of roadprojects of NHAI and other Central or State Government road constructiondepartment / Authority / PMGSY Road Project
Signalling and Telecom work for (1) closure of manned level crossing no. AR-12 in connection with Construction of Road Over Bridge cum RUB at Rajim Station and (2) closure of manned level crossing no. RD-22 in connection with Construction of RUB at Kendri Station with the modification of existing EI at Rajim and Kendri station of Raipur Division in S.E.C.Railway.
WARD NO. 08 MAIN ROAD TO SUMAN KERKETTA HOUSE CC ROAD CONSTRUCTION WORK
WARD NO. 10 AJEET HOUSE TO BANJARA HOUSE & SANJAY HOUSE BT ROAD CONSTRUCTION WORK
Rate contract for Transportation of pond ash from NTPC Unchahar toNHAI/Govt Road Construction Authorities
samudayik bhawan to aadarsh footwear CC Road Construction work in ward-02, N P Kirodimalnagar
WARD NO.17 U.D. MINJ HOUSE TO CHOTU GUPTA HOUSE & LOLAS HOUSE BT ROAD CONSTRUCTION WORK
Construction of 1no 500mt godown work in main mandi yard pakhanjore, 1no 500mt godown work in sub mandi yard antagarh and cement concrete road work from main road to 1000mt godown and cement concrete road work from staff quarter to (200mt godown to 1000mt godown ) to office building at main mandi yard pakhanjore distt-uttar bastar kanker.
construction of covered platform, borewell work, urinal block for male and female and cement concrete road work in village vehrakhar and kaliva in block-kunkuri distt-jaspur
Construction of cement concrete road work from national highway to railway crossing, national highway to village mohbhatta and salka road to shiv mandir in village mohbhatta block-bilha distt-bilaspur
WARD NO. IN 11, BT ROAD CONSTRUCTION WORK FROM SADARAM SAHU HOUSE TO TOMESH JOSHI HOUSE AND FROM GHANSHYAM YADAV HOUSE TO TANVEER HOUSE.
WARD NO. IN 11, BT ROAD CONSTRUCTION WORK FROM SADARAM SAHU HOUSE TO TOMESH JOSHI HOUSE AND FROM GHANSHYAM YADAV HOUSE TO TANVEER HOUSE.
CONSTRUCTION OF NEW OFFICE BUILDING WORK INCLUDING LEVELLING WORK AND CONCRETE PAVER BLOCK AROUND NEW OFFICE BUILDING WORK, 2NO MIG QUARTER , NEW BOUNDARY WALL AND REPAIRING WORK OF BOUNDARY WALL , DRAIN WORK AND APPROACH ROAD (C.C) IN FRONT OF 1800 M.T GODOWN AND STREET LIGHT WORK AT MANDI YARD SAKTI, CONSTRUCTION OF 1800 M.T GODOWN AND C.C ROAD AT UPMANDI PERMISES BARADWAR, CONSTRUCTION OF BOUNDARY WALL AT PADDY PURCHASING CENTER SODHI-TEMAR IN MANDI SAMITI AREA- SAKTI, DISTT- SAKTI
Construction of Wharfwall-2 coal loading system along with construction of Railway formation, Minor bridges, drains, retaining wall, Platform, supply of Rails, P. way materials an Track linking work and Road work for NTPC Railway siding atTalaipalli
Maharana Pratap Ward No. 47, from Barsur Line Road to Water Tank, CC Road construction site from Madia Para to Hanuman Temple to Sakuntala Verma House and Rahul Gupta Gali (SOR 01.01.15)
Augmentation of existing amenities to facilitate Re-Development work at passenger interface area of Raipur station. (This work Primarily involves Through repair of road surface and pot holes, construction of two Nos Circle Chowk, replacement of rusted and corroded hydrant pipeline and other water pipeline, provision of Soft barricating in roads and Retroreflective boards, replacement of corroded valley Gutter and roof sheet at platform shelter, repairs to chequer tiles, Kota Stone and Granite flooring at station platform, repairs to paver blocks and development of Parking near Jindal Garden, development of garden near VIP Gate and other location, construction of AC Waiting Hall at PF No.7, shifting of water booth, booking counter and urinal at Platform No.1A, repair of Sewer and Rain water drain in circulating area, extension and maintenance of misting system at platform no.1,2,3,5 & 6 and provision of new misting system at platform no.7 of Raipur station.)
Construction of Cement Concrete Road beside canal ( both side) from main road to Sun city, Leveliing and Cement Concrete Work at parking infront of M.P Theater And road extention work, Road widening work with help of paver block near boundary wall from ring road to parking at J.D colony Bypass Road In Nagar Palika Area kurud ,Block - Kurud. Construction of Shed near minimata chowk Gram - Khapri at Gram Panchayat- Kurra,Near lake side in Maroud,Near lake side in Gadadih,Near Ramleela chowk in Ganeshpur, Inside Sheetla Mandir permises in Chorbhatti, Near chowk in Aalekhutta, Infront of Rang Manch in Maurikala,Infront of Chandi Mandir in Singhdehi At Block -Kurud, Distt- Dhamtari.
Design, Drawing, Construction, Testing, Commissioning of Intake well 6m dia height 19.0m,525m length approach bridge, approach road, Raw Water Electric Sub station100 KVA/11/0.415 KV with all required Work,Raw water V.T. pumps and motors 3no -48939LPH discharge and 65.0m head at near village ghutra , 2.0 MLD conventional Type Water Treatment Plant, Clear water centrifugal pumps and motors 40000LPH and 52m head -3no,6982LPH discharge 170m head -3no ,Clear Water Electric Sub station100 KVA/11/0.415 KV with all required Work at village ghutra,180 KL capacity 30m staging MBR-1 at village kachhod,35 KL capacity 21 staging MBR-02 at village charcha, Providing, laying, jointing and testing & commissioning of Raw Water Pumping Main DI K-9 200 mm Dia Length 2714 m And Clear water pumping main 200 mm Dia DI K-9 Length 650 m,100mm dia length 12702 m total 13352 m&Clear Water Gravity Mains pipe O-pvc Pipe PN-16 250 mm dia – 1887 m., & O-pvc Pipe PN-16 160mm dia – 14173m., 110mm dia – 69741m. Total Length- 85801 m with all required valves & specials as per attached key plan map , Providing and fixing Bulk flow meters including intregration of all components testing and trial run comprises of 3 months testing and 9 month of trial run (with defect liability period of one year) Balance Work under GHUTARA Multi Village Water Supply Scheme of Block MANENDRAGARH, District M.C.B. (C.G.) (On Risk and cost Basis).
Design, Drawing, Construction, Testing, Commissioning of Intake well 6m dia height 22Mtr,30m length approach bridge&approach road, Electric Sub station315 KVA/11/0.415 KV with all required Work,Raw water V.T. pumps and motors 02 Nos each of 25HP which can discharge2938LPM against 25m head at village chirmi near existing anicut , 4.0 MLD conventional Type Water Treatment Plant, Clear water centrifugal pumps and motors 3 Nos of each of 75 HP which can discharge1227 LPMagainst 190 m head and 02 Noscentrifugal pumps and motors each of20HPwhich can discharge 372 LPM against 145 MtrHead.,Along with the construction of 3 no of MBR,MBR-01 at village Kanharbehra-100 KL capacity 25 M staging ,MBR -02 at village Bachra250 KL capacity 25M staging,MBR -03 at village Kandoura50 KL capacity20M staging. Providing, laying, jointing , testing & commissioning of Raw Water Pumping Main (DI K-9)300 mm DiaLength200 m And Clear water pumping main 150 mm Dia(DI K-9) Length 21500 m & 200 mm Dia(DI K-9) length 6000 m, 250 mm dia(K-9)length 5500 mtr Total Length 33000 m &Clear Water Gravity Mains pipe O-PVC110mm dia – 62699m., O-PVC 160mm dia – 25812m., O-PVC250mm dia – 10999m, 300 DI (K-7) mm dia =2563 m Total Length- 102073m with all required valves & specials as per attached key plan map, Providing and fixing Bulk flow meters,nala crossing and work include taking permission to concern deptt. Allied All civil works including Boundary wall around WTP campus completion period 12 months includingrainy Season Integrationof all component,testing&trial run comprises of 03 month testing & 09 month trial run of entire scheme (with defect liability period of one year). (On Risk and cost basis) TAMDAND-MULTI -VILLAGE -SCHEME BLOCK-KHADGAWAN, DISTRICT –KOREA,
Design, Drawing, Construction, Testing, Commissioning of Intake well 6m dia height 19.0m and 25m length approach bridge, approach road, Raw Water Electric Sub station100 KVA/11/0.415 KV with all required Work,Raw water V.T. pumps and motors 3no of 35BHP having -70638LPH discharge and 93.0m head at village kewarabahara , 2.5 MLD conventional Type Water Treatment Plant, Clear water centrifugal pumps and motors 02 no of 15 BHP having 27500LPH and 81m head. 54063LPH discharge 148m head -3no of 50BHP,Clear Water Electric Sub station160 KVA/11/0.415 KV with all required Work at village pushla, 65 KL capacity 21 staging MBR-1 no at village pushla,100 KL capacity 25 staging MBR-1 no at village sonhat,150 KL capacity 30 staging MBR-1 no at village anandpur, Providing, laying, jointing and testing & commissioning of Raw Water Pumping Main DI K-9 pipe 250 mm Dia - 9150 m And Clear water pumping main 150 mm Dia DI K-9 Length- 17936 m,200mm dia length -9951m total -27887m& Clear Water Gravity Mains O-pvc Pipe PN-16- 250mm dia – 383m , 160mm dia – 20906m., 110mm dia – 50563m. Total Length- 71852 m with all required valves &specials,as per attached key plan map, Providing and fixing Bulk flow meters for Entire Scheme upto inlet of following Village OHTs, nala crossing and work include taking permission to PWD,WRD deptt.etc. Allied all civil works including Boundary wall around WTP campus completion period 12 months including rainy season Integration of all components comprises of 03 month testing and 09 month trial run of entire scheme (with defect liability period of one year). (On Risk and cost basis).KATGHODI GROUP WATER SUPPLY SCHEME BLOCK- SONHAT DISTRICT –KOREA
Design, Drawing, Construction, Testing, Commissioning of Intake well 6m dia 22m height approach bridge 45m length, approach road, Electric Sub station 250 KVA/11/.415 KV with all required Work,Raw water V.T. pumps and motors 03 no each of 15HP which can discharge 88076 LPH against Totalhead of29 m at near village Katkona, 3.0 MLD conventional Type Water Treatment Plant, 02-Nos of Clear water centrifugal pumps and motors each of 12.5 H.P. which can discharge ,25963 LPH against head of 65m head and 3 nos of centrifugal pump of 95 H.P. which can discharge 71572 LPH against 223m head ,along with the construction of 3 no of MBR,MBR-1 at village near Salka 110 KL capacity 30 M staging MBR-2, 60 KL capacity 30 M staging at village Katkona, MBR-3 215 KL capacity 30 M staging at village Koda, Providing, laying, jointing and testing & commissioning of Raw Water Pumping Main DI K-9 250 mm Dia Length 250 m And Clear water pumping main 150 mm Dia DI K-9 Length 2810 m,200mm dia length 19109m,250 mm dia 4905m total 26824 m&Clear Water Gravity Mains pipe O-PVC PN-25 250mm dia – 6343m, ,250mm diaO-PVC PN-16 -2063 mtr,160 mm diaO-PVCPN-16– 31051m,110 mm diaO-PVC PN -16-47136 m . Total Length- 86593 m with all required valves & specials as per attached key plan map, Providing and fixing Bulk flow meters, ,nala crossing and work include taking permission to department. LikePWD, WRD etc. Allied All civil works including Boundary wall around WTP campus. work completion is 12monthsincluding rainy season Integrationof all component,testing& trial run comprises of 03 month testing & 09 Month trial run (with defect liability period of one year),Balance Work under BARDAR- Multi-Village Water Supply Scheme of Block KHADGAWAN, District M.C.B (C.G.) (On Risk and cost Basis).