Loading…
Loading…
10,877 results • Best match
Maintenance and Repair of Road/Path by providing cement concrete tiles, Retaining walls, Parapets walls, Railings, chain link fencing etc.
Job 2 Restoration and Repair of road of Sheetla Mata Mandir at Village Ispur Tehsil Haoli Distt. Una Deposit Work
Maintenance and Repair of Road/Path by providing cement concrete tiles, Retaining walls, Parapets walls, Railings, chain link fencing etc.
Maintenance and Repair of Road/Path by providing cement concrete tiles, Retaining walls, Parapets walls, Railings, chain link fencing etc.
including thermoplastic paint egde line Vshape drain at essential RDs under PMGSY for the year 2022 23
Restoration of rain damage link road to village Taksal in km 0/0 to 2/100 SH Repair of pot holes and P/L interlocking tile pavement from at Rd 1/250 to 1/675 under OFC
C/O link road from Rakhog to Village Paprol in Km 0/00 to 4/540 (SH C/O road from Jeepable standard to 5/7 mtr. Wide in Km. 0/225 to 2/510)Under SCDP
M/T of link road from Darwa to Marheta in Km. 0/00 to 2/400.(SH P/L G III, 20mm thick open graded premix carpet barrier in Km. 0/00 to 2/400)Under MNP
BSP 2023 970 R o repair and Maintenance Link road Shodha Bai to Village Shodha road Km 0 000 to 3 000 SH C o 900mm dia RCC Hume pipe culvert at Rd 1 030 with 3 point 85mtr long wing walls BSP 2023 969 R o repair and Maintenance link road Chimti to
Job 3 Microsurfacing on i link road Gondpur Baliwal Road to Bathu Singan km. 5-0 to 8-580 ii link road from Lalhri to Dhilwan km. 0-0 to 0-500 iii Gondpur Turf Jai Chand Road to Gondpur Turf Bulla Road km. 0-0 to 0-900 iv Umrali Dhilwan Road km. 0-
Job 2 Annual surfacing on link road Una Jaijon road to village Roura km.0-0 to 1-455 and 1-836 to 2-136 VR 0133 and link road Gondpur Baliwal road to Bathu Singan km.4-0 to 5-0 VR 036 and Sub Head P.L Patch work,30mm bitumen concrete Under
Job 2 Periodical maintenance on link road Una Ghandawal road to Badoli road km.5-00 to 6-500 Sub Head Patch work , 30 mm thick BC and zebra crossing VR044 ii Link road Una Gandawal road to Panoh road km. 0-00 to 0-250 and 0-400 to 1-00 Sub Head Pat
Construction of link road from Dev Ka More to Harijan Basti Bobri Khodri Km 0/0 to 6/0 in District Sirmour HP ( SH- Formation Cutting 5/7 Mtrs wide road , Cross- Drainage and P/L Soling in Km 0/0 to 6/0)( SW-Providing Cross-Drainage at various RDs
C O Link Road Chhamakari to Sua via Harijan Basti Khali Km 0 00 to 3 700 SH P L WBM Grading I and G II in Km 0 00 to 1 00 Under SCSP
C/O Link road Jamrara Kanjiyara Butayala to Johar Ji road km 0/0 to 6/0 SH C/O road Jeepable standard to 5/7 mtr wide in km 1/430 to 2/390
M/T link road sihardi chamara to behere ka Ketch in km 0/0 to 0/120 SH P L Gr II III and M T at Rd 0/0 to 0/700 DC Deposit
CO Link Road Chhamakari to Sua Via Harijan Basti Khadli Km 000 to 600 SH C/O 900mm dia RCC HPC including both side wing wall at Rd 2/105 2/1802/295 2/480 and 2/910)Under SCDP
Routine Maintenance of Joginder Nagar Machhyal Basahi Traimbli road Km. 0/0 to 30/0 (Total Kms. 30.00)) under Performance Based Maintenance contract (PBMC) for Rural road for the year 2020-21
Periodic Renewal of Rural Road Kandor Bhungtial road Annual Maintenance Plan for the year 2023/24 SH Providing and laying 30mm single layer bituminous concrete HP0410VR009318203 km 2/00 to 2/700
(SH- P/L 30mm thick BC including profile correction in Km. 2/0 to 3/0 under performance based incentive (During the year 2020-21) PMGSY Rural Road VR- 0045
Restoration of rain damages of Internal road at IRB Bangarh km.0.0 to 1.600 (SH Retaining wall behind Bn. Temple Mohal at RD.0.0 to 0.030) (Deposit work)
(SH- P/L tack coat, P/L 30mm thick B.C. and 2.5mm thick road marking thermoplastic strip from km. 0/0 to 1/0.(HP0301VR0037).(Under PMGSY).
(SH- P/L tack coat, P/L 30mm thick B.C. and 2.5mm thick road marking thermoplastic strip from km. 0/0 to 1/400.(HP0301VR0035).(Under PMGSY).
ROFD, CD Works, R Walls MT C.C. Pavement Side Drain Side Parapets Road Furniture and 5 year routine maintenance under PMGSY Batch II Package No. HP-04-311
Repair of road at km 0/00 to 5/500, (C/O R/wall at Rd 0/780 to 0/796) (DC Deposit)
Repair of road at km 0/00 to 2/300, (C/O R/wall at Rd 0/810 to 0/818) (DC Deposit)
A/R and M/O to GPRA at Longwood and Craigdhu Shimla during 2026-27. (SH: Repair/restoration of retaining wall at entry of approach road towards Block-5, Type-I quarters at Craigdhu, Longwood Shimla)
Balance work Special repair of approach road leading to Bharyal Plant from Taradevi Totu Bye-pass in ward No 7 Majyath (SH Providing and Laying C C 1 2 4 and Construction of V shape Drain)
Repair of Parapets, Breast walls and drain along approach road to Power House, Adit-II, Surge shaft and TRT and restoration of fencing at TRT, Chamera-II Power Station, Karian Chamba, (H.P.) (Pkg. No. C-875)
Construction of Govt ITI Building Gagret at Bhaderkali Tehsil Ghanari Distt Una HP SH Main building civil work water supply and sanitary installation site development SepticTank Rain water harvesting tank approach road and Work shop Block
Job 1 Repair and Restoration of Palakwah Lalhri Nangal Khurd Jattpur road km 0-0 to 10-400 Sub Head P.L Paver block for R-O approach road to Baba Bankhandi Mandir near GSSS Nangal Khurd
Restoration of rain damages of LWSS Tansal Karsal in Tehsil Lad Bharol Distt Mandi HP SH CO plum in CC 1 5 10 15 plum to protect the raw water tank near approach road at Tikru
Restoration of rain damages of LWSS Tansal Karsal in Tehsil Lad Bharol Distt Mandi HP SH CO plum in CC 1 5 10 15 plum to protect the raw water tank near approach road at Tikru
Metalling and Tarring, R-walls B-walls, PCC drain Parapets, km Stone, Setting out, Metal Beam, Un-Paved shoulder and five year maintenance under PMGSY-II Package No.HP-06-144.
Construction of road from Romali to Deem Km 0.000 to 6.400 HP06359
Construction of road from Thachwi to Ladher Km 0.000 to 5.390 HP06373
Construction of road from Kishanpura Chanal Majra road to Jail at Kishanpura.
Construction of road to the newly acquired area at DMR Chambaghat Solan H.P. Subwork/Packages: Construction of road to the newly acquired area at DMR Dhambaghat Solan H.P.
Construction of link road from Dev Ka More to Harijan Basti Bobri Khodri Km 0/0 to 6/0 in District Sirmour HP ( SH- Formation Cutting 5/7 Mtrs wide road , Cross- Drainage and P/L Soling in Km 0/0 to 6/0)( SW- Widening of curves/road cutting at RD 0
Construction of link road to Nanidhar Bohar Khari Thumbari road Km 0/0 to 4/150 ( SH- Jeepable standard 2.40 Mtrs wide to 5/7 Mtrs wide road , Cross-Drainage and P/L Soling in Km 0/0 to 4/100)( SW- Jeepable standard 2.40 Mtrs wide to 5/7 Mtrs wid
SH P/L 25mm thick Bituminous concrete km 0/0 to 1/0 Rural Roads
C/O V-Shape and thermoplastic compound on Pharnol to Dalyahoo road Km 0/0 to 1/00 VR-035
Providing and laying Tack coat and Mix seal surfacing (25mm thick) in Km. 1/00 to 2/00
Upgradation of Tasli Nallah To Garli Sari Road (T-14) from km-0/000 to km-8/500 under PMGSY-III (Batch-I)
Improvement of road safety from Km 200 to 219 350 of NH 22 New NH 05 Kalka Shimla Wangtoo road in selected stretches between in the State of Himachal Pradesh
Strengthening and improvement of road including road safety items from Km 334/00 to Km 337/140 on NH-05 22 in the State of Himachal Pradesh on EPC mode
MPR/2024/430 Other Geometrical Improvement of road from main road to village Rakharara GP Haler (SH C/o R/wall from RD 0/645 to 0/660) Deposit work
PERIODIC RENEWAL ON BATHRA SWANTA ROAD SH P.L 30MM THICK BITUMINOUS CONCRETE IN KM 0.0 TO 2.00 VR02321302 AND VR023213102 UNDER PMGSY
Construction of Hadsar to Kugti Road Km 0/000 to 10/320 Under PMGSY (Batch-II, 2018-19 in Distt Chamba (HP)
UPgradation of Mandap Chowky Kaloga Mangal Road (T-07) from km. 0/0 to km. 6/880 under PMGSY-III (Batch-I)