Loading…
Loading…
900 results • Best match
Construction of 1 mtr span culvert PCC side drain R wall and B wall in link road to Rasermo VIA Dakmar khardong under capex
Providing and laying MS pipe, 100mm thick WMM and 25mm thick SDBC in link road from Skuru bridge to main Gerf raod.L 1.80Km.Under SDP.
Construction of Zamindari walling and 30.00 mtr span causeway in link road of Diskit with proper side drain including bridge at Tingang Nallah.Under SDP.
Construction of link road from Kartse Zing to Council Quarter Skara ( By way of earth cutting , filling , retaining wall, side drain and Z/ Wall )
Clearance of Slip repair and restoration of R/wall and side drain in link road from Koyak thang to Trith under Non plan mantanance.
Upgradation by way GSB 150mm WMM 100mm BM 50mm and OGPC 25mm thick in link road St Peter road to Paldan House Chuchot Yokma.
Construction of link road from main road to Data Barma Kargyam by way of embankment and chain link fencing under capex budget New Scheme
Construction of link road from Dakgyap to dortundup Matho by way of R/wall side drain etc Km 1st and 2nd Rd (890-1100)
Construction of link road at Rasermo Khardong by way of earth work in Filling and providing and laying WBM 1st 100mm thick Under SDP.
Up-gradation of Link road to nallah tukchu balurong by way of 150mm GSB, 100 mm WMM, BM, 25 mm OGPC and tack coat
Construction of link road from Dokpa Tsering to old HSS Chuchot Shamma. (by way of 4m Span RCC culvert, side drain and R/Wall)
Improvement of link road to Khema by way of earth filling Rd, 0 to 400 mtrs and construction of R/wall at khungru gompa.
Construction of Link Road Sabchok yoknos Chemday road by way of M.S Pipe , 150 mm GSB,75 mm WMM,50mm BM and 25mm OGPC
Repair , Re-Surfacing and Construction of 1 Nos of Construction of Link Road Shoto Goma Kargil at Kargil Town (PKG II) In UT Ladakh.
Construction of Link Road Tsoq Frait to Thangjuk Churabs Samrah. (by way of Construction of 1x18 Mtr Span Bridge and Approach Roads) (under Capex)
Upgradation of Link Road from Chulachey to Tharumsa Pashkum instead of Construction of Eco-Amusement Park at pashkum.(By way of Macadamization) (Under Capex)
CONSTRUCTION OF 1 x 60 mtr SPAN INTERMEDIATE LANE ARCH TYPE MOTORABLE BRIDGE OVER RIVER SURU AT BALTI BAZAR JUNCTION Incld. Design, Supply, Fabrication and lunching /decking of Superstructure, Abutments , approach road ,Protection work etc. (Under
Construction of internal road to Yulkum village by way of earth work in embankment ,Pcc side drain , 1 no of RCC culvert and cross drainages ( towards Shagtakpa House
GE/KHU-28/2021-22 SPECIAL REPAIR TO BATHROOMS ,TOILETS AND URINAL POINTS AT CERTAIN BLDG OF MEAL DET KHALTSI AND PROVN OF APPROACH ROAD AT LAMAYURU IN THE AOR OF AGE B/R-II KHALTSI, UNDER GE KHUMBATHANG
Construction of road from Tsaka house to Khamba Yokma Rantak Chuchot Shamma
Construction of road from Tokchunpa to Khatopa with Motorable bridge at Lungba
Construction of Link Road to Lasthang Baima Road by way of R R Masonary, side Drain at various spot in km 1st.(Under District Plan).
Earth work cutting, filling and Providing and laying of WBM Ist in link road from Sheldum Naga to ThaldaMuth.(RD.2000-3160Mtr) (UNDER D. Plan)
Construction of link road to Klakbuk Mohallah Yerath by way of cutting filling 2 nos 1 mtr span culvert and side drain Under Capex Budget
Upgradation of Link road from Yerath to Shachukul by way of cross drainage 8 nos 1 mtrs span RCC culvert and protection work ( Under SDP )
Improvement/up-gradation of link road to Khema by way of Zamindari walling PCC side drain and providing and laying of MS pipe under Capex.
Construction of internal link road to Udmaru by way of retaining wall zamindari wall and earth work and 1 mtr span RCC Culvert under capex.
Widening of link road from Gonpa to Choochan Dingchay Fokar, , Under the scheme-Capex Block -Shargole, Kargil For the year (2023-24), Length - 3 00KM
Construction of link road Abadi to Chulung Mulbek, phase - 2nd Under the scheme-State Sector Block Shargole, Kargil For the year (2023-24) Length 5.50KM
CWE BLY/GE(W)/120 OF 24-25 SPL REPAIR OF ROADS AT ORD STORE, KARGIL HALL, CSD AND INTERLOCKING PATH, CHEQUERED TILES AND HARDSTANDING AT IBGH, YAMINI PARK, ADM BLOCK, KARGIL HALL AT JLA BAREILLY UNDER GE (WEST) BAREILLY
PL of 25 mm compacted thick OGPC link road of Diskit with proper side drain WBM and Blacktopping Zampa to Sand Dune Including bridge at Tingang Nallah from Zampa upto Chowk
Development Of Industrial Estate AT Changrathang Kargil Phase -II by way of for Landscaping including internal road, earth work, side drain, footpath,RR masonary, concrete work etc Under SDP
Construction of Link Road from Tokpo Mohallah Yangthang to Lhababs RD 0-750 mtr and construction of B/Wall from RD 0-165 mtr.(Under District Plan)
Construction of link road from Maney tungchur to maney Khang at Tsati by way of R wall B Wall and laying of MS pipe Under Capex
Construction of link road to khardong Gonpa parking by way of earthwork in cutting filling and R wall,Z wall PCC side drain etc under capex
Providing and Laying of MS Pipe and Construction of 1 Mtr Span RCC culvert in Link Road from Thangkop village to Chomomamay to Nillabuk chowla house
Construction of 2 Nos of 1Mtr Span RCC culvert in link road from Anlay to Buk-Shado in Km 5th to Khaldo Pongok via Zing Soma.
Providing and laying of WBM Ist and IIIrd and Construction of B/wall in link road Tasur to Tukla.(RD.0 to 250Mtr) (UNDER D. Plan)
2 Upgradation of link road from Airport Khurbathang to Khardong Shakulchay Pashkum RD 7800mtrs to RD11200mts including 700 mtrs Lenghth at Tharumsa pashkum Limb Under CRIF
Construction of link road to Terchay village by way of earth work in filling 1.0 mtr span Rcc Culvert PCC side drain etc towards Lhung.Under Capex.
Construction of link road from main Greef road to Kharponthang Tyakshi Bridge site by way of earth work in embankment and 1.5 mtr span RCC culvert
CONSTRUCTION OF 5 x 60 mtr SPAN TWO LANE MOTORABLE BRIDGEWITH PEDESTRAIN ON BOTH SIDE OVER RIVER SURU AT BAROO Incld. Design, Supply, Fabrication and lunching /decking, Superstructure, Abutments ,piers, approach road etc.(DC OFFICE ROAD TO ANDO
Construction of road from Sokpo house to Balu Laga Tunglung Basgo ( Under Capex )
Construction of road from main road via Rantak, Tsangtha, Bridge to Main Road
Construction of road side drain concrete walling from Chumik to Dukpa to Stok
Supply, Installation, Testing and Commissioning for shifting of HT Line by way of replacement of DW Poles by 9Mtrs poles due to road widening at Phuktsey and Shifting of HT/LT Poles coming under the alignment of road at Kyungyam.
P/L of GSB 150 mm thick , WMM 75 mm thick and 25 mm (compacted) thick OGPC link road of . 1. Takkhuk to Lato at Panamik Gongma L 0.93 Km 2 Kobet Village L 2.30 Km
Construction of link road from Sumgyak to Stujing by way of zamindari walling P/L MS pipe and 1.00 mtr span RCC Culvert at Sumoor under capex.
Construction of Link road from Dokpa Tseing to old HSS chuchot Shamma by way of providing and laying of 10mm GSB, 75mm WMM, and 25mm thick OGPC
Providing and laying of GSB 150mm thick GSB, 100mm thick WMM, 25mm thick OGPC and 1 Mtr Span Culvert in link road to Vipasana Meditation Centre Saboo.