Loading…
Loading…
900 results • Best match
Construction of Link Road from Sumdho to Photoksar via Askuta RD 0-1160 mtr including 3 mtr Span RCC Culvert at RD 150 mtr .(Under District Plan)
Construction of 2 no 10 mtr span causeway and right site approach and jacketing of abutment on improvement and upgradation of link road to Tangyar upto Gonpa.
Developmental work for Municipal Committee Kargil Phase II by way of Remodeling of Khul at Adul Gund Damaged due to Repair of road
Construction of Road including Black Topping from Gompa Parking to Chomo Lakhang with Parking.
Upgradation and Maintenance of road from T07 LR Andoo to Zamistang Colony Length 5.60 Km Package No LD02 026 Stage C PMGSY III, Batch-I,
Providing and Laying of 75 mm thick WMM and 25 mm thick OGPC at Link Road from Fanjila Ursi to Ursi Dok km 2nd to 5th (Under Languishing)
Providing and laying of 150 mm thick GSB, 100 mm thick WMM, 50mm thick BM, 25mm thick OGPC for Construction of link road from Chospelling to Thangkob Basgo
Construction of link road towards Sindhu Bhawan at Choglamsar by way of 150mm thick, GSB 100MM thick WMM, 50 MM thick BM, 25MM thick OGPC and seal coat.
Construction of Abutment for 15 mtr clear span steel girder bridge over Igoo phey Nallah in Link Road from stok to Plam Bridge Agling (L4.50KM) (Under State sector.)
Internal link road to Lagjung by way of P L of GSB 150 mm thick WMM 75 mm thick and 25 mm compacted thick OGPC L 2.20 Km
Providing and laying 100mm thick GSB, 100mm thick WMM and 25mm thick GSB, 100mm thick WMM and 25mm thick OGPC in link road Spituk to Tongray road spituk
Up-gradation of Internal road in Murtsay/Ibex Colony/ Skalzang/ Agling/Dambuchan and MES Colony by way of Providing and laying 100mm thick GSB.75mm WMM, 50mm thick,BM, 20mm thick OGPC
MAINTENANCE OF INTERNAL ROADS, BERMS AND ROAD FURNITURE UNDER AGE BR II OF GE 865 EWS
Construction of link road to Lehdoo Kapto by way of rising of Approach wall , filling /Banking, earth work cutting, R/Wall ,B/Wall From RD 0-610 mtr.(under Dist.Plan)
Construction of link road at Rantak Tagar Tharuk by way of cutting filling chain link fencing 1.0 mtr span RCC culvert side drain and crate protection work RD 660m
Up-gradation Of link road from Manytungchur to Manepa house via Skalzangling High school by way of providing and laying 100mm thick WMM ,50mm thick BM , 20mm thick OGPC
construction of 8 Mtr span RCC Bridge PCC R/Wall Leh Tokpo Nallah RD 125 to 175 of link Road Leh pa house to Tia pa House Skara leh
Construction of road from Workshop to FRL Skampuk village (From Km 2nd onwards. under capex
Construction of road from Gongma Chumik Andoo to Fire Brigade Bridge Kargil.(Under State Sector)
Upgradation and Maintenance of road from MRL02 LR Khachey to Sander Length 6 50Km Package No LD02 014 Stage ,PMGSY III Batch-I Block Shargole PIU Kargil
Construction of link road at Tangyar village old Tangyar by way of R Wall B wall Z wall side drain cutting and filling Km 1st Rd 0 to 240 mtrs
Construction of link road to ombay via M/S Hunder Ombay by way of Z/walling, side drain ,earth work in filling and 0.6 mtr span Culvert etc under capex.
Upgradation of Link Road to Lower Kumik Spang Kumic and Pidmo Zanskar by way of Laying of RBM, Cross drainage works, PCC edge walls and Flexible Pavement. Under State Sector.
NIT for construction of Road Khangsar(Thang) Ph-II under Ladakh Gram Sadak Yojna 2021-22
Construction of road from Takmachik to Thasa Hammer and Khutu at Takmachik Gok. Under State Sector
const of Link road
PROVN OF PAVER BLOCK HARDSTANDING FOR STN WATER POINT AND PATHWAY FOR APPROACH ROAD TOWARDS OFFICE COMPLEX AND OFFRS RESIDENCE, GARBAGE PIT AND ONE VEH SHED FOR REPAIR OF LIGHT VEHICLE AT HQ UNIFORM FORCE FRI AT KIARI UNDER GE 860 EWS
Construction of Link road from Nakpo Maney to sama Photang karsaha Zanskar (RD0-2000) Limb 1 RD (0-800) Limb 2 RD (0-500) incld. Flexible pavement pavement and car Parking
Construction of link road of Panamik Yokma by way of P/L of GSB 150 MM , WMM 75 mm thick and 25 mm (compacted) thick OGPC (RD. 0 to 3.475 Km
Upgr and Maint of road from Karsha Bridge to Khasar via Youlang Length 5.50Km Package No LD02 020 Stage-C PMGSY-III Batch I Block Karsha PIU Kargil
Upgr Maintenance of road from MRL15 LR Khangral Sanjak Road to Phosa Length 5.10 Km Package No LD02 024 PMGSY III Batch I Block Shakar Chiktan PIU Kargil
Construction of road to Kartsey Gyamo Skara (By way of GSB, WMM, BM and OGPC) Length 470mtr
Construction of road from Lamdon School Thiksay to Nyarma by way of earth work and R-wall
CONSTRUCTION OF ROAD FROM GONGLA KUKSHOW TO LEHDO VIA REBILIK.. (Total Length of Road 11.5Km)(Under CRIF)
Construction of Motorable Bridge from Burma to Sumoor Sand Dune. (including road work) (Under SDP)
SPECIAL REPAIR OF ROAD IN TECH AREA OF FPD AND LOWER CAMP GATE TO LOWER CAMP AREA OF 257 TRANSIT CAMP UNDER GE 865 EWS AT LEH
75mm WMM and 25mm OGPC starting at main road RD 3600m of L R to Phyang via Thangol to Gonpa road main road to Changmachan and Barzi Yartsa road Phyang Improvement of Internal road at Phyang
Construction of link road from Agling farm to Lungmochey Spituk by way of earth filling 500mtr length, 4 nos 2.0 mtr span culvert and M.S pipe at different spots. Under District Plan
Construction of motorable bridge at Bukbukza Wanla. (Fabrication, launching of super structure for 20mtrs c/c span plate girder type bridge including approach wall and link road at Bukbukza). (Under Distt. Plan).
Upgr and Maint of road from MRL02 LR Pipiting to Quilla Ufti Zanaskar Length 5.00Km Package No LD02 015 Stage C PMGSY III, Batch-I Block Zanaskar PIU Kargil
CA NO. CWE BLY /GE(W) / 102 OF 2021-2022 SPECIAL REPAIRS TO BITUMINOUS ROADS FROM NATRAJ CINEMA TO FD REGT, SIGNAL CHOWK TO KARGIL CHOWK AND INTERNAL ROAD OF HQ UB AREA UNDER GE (WEST) BAREILLY
CONSTRUCTION AND IMPROVEMENT OF ROAD NIMMU- PADAM- DARCHA TO NHDL SPECIFICATION (10 MTR WIDTH) BETWEEN KM 95 PT 00 TO KM 109 PT 700 ROAD UNDER 114 RCC IN PROJECT YOJAK IN LADAKH (UT) THROUGH EPC MODE OF EXECUTION
Improvement of link road to Ulley. (By way of providing and laying 150mm thick GSB 100mm thick WMM 50mm thick BM and 25mm thick OGPC)RD 1750 to 8125mtr Length 6375mtr (Under SDP)
Construction of Link Road from Airport Kurbathang to Khardong Shakulchay Pashkum (By way of constt. Of Edge wall and R/Wall at various spot RD 9180-10750 mtr and Additional Length) (under CRIF)
same as above
Construction of road from Phyang to Darma foundation centre Phyang ( by way of Edge wall and R/wall)
Construction of road Zorawar bridge to skara bridge (By way of GSB, WMM, BM and OGPG) Length 600mtr
Construction of Culture Centre consisting main building ( B plus G plus 3) and Auditorium building (B plus G plus 1) including development works i.e. internal Roads with footpath, external sewerage, water supply, storm water drain, rain water harvesting, boundary wall and bulk services for civil and electrical at Leh near LAHDC complex Leh, UT of Ladakh on EPC(mode-II) basis.
Construction of Link Road form Middle School Yerath to Samroh Area Yerath by way of earthwork , Masonry , Chain link fencing and 4 Nos 1.0 Mtr span RCC culvert RD 270 to 965 ( Under Capex )
Upgradation and Maintenance of road from MRL011 L,R Padum Zangla Road Km 2nd RD 200 to Sheela Length 6.00 Km, Package No LD02 017 Stage PMGSY III Block Zanaskar Kargil