Loading…
Loading…
2,858 results • Best match
Improvement of road from Udaipur-KIlla road to Killa PHC(L 0.280 KM) and Road from Joing Bari Bazarto Killa-Dewanbari road (L 0.70 KM) portion from Ch.0.10 Km to Ch.0.41 Km under SHYAMA PRASAD MUKHERJI RURBAN MISSION (SPMRM) At Killa Cluster
Recarpeting of damaged internal roads 190 mtr from GC main gate to Type IV family quarter No 1 near T point and 360 mtr from SOs Mess T point to near bus stand T point in GC CRPF Agartala
Development and construction of road and drain work under AMC Ward No.39.
STRENGTHENING OF ROAD FROM CHAMPAKNAGAR MARKET (NH-08) TO PADMAMOHANPARA UNDER JIRANIA R.D BLOCK, WEST TRIPURA DURING THE YEAR 2024-25 (CH 1.00 KM TO CH 2.00 KM ,LENGTH 1.00KM).
Strengthening of road from Jagabandhu Para Market to Billaram Para (L041) (Length - 6.05 km)/SH- Patch metalling, Carpeting, Road furniture, side drain etc. (Portion from 3.025 km to 6.05 km).
Strengthening of road from Solonala to Bagaicherra Panchayat office And road from Pecharthal Laljuri road to Nalkata High School under RIDFXXVII of NABARD Job no TP/COM/6/2022-23
Strengthening of road from Jagabandhu Para Market to Billaram Para (L041) (Length - 6.05 km)/SH- Patch metalling, Carpeting, Road furniture, side drain etc. (Portion from 0.00 km to 3.025 km).
Strengthening of road from Fatikcherra SB School to DM colony during the year 2024 25 SH Metalling, Carpeting and Seal coat Pucca Drain Paver block etc L 2 10 Km
Strengthening of road starting from NH-08 to SP Office Dhalai covering District Head Quater Complex during the year 2024-2025/ SH- Bituminous Concrete, seal coating, Road marking, road furniture.
ROAD WORK
1. PR of completed PMGSY road from Tepania to Bagma (L050) length 4.200 km under SJTNJ Scheme
6. PR of completed PMGSY road from Gukulpur to Chataria (L044) length 4.200 km under SJTNJ Scheme
Brick soling road from PMGSY road to Bhanu Das house at Rupacherra GP under Teliamura RD Block
6. PR of completed PMGSY road from Naliamura to Sahapara (L049) length 1.876 km under SJTNY Scheme
Improvement of Road from KMA road to Noajoy Para via Germanjoy Para under Ambassa RD block (L- 2.385 km) under RIDF XXIX of NABARD
Improvement of road from A.A. road to Maharanipur road (L-1.80km) during the year 2024-25./SH- Protection work, laying paver block work etc
Improvement of road from Champaknagar to Jampuijala via Belbari Length 13.65 km under CRF Scheme in the State of Tripura Balance Work 5th Call.
Improvement of road by earth filling, brick soling, beside SefaliSutradhar house to beside SubhashBhowmik house at ward no-12 during the year 2024-25
IMPROVEMENT OF ROAD FROM BAGBASA HIGHSCHOOL TO KHANDAKAR PARA VIA WARD NO 2 USHARANI AWC UNDER NALCHAR ASSEMBLY CONSTITUENCY(UNDER RIDF XXXI OF NABARD)
Improvement of road from Pecharthal near NH 08 to Bidharshan Bhabna Mandir via Shilcherra Old NEC road under RIDF XXVII of NABARD Job NoTPCOM02202223
Improvement of road from Barabaiya Nandi bari to Khupilong bazar under the Scheme for Special Assistance to States for Capital Investment for 2024-25
Improvement of road by paver block laying from the H O Sri Sujit Bhowmik to main road at Ashrampara Under ward No 37, AMC
Improvement of road by p/wall and paver block st. from H.O Uttam Das to H.O BimalSaha at shyamSundarpara Under Ward No-42,AMC.
Improvement of road from Baluabari To Sonaraibari Under Padmabil RD Block L 1.00 Km SH GSB WBM carpeting and other allied works. 2nd Call
Improvement of road from Sonamura-Boxanagar road (near Kamalnagar School) to Sonamura-Boxanagar road (Batadola Beltali) (L-3.69 Km) under RIDF-XXVIII of NABARD
Improvement of road from Satpara PWD road to Jiban sardar para under Mandwi R. D. Block (Length 1.01 km) during the year 2024-25.
Improvement of road from Subhananda para To Khas kalyanpur Under Padmabil RD Block L 1.00 Km SH GSB,WBM, carpeting and other allied works.
Improvement of road by earth filling brick soling G/wall paver block and construction of drain at different places of ward No 49,AMC.
Improvement of road from Wandalwng PWD NH To Subhananda para Under Padmabil RD Block L1.00 Km SH GSB,WBM, carpeting and other allied works.
Strengthening and widening of road from NH_08 (started from Lockdown Market) to proposed ALIMCO Project under Laxmibill GP (L_2 point 50 Km)_ SH_Providing GSB, WBM and PMC alongwith other allied works under RIDF XXIX of NABARD
Periodical Renewal of PMGSY handed over road from Old Mandwi Patni NEC Colony to Jiban Sardar Para (Link No 047) (Length 2.656 Km ) (Package no TR01-250-06) under the performance incentive of PMGSY under Mandwi Sub-Division, Mandwi Block..
3rd call for Construction of Approach Road from Administrative Block to College Canteen via Academic Block in the premises of Rabindranath Thakur Mahavidyalaya, Bishalgarh, Sepahijala for the year 2024-25.
Maintenance of PHC Primary Health Centre Building under Mandwi RD block during the year 2019 20 SH Repairing of old plaster, Water Proofing Treatment, Painting, approach road soling etc complete.
Construction of Rice GoDown Having 1000 MT capacity at Killa under Killa Agri Sub-Division Gomati Tripura SH Approach road Site Development along with side drain box culvert Re Tender
Mtc. of Vanghmun village approach road (Near to St. Thomas School) under Jampui Hill Sub-Division, PWD(RnB) during the year 2025-2026/SH- RCC Protection wall (Length 30.00 mtr).
Mtc. of Vanghmun to Khanpui road under Jampui Hill Sub-Division, PWD(RnB) during the year 2025-2026/SH RCC Protection wall near Tlangsang village approach road (Length 18.10 mtr).
Dev of Infrastructure on Floriculture unit Udaipur Progeny Orchard Gakulpur Udaipur Gomati Tripura SH Construction of Approach Road along with side wall at Progeny Orchard at Gakulpur Udaipur Gomati Tripura
Mtc. of village approach road of Tlangsang under Jampuihill R.D Block during the year 2020 21 SH Patch Metaling, Bituminous Grouting,Carpeting, Seal coating including road side pucca drain etc.
Proposed Construction of Godown, Office and Dormitory (Phase II Development) at THHDC Complex, Purbasha, Agartala, West Tripura_SH_ Building portion including internal water supply, sanitary Installation_SH_ Construction of internal approach road,
Renovation/ Mtc. of PWD (RandB) Sub-division office at Karbook, Gomati district Tripura during the year 2026-27/ SH-Extension of room, flooring, roofing, approach, road and sanitary work, etc.
Construction of Underground sump, water supply, internal roads, storm water drain, street/security light, Distribution system (Electric connection/feeder pillars/sub-station/UG cables, DG sets with sheds etc.) for Sephenjuri Campus under SHQ BSF Panisagar under FTR HQ BSF Tripura.
Strengthening of road starting from KA road to Sudhangshu Ghosh para (Length - 1.50 Km) during the year 2024-2025/ SH- Patch metalling, grouting, carpeting/re-carpeting, seal coating, constn. Drain etc.
Strengthening of road from NH-8 to Kamalacharra from Ch.0.00 Km to Ch.1.50 Km (L-1.50km)/GSB, WBM-II, WBM-III, Carpeting Road side drain, protection wall, CD etc.
Strengthening of road from KA at Bhatkhori to KA road via Nalicherra bypass road under Ambassa RD block (L-2.295km)under RIDF XXIX of NABARD (Job No.TP/COM/ 239/23-24).
Strengthening of road from KA Road at Kulai Bazar to KA road at Basudebpara via Harinmara (L-4.00 km) under RIDF XXVIII of NABARD. (Job No. TP/COM/15/2023-24)
Strengthening of road from Belbari to Joykrishna Bari (near Belbari bazar) under Belbari R.D. Block (L 5.50 km) under RIDF XXIX of NABARD (Job No.TP/COM/ 224/2023 24) (2nd Call).
Strengthening of road from Ranirbazar Gopal road (NH 8) To Nalgaria (NH 08) via Railway over bridge and Water Treatment Plant to Bhumihin Colony under Jirania R.D Block (L 3.950 Km).
Strengthening of road from Khowai Assam rifle camp to Anandamarga school under Khowai RD Block under PWD RandB Khowai Subdivision during the year 2025 26 SH GSB, WBM, BM, BC etc.
Strengthening of road from Khowai Jeep stand to Assam rifle camp under Khowai RD Block under PWD RandB Khowai Subdivision during the year 2025 26 SH GSB, WBM, BM, BC etc.