Loading…
Loading…
2,858 results • Best match
Approach road
FDR Maintenance of approach road for newly construction PWD Sub Divisional Office (L 0.820 km, Length to be repaired 0.200 km), road from PWD near Ratannagar J.B School to PMGSY Kaborkhola via Ratannagar Muslim Para (L 1.00 km..
Improvement of road from Khudrakandhi School to Kanaibazar via Syleti camp under RIDF - XXVIII of NABARD
Improvement of approach road of Social Welfare Officer, under Div-II, AMC
Repairing of Potholes and damaged Patches (Re-carpeting) of internal roads at GC CRPF Adarani, Agartala, West Tripura
Construction of 500 MT Food Godown at Ganganagar, Dhalai, Tripura/ SH - Construction of Approach and Internal roads etc.
Strengthening of road from Lefunga to Abhicharan under RIDF XXVIII of NABARD.
Mashimukh to AA Road (Munda Para), Nalkata Darlong Basti to Gayamani Para, Kanta Chow to Nepal Tilla
Saiker to Upper Saiker, Mayachari to Nutanbagan, KA Road to Rangicherra
Ashapurna Roaja Para to Thuisakatar, Joyanti Bazar to Mendi Para, Salema PHE to West Singhinala
Approach road
Strengthening of road from Banikya Chowmohani to IOCL (L 4.125 km) during the year 2022 23 SH Strengthening of road by providing WBM III, DGBM, BC including protection work etc.
Strengthening of road from Joynagar bus stand to Akhaura road near Aguntok Club including sub roads. II. Strengthening of road from Battala to Dashamighat under Bordowali Constituency Assembly 2.99 km
Building portion and approach road
Upgradation of rural road from Kakraban to Dhuptali (via Mirza and Tulamura) in Kakraban block under PMGSY/SH- Shifting of drinking water supply pipeline under kakraban, DWS Sub-Division, Gomati District, Tripura during the year 2021-22.
Preparation of Detailed Project Reports (DPRs) as per Latest Guidelines of PMGSY etc. for Rural Road Projects (Including Culverts/ Cross drainage Structures/Side Wall/ Side Drain etc. as applicable) for the unconnected Habitation under R.D Agartala D
Preparation of Detailed Project Reports (DPR) as per Latest Guidelines of PMGSY etc. for Rural Road Projects (Incl. Culverts/Cross drainage Structures/Side Wall/Side Drain etc. as applicable) for the unconnected Habitation under R.D Mohanpur Div.
Improvement of Road by Metalling carpeting.
Widening of road adjacent to proposed Oxygen building and construction of one retaining wall alongwith extension of existing cross drain at District Hospital complex , Tepania during the year 2021-2022
Maintenance of Sepahijala Zoological Park Road Main road and internal roads/ SH Pot hole repair and patch repairing etc
Resurfacing of Shantipara Internal Roads by Bituminous Concrete and Premix Carpet SH Bituminous Concrete work with other aliied items
Strengthening of road from Suknacherra to Bara Kangrai under RIDF-XXVII of NABARD
Strengthening of road from Dhanirampur V.C Boxanagar under Sonamura Constituency Assembly (L-6.51km).
Strengthening of road from Kamalghat to Lefunga under Mohanpur Constituency Assembly( 5.00 Km).
Improvement of road from Khilpara to Nathpara, ii) Improvement of road from Buradighi east to Bhumihin colony under Matabari Constituency Assembly (5.85 km).
Mtc of approach road of Samrurpar PHC L 0.20Km Jamtailbari Internal Road L 0.20Km Tachai PWD Road to Box cell culvert of Indiranagar Road L 0.25 Km during the year 2022 -23 SH Side berm dressing, protection works, drain, patch mg. patch soling, ma
Preparation of Detailed Project Reports (DPRs) as per Latest Guidelines of PMGSY etc. for Rural Road Projects (Incl Bridges,Cross drainage Structures) for the unconnected Habitation under Manu and Chawmanu RD Block area of R.D Manu Division, Dhalai.
Improvement of road from Jangalia NH 08 to Dhakabari
Approach road in the premises of NNM PHC at Halaicherra at Sarajini G.P
DPR rural road projects
4. Construction of road side drain from Sanat Das house to Maragang in UMC, Ward No-16 in/c a portion of TRTC link road and Arunachal Sangha to Das para road/Construction of RCC drain and mtc. Of brick drain during the year 2023-24
PMGSY road works
PMGSY road works
PMGSY Road works
PMGSY road works
PMGSy road works
PMGSY road works
PMGSY road works
PMGSY road works
PMGSY road works
PMGSY road works
PMGSY road works
PMGSY road works
PMGSY road works
PMGSY road works
PMGSY road works
PMGSy road works
Maintenance of all Internal Roads of Khosbagan, Surjya Chowmuhani and Hawkers Market Area SH RCC, PMC, Brick Masonary Work etc
Maintenance of Internal Roads of Palace Compound Area under AMC Ward No 20 SH Brick Masonary Work, RCC Work etc
Mtc. Of internal roads of SE Complex Qtr complex during the year 2020 21 SH Patch grouting, carpeting, Seal coat.