Loading…
Loading…
2,867 results • Best match
Paver Block , PCC, Patch Grouting, Patch Metalling, Re-Carpeting, Seal Coat , Drain Clearance etc.
Construction
Mtc. Of Kalagang-Ditlang road construction of brick soling road from Kalagang to Lungthir under Jampui Hill Sub-Division, PWD(RnB) during the year 2025-26 SH- Clearing and grubbing road land, Maintenance of earthen shoulder, Surface drain, brick soli
Repairing maintenance of Road Construction Hiring of 1one No commercial Vehicle Maruti Eeco with driver and having commercial license and purchased not earlier than the year 2018 for official use of the SDO MSD Udaipur Tripura during the year 2425
Repairing, maintenance of road construction machineries, ADM Plants, Air Conditioning systems, lift works etc within the jurisdiction of all Districts of Tripura under Mechanical Division,PWD, R and B,Agartala for the year 2023 25 SH Hiring of 01 no
Repairing maintenance of road construction machineries having commercial Registration and purchased not earlier than the year 2019 along with Driver for official use of OO the SDO Mech Mechanical Sub Division I PWDRB Agartala for a period of 1 one y
Construction of RCC Bridge over River Gomati at Ch 49.800 Km and over River Muhuri at Ch 93.775 Km including Approach road to the bridge on Agartala to Sabroom road section of NH-08 (old NH-44) in the state of Tripura on EPC basis
Maintenance of 02(two) Nos. different works under Teliamura R.D Block as per PWD SoR 2023 namely i)Mtc. of Flood Diversion Drain from PWD Road to Twikarma Cherra at Uttar Krishnapur GP,ii)Mtc. of approach road nearest to RCC foot bridge at Korbong
SH-Protection work, cross drainage,bats filling, block pitching etc.
Construction of RCC Retaining wall with drain, brick masonary drain, brick Soling, with pothole repair etc.
Protection work
Patch grouting,BC etc. from CH. 11.00 km 13.90 km.
Patch grouting, patch metaling,BC etc. from Ch. 0.00 km to Ch. 2.80 km.
Patch grouting,patch metaling,BC,R wall etc. from CH.8.70 km to 10.70 km.
Patch grouting,patch metaling,BC,drain etc. from Ch. 6.00 km to Ch. 8.50 km.
Building portion G4 storied including internal water supply sanitary installation sewage and drainage works Boundary wall retaining wall and Road Works
PMJANMAN works
Metalling carpeting with sand seal coat and allied works
Site Clearance ,Earthwork , Drainage Works, Protection work, Granular Sub-bases, Bases (Non-Bituminous) and Shoulders, Bases and surface course Traffic Signs, Markings and Box culvert etc.
Patch soling, Metalling, Carpetting etc.Portion from Ch 0.70 Km to Ch 1.40 Km/Gr-II
SH- Patch soling, WBM III, carpeting, one (1) CD, unlined drains etc.
Metalling carpeting with sand seal coat and allied works
Earthwork,Protection work,drainage work,GSB,Metalling,PMC seal coat etc.
Earthwork,GSB,WBM,PMC,protection work etc.
Metalling, carpeting, seal coat, pucca drain etc.
SH GSB, WBM 2 and 3, DBM, BC, Retaining wall, CD and protection work etc. Group 2
SH GSB, WBM 2 and 3, DBM, BC, Retaining wall, CD and protection work etc. Group 1
Patch soling, WBM, Carpeting, Seal coating, Drain work, Protection work etc.
Construction of Academic Building and Administrative building, hostel building,quarters of the Director,Deputy Director and 03 (three) nos. each of Type- III and Type -II quarters for Grade-III staffs /Construction of internal road.
S.H Removal of Unsuitable soil, Patch Grouting, Patch Carpeting with sand seal coat, Filling of Mixed class Brick bats, Palasiding, Kutcha Drain and other allied works.
Removal of Unsuitable soil, Patch Grouting, Patch Carpeting with sand seal coat, Filling of Mixed class Brick bats, Palasiding, Kutcha Drain and other allied works.
patch metaling, re-carpetting etc. during the year 2022-23
Patch metalling, Grouting, Premix Carpeting and Seal coat.
Pot holes repair, Patch metalling, Re-carpeting, Protection wall and other allied works.
Grouting,pmc,seal coat,drain etc
Patch WBM, Grouting, Carpeting, Seal coat and Surface drain work
Patch WBM, Grouting, Carpeting, Sea coat and Surface drain work
maintenance of earthern shoulder, repair to pot holes, re-carpeting, seal coat etc.
Patch WBM, Grouting, Carpeting, Seal coat and Surface drain work
Patch metalling, Grouting, Re-carpeting, Road side katcha drains and other allied works
Patch WBM, Grouting, Carpeting, Seal coat and Surface drain work
Earthwork, PCC, Brick work, Plastering, Soling, Paver Block and other allied work
Patch metalling, Re-carpeting etc.
BRICK SOLING
Earthwork, protection work, WBM2, WBM3, PMC, Drainage work etc.
BRICK SOLING ROAD
patch Soling, WBM, grouting, PMC, sand seal coat, drain etc.
S.H Removal of Unsuitable soil, Patch Grouting, Patch Carpeting with sand seal coat, Filling of Mixed class Brick bats, Palasiding, Kutcha Drain and other allied works.