Loading…
Loading…
426 results • Best match
Construction of PLC and Chlorination room yard lighting and site development for Implementation of Drink from Tap with 24 x 7 water supply to Zone No-6(900KL) at CDA Ward No. 6(P) CMC, Cuttack under SUJAL
PROVN OF RECD FOR REDUCTION OF DG EMISSION AS PER CPCB NORMS TO 400 KVA DG SETS AT ITR TECH AREA 250 KVA AND 380 KVA DG SETS AT LAUNCH COMPLEXES. 125 KVA 100 KVA 82.5 KVA AND 62.5 KVA DG SETS AT TELEMETRY SITE A AND B CHANDIPUR AND 250 KVA, 82.5 KVA
SIMATIC S7-400, Power supply PS407- 10 A, as per technical specification, SIMATIC S7-400H, CPU 412-5H, as per technical specification, IM153-4 PN IO HF for 12 Modules S7- 300, ET200M, Bus Unit f. PS and IM 153, Battery Backup
2FJ140AB0, 2FK140AB0, 1BA02, 4BF00, 4FA05, 4FB04
Construction of PLC and Chlorination room yard lighting and site development for Implementation of Drink from Tap with 24 x 7 water supply to Zone No.10 at Lower Police Colony Ward No.8 (Part) CMC, Cuttack under SUJAL
Customized AMC/CMC for Pre-owned Products - CAMC of Oxygen generation plant model oxair OA200 including compressor air dryer carbon tower PSA system Oxygen receiver incl electrical control cable valves control panel PLC and HMI upto PSA output point;..
Imp. of 24x7 w/s to KALARAHANGA DMA of BMC ward No-2, Bhubaneswar under SUJAL (Const. of Positive suction pump house, PLC room and Electrical panel room, Chlorination Room, Internal , external electrification and Provision for Production well etc)
Imp. of 24x7 w/s to NANDAN VIHAR DMA of BMC ward No-2, Bhubaneswar under SUJAL (Const. of Positive suction pump house, PLC room and Electrical panel room, Chlorination Room, Internal , external electrification and Provision for Production well etc
PLC and Chlorination room construction and yard lighting with site development for Implementation of Drink from Tap with 24 x 7 water supply to Zone No-34 (750KL) at Badambadi to Ward No. 36(P) and 37 CMC, Cuttack under SUJAL
PLC and Chlorination Room construction and yard lighting with site development for Implementation of Drink from Tap with 24 x 7 water supply to Zone No-5 at Bidanasi Ward no-1 (P) AND ,2(P) CMC, Cuttack under SUJAL
Making System ready through PLC in all respect to meet all the extant statutory provisions and policy guidelines for Verification and Stamping (by Weights and Measures Department, Odisha) of Pre-weigh Hoppers in Wagon Loading System at New Silo, BOCP
Imp of 24x7 w/s to Prasanti Vihar KIIT DMA of BMC ward No-1, BBSR under SUJAL (Const of Positive suction pump house, PLC room and Electrical panel room, Chlorination Room, Internal , external electrification and Provision for Production well etc)
R/M Existing Piezometers 13Nos. in Anugul District for installation of DWLR Telemetry System under NHP (PKG- ANG-02)
Customized AMC/CMC for Pre-owned Products - Maintenance of PLC system with remote monitoring services along with site visit as and when required on OEM basis for a period of 365 days at New SILO BOCP; Vision Comptel Pvt Ltd; Annual Maintenance Contra..
Automation with Installation of Flow Meter, Flow Control Valve, PLC and chlorination system with provision of D.G. set for Implementation of Drink from Tap with 24x7 water supply to Zone No.42(600KL) at Badambadi ward No-44P and 45P CMC,Cuttack
Construction of PLC and Chlorination room including Yard lighting and site development work for Implementation of Drink from Tap with 24 x 7 water supply to Zone No-4 at CDA ward No.4 and ward No-5(P), CMC, Cuttack under SUJAL
PLC and Chlorination room construction and yard lighting and site development for Implementation of Drink from Tap with 24 x 7 water supply to Zone No.12 (450KL) at Bijupattanaik Chawk Ward No. 9(Part) and 16(part) CMC, Cuttack under SUJAL
PLC and Chlorination room construction including yard lighting and site development work for Implementation of Drink from Tap with 24 x 7 water supply to Zone No-35 (227KL) at Badambadi ward No-44(P) and 45(P) CMC, Cuttack under SUJAL
Installation of Diesel Pump-motor set, laying of M.S. Pipe line at Laikera railway bridge for transporting water with insta n comm of Sensor actuated PLC based fully automatic Foggy Dense-Mist generating system with AMC 2 years at Laikera KOCP BA
Supply and installation of new power cable and sub-main cable for SCADA system from left side main panel board to Mahanadi Barrage left side Bus Bar No.1 to 8 and Kendrapara Canal Bus Bar No.1 for the year 2025-26. (MBD66/2025-26)
R/M of Existing Piezometers 17Nos. In Sundargarh Districts for installation of DWLR Telemetry System under NHP (PKG-SBP-03)
R/M of Existing Piezometers 10Nos. In Sambalpur District for installation of DWLR Telemetry System under NHP (PKG-SBP-01)
Supply and installation of new power cable and sub-main cable for SCADA system from Jobra Control Tower main panel board to right side Mahanadi Barrage Bus Bar No.9 to 16 and Taladanda Canal Bus Bar No.1 for the year 2025-26. (MBD65/2025-26)
Construction of PLC and Chlorination room and yard lighting with site development work for Implementation of Drink from Tap with 24 x 7 water supply to Zone No-11 at Gorakabar (700KL) Ward No. 8(P), 9(P), 16(P) CMC, Cuttack under SUJAL
Installation of Flow Meter, Flow Control Valve, PLC and chlorination system with provision of D.G. set for Implementation of Drink from Tap with 24x7 water supply to Zone No-35 (227KL) at Badambadi ward No-44(P) and 4(P) CMC, Cuttack under SUJAL
Construction of PLC and Chlorination room including yard lighting with site development work for Implementation of Drink from Tap with 24x7 water supply to Zone No-8(850KL) at Krushak Bazar Ward No-7,Ward No-1(P),6(P) CMC, Cuttack under SUJAL
DESIGN SUPPLY INSTALLATION TESTING AND COMMISSIONING OF TANK FARM MANAGEMENT SYSTEM FOR 1 NO ABOVE GROUND VERTICAL TANK AND INTEGRATION WITH EXISTING TERMINAL AUTOMATION SYSTEM AT BALASORE DEPOT ODISHA
CAT NO. -9328-CCWDEVENM, MICRO-850 PLC FOR DG-5, 6&7
ECO STRUXURE CTRL EXP, CEXSPUCZLSPAZZ, SCH, SCADA 2023 R2 SERVER, PLTSCP-01-N-231
R/M of Existing Piezometers 08Nos. In Deogarh and Jharsuguda Districts for installation of DWLR Telemetry System under NHP (PKG-SBP-02)
Design, Supply, Installation, Testing and Commissioning of Instrumentation, PLC-based control systems, Fire and Gas alarm system including upgradation of existing PLC based Control system and Fire Gas alarm system, at specified station .
R/M of 06Nos. Existing Piezometer stations at Chadahandi, Kasamunda, Nandahandi different Blocks of Nawarangpur District for installation of DWLR Telemetry System under NHP
R/M of 12Nos. Existing Piezometer stations at Kesinga, Lanjigarh, M.rampur different blocks of Kalahandi District for installation of DWLR Telemetry System under NHP
R/M of 10Nos. Existing Piezometer stations at Narla, Kasamunda, Golmunda Kalampur Blocks of Kalahandi District for installation of DWLR Telemetry System under NHP
R/M of 12Nos. Existing Piezometer stations at Bhawanipatna, Dharmagarh, Junagarh Jaipatna Blocks of Kalahandi District for installation of DWLR Telemetry System under NHP
R/M of 08Nos. Existing Piezometer stations at Boden, Khariar, Komna, Sunapali different blocks of Kalahandi District for installation of DWLR Telemetry System under NHP
Material Code -26303010143 -Versamax Profibus Master module, Material Code -26303010146 - PLC Interrogation power supply 10A, Material Code -26303010147 -PLC Interrogation power supply 20A, Material Code - 26303010145 - Diode O Ring unit, Material Code - 26303010144 - Versamax communications carrier
SUPPLY AND PROVE OUT OF SIEMENS (SIMATIC PANEL) HMI UNIT TP 177B PN/DP MODEL NO. 6AV6642-0BA01-1AXI, SUPPLY AND PROVE OUT OF LATEST SIEMENS PLC S7-1200 SERIES WITH LATEST EQUIVALENT EXISTING ITEM: PLC
M9567746062 CPU 412-5H, CENTRAL PROCESSING UNIT, M9578746007 SIEMENS: COMPCT PLC FOR CNTRL PANEL(U2.2)
M9515776035N, M9560021002N, M9516016022 BOQ Title 9900257124 ABB PLC and DCS spares for TSTPS ST 1
DESIGN, ENGINEERING, SUPPLY, INSTALLATION AND COMMISSIONING OF UP-GRADATION OF PLC CPU AND ADAPTER S (Q3)
PROJECT: SUPPLY, RETROFITTING, TESTING AND COMMISSIONING FOR PLC CPU AND I/O ADAPTER UPGRADATION OF (Q3)
Ref. Enquiry Cum Offer and BoQ
Design, Supply, Installation, Testing and Commissioning of Tank Farm Management System for 2 nos. IFR above ground vertical tanks for Ethanol and integration with existing Terminal Automation System and Supply of FLP lights for TW unloading facility
Design, manufacture, supply of Manual Gravity Roller Conveyor, Installation, testing and commissioning of Manual Gravity Roller, Supply of PLC Panel wall mounted or floor mounted type for existing Gannon make conveyor, Installation of PLC Panel as ... of PLC Panel ...
Operation and Maintenance of E/M Installation for LRSAM Project, SBSIS Radar Building and JCOs and OR Building at LC-III and High Gain Telemetry System at Site C Chandipur
Network Improvement with Installation of Valves, Pipe laying, House connection, Construction of PLC room and Site development,Cuttack under SUJAL
Network Improvement with Installation of Valves, Pipe laying, House connection, Construction of PLC room and Site development,Cuttack under SUJAL
10" COLOUR LCD DISPLAY-MODEL QUICK PANEL, ANALOG I/P MODULE, 6CHANNEL, I C200ALG260, GE PLC AO Model IC 200 ALG 326D
Network Improvement with Installation of Valves, Pipe laying, House connection, Construction of PLC and Chlorination room and Site development,Cuttack under SUJAL