Loading…
Loading…
184 results • Best match
Providing consultancy services for installation of Effluent Treatment Plant (ETP)-cum-Sewage Treatment Plant STP at Model Jail Sector 51 Chandigarh
REPAIR TO SEWAGE TREATMENT PLANT, WATER SUPPLY LINES AND FITTINGS AT AF STN HIGHGROUNDS
Construction of Parking and road MRF, Grabage transfer station inside Sewage Treatment plant, 3 BRD Industrial Ph-II, Chandigarh
Collecting and conducting design parameters test of sewage samples at Sewage Treatment Plant Maloya and Raipur Kalan as per CPCB guidelines
Replacement of old and unserviceable defective equipments machinery and contingent works thereto at Sewage Treatment Plant Dhanas Chandigarh. Ch. to Revenue Head
Operation and All Inclusive Comprehensive Maintenance Contract (AICMC) for 02 years of Sewage Treatment Plant (STP) and Water Supply Pumps, Water Treatment Plant, Drainage Pumps (WTP) installed at Chandigarh International Airport Limited, Mohali.
Providing, Installation and Commissioning of Modular Type Sewage Treatment Plants for treatment of Waste Water generated from the village Faidan, Chandigarh Phase-II for site No.I
Construction of Approach road from Tribune Colony to Sewage treatment plant including laying of storm line and Street Light in Village Raipur Khurd Chandigarh
Providing, Installing and Commissioning of Modular Type Sewage Treatment Plant for treatment of Waste water generated from village Faidan, Chandigarh (Phase-I for site No.2)
Providing and fixing with urgent repair of electrical and mechanical spare parts at Sewage Treatment Plant at Industrial Area, Phase-III, Near Village Raipur Kalan U.T., Chandigarh.
CA NO CWE/CHD-34/2019-20 REPAIR, MAINT/IMPROVEMENT AND OPERATION OF SEWAGE TREATMENT PLANT AND CLEANING OF SEWAGE SUMPS AT K AREA ZIRKPUR UNDER GE CHANDIGARH
CA NO CWE/CHD-79/2020-21 REPAIR / MAINT OF OPERATING OF SEWAGE TREATMENT PLANT, ELECTRICAL PANEL SEWAGE MOTOR AND CLEANING OF SEWAGE PUMPS AT K AREA UNDER GE CHANDIGARH
REPAIR/MAINT OF OPERATING OF SEWAGE TREATMENT PLANT, SEWAGE MOTORS AND CLEANING TO SEWAGE SUMP INCLUDING REPAIR/REPLACEMENT OF SUBMERCIBLE PUMP AND CONNECTING ACCESSORIES AT K AREA UNDER GE CHANDIGARH
REPAIR AND MAINT OF OPERATING SEWAGE TREATMENT PLANT, SEWAGE MOTORS AND CLEANING TO SEWAGE PUMP AND REPAIR/REPLACEMENT OF SUBMERSIBLE PUMP AND CONNECTED ACCESORRIES AT K AREA UNDER GE CHANDIGARH
REPAIR/REPLACEMENT OF SUBMERSIBLE PUMP ALONGWITH CONNECTING ACCESSORIES INCLUDING REPAIR /MAINT OF OPERATING OF SEWAGE TREATMENT PLANT, SEWAGE MOTORS AND CLEANING TO SEWAGE SUMPS AT K AREA UNDER GE CHANDIGARH.
Rehabilitation Upgradation of Existing Sewage Treatment Plant On Design, Build and Operate Basis, 1 Year DLP Plus 15 Years O and M, At Diggian, Sector 66, Chandigarh Under Smart City Project
Rehabilitation Upgradation of Existing Sewage Treatment Plant On Design, Build and Operate Basis, 1 Year DLP Plus 15 Years O and M, At Raipur Kalan and Raipur Khurd, Chandigarh Under Smart City Project
SITC of 3.5 MLD sewage treatment plant cum effluent treatment plant on SBR technology followed by UF system including sewer lines treated water distribution system, main pumping station (MPS), rising main at PGIMER, Chandigarh
Custom Bid for Services - Operation of Automatic Coach Washing plant with Effluent treatment plant including subassemblies at coaching depot Chandigarh for period of two years Similar Category Operation and Maintenance of Effluent/Sewage Treatment Plant...
OPERATION RUNNING AND PREVENTIVE MTC. OF 5 MLD SBR TECHNOLOGY CAPACITY SEWAGE TREATMENT PLANT AT INDUSTIRAL AREA PHASE III NEAR VILLAGE RAIPUR KALAN UT CHANDIGARH FOR THE PERIOD OF 16.04.2025 TO 15.09.2026 I.E. 05 MONTHS
OPERATION RUNNING AND PREVENTIVE MTC. OF 5 MLD SBR TECHNOLOGY CAPACITY SEWAGE TREATMENT PLANT AT INDUSTIRAL AREA, PHASE III, NEAR VILLAGE RAIPUR KALAN U.T. CHANDIGARH FOR THE PERIOD OF 01.10.2026 TO 31.03.2027 I.E. 06 MONTHS
Design, Construction, Installing, Testing, Commissioning and Handing Over of 85 KLD Effluent Treatment Plant Cum Sewage Treatment Plant based on SBR MBR Technology at Civil Hospital, Sector 45, Chandigarh. (Including 5 years of operation and comprehe
Rehabilitation Upgradation of Existing Sewage Treatment Plants Based On SBR Technology By Adding Additional Units On Design, Build and Operate Basis, 1 Year DLP Plus 15 Years O and M, At 3 BRD and Dhanas, Chandigarh Under Smart City Project
REPAIR AND MAINT OF CI/DI/GI DISTRIBUTION LINE, SLUICE VALVE, VALVE OF PIT CHAMBER INCLUDING REPAIR /MAINT OF OPERATING OF SEWAGE TREATMENT PLANT, SEWAGE MOTORS AND CLEANING TO SEWAGE SUMPS AT K AREA UNDER GE CHANDIGARH
Increasing stack height of 750 Kva DG set including making arrangement of M.S. platform to support the stack and for collecting the sample from sampling ports as per guidelines of CPCB inside Sewage Treatment Plant, Maloya, Chandigarh
COLLECTING AND CONDUCTING DESIGN PARAMETERS TEST OF SEWAGE SAMPLES FROM NABL ACCREDITED LAB FOR SEWAGE TREATMENT PLANT AT DIGGIAN RAIPUR KHURD 3BRD AND DHANAS UNDER MC PH-4 AS PER CPCB CPCC AND PPCB GUIDELINES . CH. TO REVENUE HEAD.
OPERATION AND MAINTENANCE OF SEWAGE TREATMENT PLANT DHANAS BASED ON SBR TECHNOLOGY INCLUDING UPKEEP OF MACHINERY INSTRUMENTATION PLC SENSORS ETC AND ALSO INCLUDING ALL SORTS OF DATA CABLES CONTROL AND COST OF UPKEEP OF LIVE WARE SOFTWARE AND HARDWARE
Design, Built and Operation of 2 MLD Sewage Treatment Plant Using MBR Technology to fill Sukhna Lake Near Village Kishangarh, U.T., Chandigarh including operation and maintenance of 10 years (after six months of trail run and one year defect liabilit
Design PITC and Handing Over of 65 KLD Effluent Treatment-Cum-Sewage Treatment Plant (Based on SBR/MBR Technology followed by Tertiary Treatment Comprising of DMF and ACF) at 50 Bedded Civil Hospital, Sec-22, Chd. (Including 5 years of operation and
CONSTRUCTION OF PARKING AND ROAD MRF GARBAGE TRANSFER STATION INSIDE SEWAGE TREATMENT PLANT 3BRD INDUSTRIAL PHASE-II CHANDIGARH. SUB HEAD Providing and Laying of 450 mm 18 INCH ID and 300 mm 12 INCH ID RCC Pipe for the smooth flow of SWD System.
MAINTENANCE and OPERATION OF ELECTRICAL, WATER SUPPLY and HVAC, RO PLANTS, SEWAGE TREATMENT PLANTAND DAY TO MAINTENANCE OF VARIOUS DRDO TRANSIT FACILITIES AT CHANDAN RANGE
Construction of chlorine contact tanks for reduction of F COLII at STP Dhanas and STP Raipur Khurd Chandigarh Ch to A Mtc of STP
COMTECH Cat-6 STP for CCTV
CP Cat-6 STP for CCTV
Construction of STP
EMERGENT REPAIR OF ACB S AT 11KV SUB STATION AT STP DIGGIAN. CH. TO ANNUAL MTC. OF STP DIGGIAN.
CP-PLUS Cat-6 STP for CCTV
DIGILINK (SCHEINDER) Cat-6 STP for CCTV