Loading…
Loading…
596 results • Best match
MAINTENANCE OF PH PLANTS i WATER TREATMENT PLANT ii SEWAGE TREATMENT PLANT AT LCSD AND iii SEWAGE TREATMENT PLANT AT CISF QUARTERS FOR A PERIOD OF 12 MONTHS AT LPSC VALIAMALA
OPERATION AND COMPREHENSIVE MAINTENANCE OF WATER DISTRIBUTION SYSTEM (WDS) AND SEWAGE TREATMENT PLANT (STP) AT TECHNOPARK PHASE V IT BUILDING (SEZ).
Empanelment of Consultants for Assisting HITES in Design and Engineering of Sewage Treatment Plant STP for various projects executed by HITES
Chottanikkara Temple - Constructing collection pit for sewage treatment plant near Darsana Sudarsana block
COMPLETION OF INCOMPLETE WORKS OF SEWAGE TREATMENT PLANT AT SMA NAVEL BASE KOCHI
Operation and Maintenance of Sewage Treatment plant at JNIS,Kaloor for one year.
LAYING OF UG TELEPHONE CABLE TO SEWAGE TREATMENT PLANT AT LCSD, LPSC, VALIAMALA
Operation and Comprehensive maintenance of the Sewage Treatment Plant in the High Court Premises having the capacity of 190 cubic metre.
Non-Comprehensive annual maintenance contract and rate contract for spare parts for twin lobe air blowers at the sewage treatment plants(STP) at NITC
Civil works for the construction of sewage treatment plant of capacity 750 cum/day at Technopark Phase-III Campus, Trivandrum
Operation and Maintenance of sewage treatment plants in Infopark Kochi Phase I and Infopark Cherthala
Electrification of Sewage treatment plants at Nenmini quarters, Nenmini Auditorium and Thamarayur Quarters under Guruvayur Devaswom
Design, Supply, Installation, Commissioning and Operation for Sewage Treatment Plants at FACT (CD) Township, Ambalamedu, Kochi.
Supply Erection Commissioning Operation and Maintenance for ONE YEAR for the Sewage Treatment Plant STP of 25 KLD capacity for 44 dwelling unit LIFE Apartment at Punalur Kollam on TURNKEY BASIS
800KLD SEWAGE TREATMENT PLANT AND SEWERAGE NET WORK AT SUNDARAM COLONY AT PALAKKAD MUNICIPALITY
Annual Maintenance Contract for Operation and Maintenance of Sewage Treatment Plant at NITC Campus
MAINTENANCE OF FILTER DRYING BED IN SEWAGE TREATMENT PLANT AT CISF QUARTERS AREA VALIAMALA
Repair Works to 100 KLD Sewage Treatment Plant installed at C.G.O Complex, Poonkulam, Trivandrum
Providing power supply cables for sewage treatment plant at Lifemission project site at Mundamveli
CONSTRUCTION OF SEWAGE TREATMENT PLANT OF CAPACITY 200 KLD AT CISF AREA LPSC VALIAMALA
CONSTRUCTION OF SEWAGE TREATMENT PLANT OF CAPACITY 350 KLD AT LCSD AREA LPSC VALIAMALA
Comprehensive Operation and Maintenance of 400 KLD Sewage Treatment Plant with all connected equipments
A waterbody thodu is running through the sides of the sewage treatment plant site. Currently no retaining wall is present for protecting the thodu side from the sewage treatment plant and also for protecting the earth on the sides which is at a leve
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; OEM, OEM Authorised Service Provider (ASP); Under AMC and functional
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; OEM, OEM Authorised Service Provider (ASP); Under AMC and functional
Custom Bid for Services - CONTRACT FOR OPERATION AND MAINTENANCE OF SEWAGE TREATMENT PLANT LOCATED INSIDE PETCHEM OF BPCL KR FOR A PERIOD OF THREE YEARS Similar Category Operation and Maintenance of Effluent/Sewage Treatment Plant
ROOFING FOR SLUDGE DRYING BED OF SEWAGE TREATMENT PLANT AT CISF HOUSING COLONY, LPSC VALIAMALA
OPERATION OF SEWAGE TREATMENT PLANT FOR THEJASWINI AND NILA BUILDING, TECHNOPARK PHASE 1 CAMPUS, TRIVANDRUM
MAINTENANCE OF VARIOUS TANKS OF OLD SEWAGE TREATMENT PLANT IN LCSD AREA AT LPSC, VALIAMALA
Operation and annual maintenance of sewage treatment plant at JNI stadium,Kaloor for one year
MAINTENANCE OF FILTER DRYING BED IN SEWAGE TREATMENT PLANT AT CISF QUARTERS AREA LPSC VALIAMALA
Biennial Operation and Maintenance of Sewage Treatment plant at L Block Employees Quarters at Cheriyakadavanthra
CONSTRUCTION OF SEWAGE TREATMENT PLANT OF 200 KLD CAPACITY AT CISF QUARTERS AREA, LPSC, VALIAMALA
MAINTENANCE OF FILTER DRYING BED IN SEWAGE TREATMENT PLANT AT CISF QUARTERS AREA LPSC VALIAMALA
Supply Installation Testing and Commissioning of Mobile Faecal Sludge Treatment Plant Mobile FSTP
Annual Plan 36/2023-24 FAECAL SLUDGE TREATMENT PLANT FSTP in Karunagappally Muncipality
Civil works for the construction of 250 kLD Sewage Treatment Plant
Operation and Maintenance of Effluent/Sewage Treatment Plant - ARM of External water supply Sub Head Sewage treatment plant for the year 2025 26 at 27 BN ITBP Nooranad Kerala; any; Functional but outside AMC and Warranty
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; OEM, OEM Authorised Service Provider (ASP); Functional but outside AMC and Warranty
Supply and laying of sewerage Network of 250 KLD Sewage treatment Plant at KIITP, Kanjikode, Palaghat
SMP Sabarimala Operation and maintenance of Sewage Treatment Plant Maintenance to the Sewer network and manholes
Retender-Electro Mechanical works for 35KLD Sewage Treatment Plant at Thottada Samajwady colony in Kannur Corporation
OPERATION CONTRACT OF SEWAGE TREATMENT PLANT FOR THEJASWINI AND NILA BUILDING, TECHNOPARK PHASE 1 CAMPUS, TRIVANDRUM
ELECTRICAL WORKS FOR SEWAGE TREATMENT PLANT OF 200 KLD CAPACITY AT CISF QUARTERS AREA, LPSC, VALIAMALA
Repair and maintenance works of 100 KLD Sewage Treatment Plant installed in ESIC MH, Asramam, Kollam.
Supply and Installation of 50 KLD Sewage Treatment Plant at Girls hostel of G.V Raja Sports School, Thiruvananthapuram- Phase 1 Supply of 50 KLD STP - Retender
Re arrange the panel boards in the sewage treatment plant MCH KTM
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; AICMC & Operation of 400KLD Main STP near Airport school and STP near CISF Barrack at Calicut Airport; Under AMC and functional
OPERATION AND COMPREHENSIVE MAINTENANCE CONTRACT OF WATER DISTRIBUTION SYSTEM AND SEWAGE TREATMENT PLANTS AT TECHNOPARK PHASE III CAMPUS, TRIVANDRUM
AMRUT 2015-16 Rejuvenation of Elamkulam Sewage Treatment Plant at Kochi Design construction and commissioning of 5 mld capacity STP based on MBBR technology inclusive of all mechanical and electrical components followed by O and M for 5 years