Loading…
Loading…
3,892 results • Best match
Electrification work of Kumar Mohlla Lillum under CDF Handwara by way of HT/LT improvement and Creation of 100 kVA Substation.
Supply, Installation, Testing, Commissioning of 04 Nos.100KVA, 11/0.415KV distribution substations along with HT/LT lines, Isolation Points and Prodigy Meter at various location of WSS Jal Shakti ( PHE) Department on Turnkey Basis
Rate contract for creation of 250 KVA, 400 KVA and 630 KVA Distribution Substations at different locations within the jurisdiction of Electric Division-II Jammu on turnkey basis during the Financial Year 2024-25
Contract for the Supply, installation, testing and commissioning of various Line materials as well as distribution substations under Back to village program phase 2nd for Block BK Pora (Part-1) of ED Budgam, KPDCL.
Rate contract for creation of 250 KVA, 400 KVA and 630 KVA Distribution Substations at different locations within the jurisdiction of Electric Division-II Jammu on turnkey basis during the Financial Year 2025-26.
Contract for the Supply, installation, testing and commissioning of various Line materials as well as distribution substations under Back to village program phase 2nd for Block BK Pora (Part-2) of ED Budgam, KPDCL.
Rate contract for creation of 25 KVA, 63 KVA, 100 KVA and 250 KVA Substations at different locations within the jurisdiction of Electric Division-II Jammu on turnkey basis during the FY 2022-23
Creation of Substations alongwith Laying of HT/LT Network and Augumentation of Sub satations at various locations in Mandali Block demanded in the Memorandum from Mrs. Reeta Devi, Mandali (BDC Chairperson) on Turnkey Basis.
Rate contract for creation of 250 KVA, 400 KVA and 630 KVA Distribution Substations at different locations within the jurisdiction of Electric Division-II Jammu on turnkey basis during the Financial Year 2026-27
SITC of Electrical Infrastructure which includes Shifting/Creation of HT/LT Lines,11 KV Isolation Points, Shifting/Creation of Distribution Substations from High Risk Disaster Zone to Geographically stable areas under ED-Reasi(SASCI)
SITC of Permanent Restoration of damaged Infrastructure due to heavy rainfall/Flash Flood which includes Shifting/Creation of HT/LT Lines,11 KV Isolation Points, Shifting/Creation of Distribution Substations under ED Reasi ( SASCI)
Improvement of HT/LT network including Augmentation/creation of 100 kVA substation at village Tantary Mohlla Kalmoona under BADP Handwara under jurisdiction of ED Handwara
Upgradation of substations at different locations
Creation of Substation along with HT/LT Line for PHE installation
creation of 250 KVA Substation along with its Ht/LT network near KS Steel inside Industrial Estate Zakura within the jurisdiction of Sub-Division Zakura Srinagar.
Improvement of HT/LT network including Augmentation / creation of 100 kVA substation at village Check Mohlla Bonpora Ahgham under CDF Handwara under jurisdiction of ED Handwara
creation of 63 KVA Substation alongwith 11 KV line for PHC Tikri under District Capex Health Sector
Stage contract for Carrying out various electrical maintenance works including SITC, ITC of various Line materials and Distribution Substations and dismantling of existing deteriorated out lived electrical infrastructure for the year 2025-26 under th
Rate contract for creation of 100KVA Substations at different locations within jurisdiction of Electric Division-II Jammu during the FY 2022-23 (Key material like Poles and Distribution Transformer shall be provided by the Department)
SITC of 63 KVA Distribution substations along with laying of HTLT line at Chak Nazir Jerda, Trindian, Bandral, Mahal Shah and Nanga of Ramgarh Block under JJM WSS within jurisdiction of Executive Engineer ED Vijaypur
Providing of Manpower for Operation , Round the Clock Patrolling and emergency repairs of 11KV/0.415KV Distribution Substations of various capacities along with HTand LT network for field Subdivisions of Electric Division-II Gandhi Nagar Jammu.
Supply Erection Testing commission for creation of 3x63kva Substations along with HTLT network at Mirpurabass Kandiwagan chareel and Peer Pora Takia duly recommended bt DDC Rabia Beg under jurisdiction of ED Batote on turnkey basis
Creations of SubStations along with HT LT Network at Kenyl Tarthpora of Block Tarthpora under Jurisdiction of Sub Division Handwara of Electric Division Handwara under PRI grants of District Capex Budget of FY 2022 23
Providing installation testing and Commissioning of 11/0.33KV SUBSTATIONS, HT and LT Network at villages Grid Colony Gopalpora, Shahihamdan Colony Bulbulnogam, Pethdialgam Main and Ugian New Colony under Jurisdiction of Block ACHABAL of Electric Di
SITC FOR IMPROVEMENT OF LT NETWORK AT PANCHAYAT BATHERA OF BLOCK KALAKOTE, WARD NO. 5 BATHERA OF BLOCK KALAKOTE, WARD NO. 2 BATHERA OF BLOCK KALAKOTE AND 25 KVA SUB STATION ALONG WITH HT LT NETWORK AT WARD NO. 4 NEAR SCHOOL NAROTA PANHAR KALAKOTE.
Improvement of HT/LT Network including Augmentation / creation of 63 kVA substation at various places in Langate constituency under CDF/BADP Langate under jurisdiction of ED Handwara
Improvement of HT/LT Network including Augmentation / creation of 63 kVA substation at various places in Langate constituency under CDF/BADP Langate under jurisdiction of ED Handwara
Creation of 250 KVA Substation along with HT/LT Line for PHE installation
Augmentation of Distribution Substation from 250KVA to 400KVA at Indra Nagar (Sh. Mohinder Singh)on Turnkey Basis (Under Capex Budget 2022-23).
Additional works required as per site condition for completion of electric Substation at WSS Sarai Dangerpora Stage 1st and 2nd under JJM
Additional works required as per site condition for completion of electric substation at WSS Laman Chewa stage 1st and 2nd under JJM
Additional works required as per site condition for completion of electric substation at WSS Maidanpora Naidkhai Stage 1st and 2nd under JJM
Construction of 10 No 200 KVA(11/0.433KV) Substation for providing of power supply to transit accommodations for Kashmiri Migrants at Zewan.
laying of LT Network for the dispersal of power supply of 1x63 KVA already created Distribution Substation at Chidbaga on Bhagwah Feeder
Installation of dedicated essential feeder along with Creation of Electric Substation for WSS Regional Parihaspora (SITC of HT CT/PT Unit)-Retender
Electrical repair works to 7.5 hp submersible motor 63KVA Substation and 50 KVA Voltage stabilizer to be carried at WSS Niklora Chodrybagh.
Repairs to 100 KVA Distribution Transformer and installation of H Frame for the Substation at Ashtingoo Lift Irrigation Scheme of MISD Sopore.
Creation of 1x100 KVA 11/66.6KV Substation along with HT/LT network for Stabilization of Power system network at Ganai Mohallah, Khunmoh
SAIDI SAIFI System Implementation Agency for SITC of Hardware and Software for RTDAS at 33_11kV substation level in identified towns of JK
Provision of Power Supply connection for Creation of 63 KVA Substation for Rapid Sand Filtration Plant for WSS Rayil Gund at Rayil
Shifting of Power Grid/Augmentation of 100 KVA to 250 KVA Substation at Degree College Beerwah along with relocation from existing Position.
Creation of 100 KVA Substation at Khanday Mohallah Rehmat Colony Sangam falling under the Jurisdiction of ESD Nawakadal, ED-3rd (Turnkey Basis)
Supply Survey Erection Testing and Commissioning for creation of 25 KVA SUBSTATION AT NARI NIKETAN FOR SOCIAL WELFARE DEPARTMENT AT KANGA RAMBAN
CREATION OF 1X25 KVA DISTRIBUTION SUBSTATION ALONGWITH THE LAYING OF HT AND LT NETWORK AT KRANDI DHAR BLOCK KASTIGARH ON BHAGWAH FEEDER
Supply installation testing and commissioning of machinery along with other items and creation of 200KVA SubStation at Transformer Repairing Workshop Tikker Kupwara
CREATION OF 1X25 KVA SUBSTATION ALONG WITH HT/LT NETWORK AT MADARASAA DARAUL NALLI MANJAKOTE IN SUBDIVISION RAJOURI-I UNDER SSY SCHEME.
CREATION OF 1X63 KVA SUBSTATION ALONG WITH HT/LT NETWORK AT NEAR PHC HATHAL A IN SUBDIVISION SUNDERBANI UNDER UNITED GRANTS SCHEME.
Additional works required as per site condition for completion of electric substation at WSS Nowgam Gundpayeen Stage 1st and 2nd under JJM
Creation of 1x100 KVA 11/66.6KV Substation along with HT/LT network for Stabilization of Power system network at Astan Colony Khunmoh
Additional works required as per site condition for completion of electric substation at WSS Chandergeer Pehlipora Stage 1st and 2nd under JJM