Loading…
Loading…
15,080 results • Best match
Centrifufing of 132/33 KV 40 MVA Transformer II (BBL MAKE Repaired by M/s Abirami Engineering Works)
Centrifuging of old T/F oil of various Transformer installed at various S/S under ETD-III , Agra
Repairing of 25 63 and 100 KVA damaged Transformer at Shade No 1Mau workshop Mau under EWD Azamgarh
For providing of Mahindra pick up/max 1000 /Tata 407 in show room condition along with driver and 02 number laborers for carriage of damaged/repaired/new distribution transformers in RAPDRP Town- Kairana and IPDS Town- Jhinjhana under EDD-4, Shamli
Supply of 3 Phase 4 Wire LT CT Trivector Meter for 25 KVA and 63 KVA Transformers under RGGVY 12th plan against District Kannauj and Mainpuri
SUPPLY INSTALLATION AND COMMISSIONING OF TRANSFORMER MONITORING CUM TAP CHANGER SYSTEM AS PER ATTACHED ANNEXURE
Installation of New Transformer and other work (Business Plan 2026-27, Under EDD, Sagari Azamgarh
Fixing of Transformer and Electrification in the Scheme of Full Deposit under EDD-I Azamgarh
PROVIDING GPS ENABLED VEHICLE FOR REPLACEMENT OF DAMAGED TRANSFORMERS IN WHOLE AREA OF T/F REPAIR WORKSHOP AKBARPUR DISTRICT AMBEDKAR NAGAR.
Conversion of Overhead power lines to under ground and Transformers In ROW of Area around Siddha manokamnapurti shiv temple Bahadurganj Prayagraj
Supply of Super Enameled Aluminum winding wire (Grade-2) of Various sizes for repairing of 63 KVA and above capacity transformers.
Installation of L.T. Protection Unit on different capacity of Distribution Transformers in the area of E.U.D.D.-Rajajipuram, LESA CIS Gomti, Lucknow
Routine Annual Oil Testing of different Power Transformers and Bus Reactor at 400KV Substation Bareilly under Electy. 400KV Substation Division, Bareilly
Providing 01 No. Commercial Vehical Along with Driver and 2 No. Labour for Carriage of Damage Transformers under EDD-2-Baghpat
Replacement of damaged Distribution Transformers in Urban area of E.D.S.D.-I AND II Shuklaganj and Magarwara under the E.D.D.-II, Unnao
Replacement of Damaged Distribution Transformers in Urban area of E.D.S.D.-I AND II, Shuklaganj AND Magarwara under the E.D.D.-II, Unnao
Work of capacity increase and installation of transformers under Business Plan Year 2024-25 Phase-1 under Electricity Distribution Division Khalilabad.
For Replacement of Damaged Transformers 160 KVA to 1000 KVA along with other associated works at workshop Etawah under EWD, Kanpur
Installation of L.T. Protection Unit on different capacity of Distribution Transformers in the area of E.U.D.D.-UPTRON, LESA CIS Gomti, Lucknow.
Construction of additional 25 KVA AND 100 KVA double pole in case of overloading of distribution transformers installed at various sites
Replacement of damaged Distribution Transformers in Urban area of E.D.S.D.-I and II Shuklaganj and Magarwara under the E.D.D.-II, Unnao
Providing 01 No. Commercial Vehical Along with Driver and 2 No. Labour for Carriage of Damage Transformers under EDD-1-Baghpat
Construction work of 11/0.4KV distribution transformers under Business Plan 2024-25 under EDD-IInd, Sakaldiha. (on semi turn-key basis)
For Supply of 11 KV Resin Cast Current Transformers Suitable for Yamuna Power Make VCBs, Under Electricity Urban Distribution Circle, Meerut
Providing 01 No. Commercial Vehical Along with Driver and 2 No. Labour for Carriage of Damage Transformers under EDD-2-Baraut
WORK OF SEPARATE CHEMICAL EARTHING OF BODY AND NEUTRAL SIDE OF DISTRIBUTION TRANSFORMERS INSTALLED UNDER THE JURISDICTION OF EUDD-III, MORADABAD.
nstallation of L.T. Protection Unit on different capacity of Distribution Transformers in the area of E.U.D.D.-Aishbagh, LESA CIS Gomti, Lucknow.
Regarding the works related to connecting Delta earthing of transformers with main earthing at ETSD-I, Mohaddipur under ETD-I, Gorakhpur.
Construction of additional 25 KVA and 63 kva double pole in case of overloading of distribution transformers installed at various sites
WORK FOR REPAIRING OF PLINTH FOR 250/400 KVA TRANSFORMERS IN AREA OF EDSD-II RADHA NAGAR IN EDD-I FATEHPUR
Replacement of damaged Distribution Transformers in Urban area of E.D.S.D.-I AND II Shuklaganj and Magarwara under the E.D.D.-II, Unnao
Repairing with rewinding along with overhauling of 05 nos. transformers and 02 nos. motors during Monsoon 2023-24 in Kakari Project
Work of replacement of damaged transformers in the area of Electricity Urban Distribution Sub-Division-III, Muzaffarnagar under EUDD-III, Muzaffarnagar
WORK OF SEPARATE CHEMICAL EARTHING OF BODY AND NEUTRAL SIDE OF DISTRIBUTION TRANSFORMERS INSTALLED UNDER THE JURISDICTION OF EUDD-III, MORADABAD.
Work of replacement of damaged transformers in the area of Electricity Urban Distribution Sub-Division-IV and Sub Division-V, Muzaffarnagar
After increasing the capacity of distribution transformers, the work of replacing worn out ABC conductors and increasing their capacity EDD-KLD
For Supply of 11 KV Resin Cast Current Transformers Suitable for Crompton Greaves Make VCBs, Under Electricity Urban Distribution Circle, Meerut.
WORK FOR REPAIRING OF PLINTH FOR 250/400 KVA TRANSFORMERS IN AREA OF EDSD-II RADHA NAGAR IN EDD-I FATEHPUR
For Maintenance of Different Capacity 630/400/250 KVA Transformers in the area of EUDSD-RLG, Mrt. Under EUDD-V, Meerut.
Work of replacement of damaged transformers in the area of Electricity Urban Distribution Sub-Division-II, Muzaffarnagar under EUDD-III, Muzaffarnagar
Work to prevent oil leakage of power transformers installed at various 33/11 KV Distribution substations under Electricity Distribution Division, Modinagar.
Work for installation of wire mess fencing for protection of 250/400 Kva transformers installed under jurisdiction of EDD-I Fatehpur
REPAIR/RENEWAL/MAINTENANCE OF 11 KV SYSTEM, HT OVERHEAD LINES DEHYDRATION OF 11KV/0.433KV TRANSFORMERS AND CONNECTED WORKS AT BABINA CANTT
Supply of Super Enameled Aluminum winding wire (Grade-2) of Various sizes for Repairing of 63 KVA and above capacity transformers
Construction work of 11/0.4KV distribution transformers under Business Plan 2024-25 under EDD-IIIrd, Sakaldiha. (on semi turn-key basis)
Work of Loading-carriage-unloading of damaged distribution Transformers from Electrical system in the area of EE, EUDD Chinhat, LESA, Lucknow
work of Loading-carriage-unloading of damaged distribution transformers from Electrical system in the area of EE, EUDD, Gomtinagar, LESA, Lucknow
Shifting of Electric lines and Transformers with LED Lighting from Shantipuram sector A Phaphamau side to Bela Kachhar cotect road Prayagraj
WORK OF ANNUAL MAINTAINANCE OF EMULSIFIER SYSTEM INSTALLED ON VARIOUS TRANSFORMERS AT 220 KV SUBSTATION RAMPUR UNDER ELECTRICITY TRANSMISSION DIVISION RAMPUR
Replacement of damaged Distribution Transformers in Urban area of E.D.S.D.-I and II Shuklaganj and Magarwara under the E.D.D.-II, Unnao