Loading…
Loading…
1,169 results • Best match
Creation of Substation along with LT Line
FIXING OF RATE CONTRACT FOR EXECUTION OF LT LINE WORKS ON TURNKEY BASIS WITHIN THE JURISDICTION OF ELECTRIC DIVISION VIJAYPUR, JPDCL JAMMU
Supply , Erection, Testing and Commissioning of Distribution Substations along with HT/LT lines for irrigation purposes under Saubhagya Excellency award with in the jurisdiction of Electric Division Vijaypur JPDCL Jammu
Creation of HT and LT line along with Substation.
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Qasba under DC-Work 2023-24
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Thanpeer under DC-Work 2023-24
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Islamabad under DC-Work 2023-24
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Barur under DC-Work 2023-24
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Banpat under DC-Work 2023-24
Creation of 25 KVA S/Stn. alongwith HT/LT line at Vetnary Asstt. Surgeon office Seikloo Mandi
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Pharswal under DC-Work 2023-24
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Uripura under DC-Work 2023-24
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Guntrian under DC-Work 2023-24
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Shahpur under DC-Work 2023-24
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Doba under DC-Work 2023-24
Installation and Creation of 63 KVA Substation including HT/LT line for Water Supply Scheme Haripora Bonizal.
Creation of 100 KVA S/Stn. alongwith HT/LT Line at Noona Bandi School under WSS Scheme
Creation of 1x630 KVA Sub Stations along with HT LT LINE for JJM WSS Shiva Sharerna Lif
Extension of LT line to Hi-Tech Poly Green House at FVSc and AH Shuhama, SKUAST-Kashmir
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Sankh under DC-Work 2023-24
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Bandichechian under DC-Work 2023-24
SITC of 100 KVA Substation with LT line and Allied works at MCRS Sagam SKUAST-Kashmir.(NABARD)
Creation of 3X250 and 5X100 KVA S/Stn. alongwith HT/LT Line at Kalai under WSS PHE
Erection of Tapping point and LT line
Rectification of tower foundations, Protection walls and stub legs at various sites of 220kV D/c Alusteng-Mirbazar Transmission Line (ZAMTL Sec-II) in Pulwama, Zawoora and Zabarwan areas.
Construction of Protection works around tower foundation No.76 C of 220kV D/c Zainakote-Alusteng Transmission Line located at Rabitar Gund Roshan (Ganderbal)
Custom Bid for Services - Routine Repair Maintenance and Patrolling of 132KV UdhampurKishtwar SC Transmission Line of DPS Kishtwar for a period of One Year
Erection of HT and LT Line
Creation of 250 KVA Sub Stn along with HT line
Creation of 63 KVA SS alongwith HT/LT Line, Creation of 25 KVA SS alongwith HT/LT line
Make shift arrangement for testing of WSS Migrant Colony Zewan on 6.6 KV HT line Of Sub Division Peripheral.
Creation of 250Kva Substation, HT line, LT Network, Solar Street lights and Highmast lights at Transit Accommodation Chowgam Qazigund
Laying of LT line ST and PCC poles of 2 PHASE 3 WIRE, Erection of LT Extension at Chalni, Temple Aithem, Challani, Tute-Di-khui, Pargalta, Peacock Colony Bajalata, Laying of LT Line of village Dwara, Ragoora and Lower Ragoora Jammu
1. EXTENSION OF LT LINE AT BREVI/SOLKI W NO. 7 2. 1 x 25 kVA S/STN FOR SIARI DALLI B 3. EXTENSION OF LT LINE AT POTHA PANHAR 4. IMPROVEMENT AT W NO 1,2, AND 7 VILLAGE PANJAH
Erection of HT/LT Line with 25 KVA Substation
Creation of substation along with HT and LT Line
Replacement of overhead 11KV Trunk line Nishat Feeder 1 Feeder 3 tap lines and LT Lines by Underground cabling system in front of Nishat Garden
Erection of LT Line Network for Shifting of Electrical Utilities coming under widening of Road at Phinter to Billawar falling under the jurisdiction of O and M Division, Kathua(JPDCL) on Turnkey Basis
ANNUAL STAGE CONTRACT FOR CARRYING OUT PREVENTIVE ROUTINE BREAKDOWN MAINTENANCE OF VARIOUS 132 BY 33 KV GRID SUBSTATIONS AND ALLIED 132 KV TRANSMISSION LINES FALLING UNDER THE JURISDICTION OF TLMD III AMARGARH
Routine Periodical Maintenance including Breakdown Maintenance of Various 220/132kV and 132/33kV Grid Sub Stations and EHV Transmission Lines of TLMD-8 Srinagar falling in District Srinagar, Ganderbal Pulwama and Anantnag.
ANNUAL STAGE CONTRACT FOR CARRYING OUT PREVENTIVE ROUTINE BREAKDOWN MAINTENANCE OF VARIOUS 132 BY 33 KV GRID SUBSTATIONS AND ALLIED 132 KV TRANSMISSION LINES FALLING UNDER THE JURISDICTION OF TLMD III AMARGARH
Erection of 3 Nos 6m monopoles at Village Mandli, Billawar Dist Kathua JK
Shifting of 11 KV HT Line along with Transformer in AOR of BOP Chak Dulma with in the jurisdiction of Electric Division Vijaypur JPDCL, Jammu
Creation of substation along with HT and LT line
Rate contract for Conversion of LT line from Single Phase to two Phase two phase to three phase and Single Phase to three Phase by way of Supply Erection Testing and Commissioning same on existing Poles with Weasel Rabbit Conductor on Turn Key
Erection of HT and LT line with creation of substations
erection of HT, LT Line with substations
Supply, Installation, testing, Commissioning 100 KVA Distribution Sub Station along with allied HT/LT lines at Dhora at Panchayat Mananu under Model Village Shah Balode BADP
Erection of HT and LT line with creation of 25KVA Substation
Creation of Substation along with HT and LT Line