Loading…
Loading…
4,486 results • Best match
Business Plan 24-25 (Part-2) Under the scheme, work related to protection of distribution transformers, construction of HT line, work of strengthening of lines, VCB related work and other works.
SUPPLY OF of 11 KV End Termination Heat Shrinkable Kit, Fuse Wire, Aluminum Lugs of various Size, Insulators for HT Line and Crimping Tool and Vibration meter in PTPP, PARICHHA, JHANSI.
GUARDING OF LT AND HT LINE AND FANCING OF T/F AT VARIOUS PALACE KAWAD YATRA MARG IN AREA OF EDSD-III NAPURA AND EDSD-IV LALBAGH IN EDD-II LONI.
Shifting of HT Line and Double Pole due to proper alignment of Gangajal Pariyojna Pipe Line under Deposit Scheme at the area of E.D.S.D.- Baldev in jurisdiction of E.D.D.-Ist, Mathura
THE WORK OF DIVERSION AND HEIGHT RAISING OF 220 KV TANDA BARAHUA TRANSMISSION LINE BETWEEN LOCATION NO 243 to 250 DUE TO SAHJANWA DOHARIGHAT NEW RAIL LINE PROPOSED BY N E RAILWAY UNDER ELECTRICITY TRANSMISSION DIVISION II GORAKHPUR
Work of Repairing Replacement of Damaged portion of the conductor by fresh Conductor Mid Span Joint Repair Sleeve of 220 KV Chinhat Gomti Nagar Ckt and 220 KV Sarojininagar Gomti Nagar Ckt Transmission Line Under ETD II Lucknow
Construction of Tube Well, Pumping Plant, Voltage Stabilizer and Power Connection with Transmission line, O H T, Pump House, Staff Quarter, Boundary Wall and its appurtenant Work. Supply of Pipe for rising main and Distribution System. Laying, Jointi
Substation package SS 72 Ext works of 400 kV Aligarh GIS under Construction of 400 kV D/C Khurja STPP - Aligarh (PG) Transmission Line and associated Bays at Aligarh Substation (GIS) under Consultancy Services to THDC India Ltd.
Work of shifting LT and HT lines and poles from Mulayam Nagar Tiraha to Kishori Lal Chauraha as per request of Executive Engineer-1 Lok Nirman Vibhag, Lucknow in the area of EUDD, Munshipulia LTG Lko under the head of Deposit Work 2022
ERECTION of 11 KV HT Lines and double poles for bifurcation of 11 KV Industrial (Bhooragarh) Feeder under Business Plan Year 2015-16 at EDSD, Pili Kothi, Banda under EUDD, BANDA as per passed package no. 1008/B.Plan/MDAgra/B-1/2015-16
Proposed work for Maintenance and Replacement of Damaged 11KV/LT Line at various Village emanating from 33/11 KV S/s Rahimpur in the jurisdiction of E.D.D.-Ist, Mathura
CONSTRUCTION HT/LT LINE 11 KV LINE FROM 33/11 KV ITI SUB STATION TO VILLAGE BARKHAPUR UNDER ELECTRICITY DISTRIBUTION DIVISION RAEBARELI. SEMI TURN KEY BASIS IN DEPOSIT SCHEME.
The Work of Construction HT/LT Line and Double Pole and Other Work at Various Places Under EDSD-Farah In Deposit Scheme at the area of E.D.D.-Mathura Rural
For making new feeder and construction of 11 KV and LT Line for Jhalas from the region of Azampur Barkhera to Firsha under Bilsanda SS Pilibhit under EDD Bisalpur.
Maintenance and repairing work of 11 KV LT Line and replacement of damage 33 KV and 11 KV Joinding kits in the area of EDSD Chuttmalpur under EDD Behat
The work of Construction HT/LT Line and Double Pole and other work for releasing new connection at various places under Deposit Scheme in jurisdiction of E.D.D.-Ist, Mathura
REPAIR /MAINT OF LT SUPPLY/ DISTRIBUTION SYSTEM OF LT LINE AND ALLIED WORKS OF EXTERNAL ELECTRIFICATION, DG SET IN PTS NEW AND OLD CAMP SARSAWA UNDER GE AF SARSAWA
Proposed work for Maintenance of Damaged 33KV/11KV/LT Line due to (Theft and M and R Work) at various place in the jurisdiction of E.D.D.-IV, Goverdhan, Mathura
Construction of 11/0.4 KV substation, capacity enhancement, line construction, replacement of worn out wires, cable poles, replacement of wires, guarding, HT and LT line construction, system improvement work.
Proposed work for Maintenance and Replacement of Damaged 11KV/LT Line at various Village emanating from various 33/11 KV Sub-Stations in the jurisdiction of E.D.D.-Ist, Mathura
The Work of Construction HT/LT Line and Double Pole and Other Work at Various Places Under EDSD-Aurangabad In Deposit Scheme at the area of E.D.D.-Gramin, Mathura
The Work of Construction HT/LT Line and Double Pole and Other Work at Various Places Under EDSD-Kosi In Deposit Scheme at the area of E.D.D.- Kosikalan, Mathura
The Construction and Shifting of HT LT Line and installation Energisation of TF for given new connection Under Deposit Scheme 2025-26 in the Juridiction of EE EDD Bhadohi
Proposed work for Maintenance of Damaged 33KV/11KV/LT Line due to (Daviya Aapda, Brunt Cable and Theft etc.) at various place in the jurisdiction of E.D.D.-Ist, Mathura
For construction of 11 KV and LT line for Jhalas from the region of Kurraiya to Sheetalpur via Marori from Gahaunia feeder at Bilsanda SS Pilibhit under EDD-Bisalpur
The work of Construction HT/LT Line and Double Pole and other work for releasing new connection at various places under Deposit Scheme in jurisdiction of E.D.D.-Ist, Mathura
WORK FOR CONSTRUCTION OF NEW 11 KV LT LINE SS FOR RELEASING CONNECTION UNDER FULL DEPOSITE SCHEAME IN THE AREA OF EDSD PURWA AND MAURWAN UNDER EDD PURWA UNNAO
Replacement of damaged ST Pole 11 Mtr. long/ 9 Mtr. long and PCC Pole 8.5 Mtr. long installed at 11 KV Line and LT line Meerut as Running Work
Construction of HT/LT Line or other associate work in Sansad Nidhi Vidhayak Nidhi and deferent deposit scheme in sub division Jethwara and Kunda under EDD-II Kunda, Pratapgarh
Maintenance of 11 KV Jugour Feeder emanating from 33/11 KV S/S Chinhut works include Resagging of Loose Ht/Lt Line Cutting and Chopping of Tree branches etc.
Maintenance of 11 KV Takrohi Feeder emanating from 33/11 KV S/S Chinhut works include Resagging of Loose Ht/Lt Line Cutting and Chopping of Tree branches etc.
THE WORK OF REPAIRING AND MAINTENANCE OF 11 KV AND LT LINE EMANTING FRON 33/11 KV S/S MEHRIPUR IN THE JURISDICTION OF ELECTRICITY DISTRIBUTION DIVISION-TANDA (AMBEDKARNAGAR)
Proposed work for Maintenance of Damaged 33KV/11KV/LT Line due to (Daviya Aapda, Brunt Cable and Theft etc.) at various place in the jurisdiction of E.D.D.-Mant, Mathura
construction of HT LT Line and Double Pole installation of various capacity TF under Business Plan at the area of E.D.S.D. Govindpur in jurisdiction of E.D.D.-IV, Goverdhan, Mathura
For Line Shifting of LT Line due to Construction of Overbridge at Lal Phatak fed from 33/11 KV S/s Kandharpur Under EDD-II, Bareilly(Full Deposite Scheme).
Construction/Errection of HT/LT Lines, LT Sub Stations alongwith Other Associated Electrical Works, as when required Consumer request in DEPOSIT SCHEME in the work area of 33/11 KV Sub Station, Integral University under the jurisdiction of EDD-BKT
Various type Electrical Maintenance Repairing and other associated work of HT LT Lines and Sub-Stations in the work area of 33 11 KV S S Puraniya Ahibaranpur and Goel Chauraha Under the Jurisdiction of EUDD Daliganj LESA Trans Gomti Lucknow
Construction Errection of HT LT Lines LT Sub Stations along with Other Associated Electrical Works as when required Consumers request in DEPOSIT SCHEME in the work area of, BKT Sub Division under the jurisdiction of EDD BKT LESA Trans Gomti. Luckno
for Increasing capacity of existing LT S and HT/LT lines and other associated works., in BUSINESS PLAN 2022-23 under the work area of Sub-Division, New Campus and GPRA Under the jurisdiction of EDD-BKT, LESA, Trans Gomti. Lucknow.
Work of tree cutting binding LT spacers on loose conductors rectification of transformer leakage replacement of poles and conductors on various 11 KV and LT lines emanating from different 33 KV S/S in EDSD Jethwara under EDD II Kunda PBH
Construction/Errection of HT/LT Lines, LT Sub Stations along with Other Associated Electrical Works, as when required Consumer request in DEPOSIT SCHEME in the work area of 33/11 KV Sub Station, PURANIYA under the jurisdiction of EUDD-Daliganj
Construction Errection of HT LT Lines LT Sub Stations along with Other Associated Electrical Works as when required Consumers request in DEPOSIT SCHEME in the work area of ITAUNJA Sub Division under the jurisdiction of EDD BKT LESA Trans Gomti
Construction/Errection of HT/LT Lines, LT Sub Stations alongwith Other Associated Electrical Works, as when required against Consumer request in DEPOSIT SCHEME to be executed Primarily work area GPRA Sub Division of 33/11 KV Sub Stations, GPRA Und
Construction Errection of HT LT Lines LT Sub Stations alongwith Other Associated Electrical Works as when required Consumers request in DEPOSIT SCHEME in the work area of 33 11 KV Sub Station Integral University under the jurisdiction of EDD BKT LESA
Work of tree cutting binding LT spacers on loose conductors rectification of transformer leakage replacement of poles and conductors on various 11 KV and LT lines emanating from different 33 KV S/S in EDSD Town under EDD I PBH
Work of tree cutting binding LT spacers on loose conductors rectification of transformer leakage replacement of poles and conductors on various 11 KV and LT lines emanating from different 33 KV S/S in EDSD Raniganj under EDD Raniganj PBH
Construction Errection of HT LT Lines LT Sub Stations along with Other Associated Electrical Works, as when Consumers request in DEPOSIT SCHEME to be Primarily executed in the work area of 33 11 KV Sub Station, Integral University and Sharsti
Construction Errection of HT LT Lines LT Sub Stations alongwith Other Associated Electrical Works as when Consumers request in DEPOSIT SCHEME to be Primarily executed in the work area of 33 11 KV Sub Station, Engineering Collage SecI and Sec6
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation, Work of special maintenance and repairing of 33 KV, 11 KV and LT Lines damaged due to heavy storm at 33/11 KV Sub-Station, ..
Work of treecutting bindingLT spacers on loose conductors rectification of transformer leakage replacement of deteriorate HT LT bushing rods poles and conductors on various 11 KV and LT lines emanating from different S/S of EDSDKunda under EDD II PBH