Loading…
Loading…
298 results • Best match
Drawl of 33KV XLPE 3CX400SMM Cable for 33KV DC HT line from Minakhan132KV to Jibantala 33/11KV substation under Canning Division..
REPLACEMENT OF EXISTING ACSR PANTHER CONDUCTOR BY HTLS CONDUCTOR I.R.O. DIFFERENT 132 KV TRANSMISSION LINE OF DPL SYSTEM UNDER WBSETCL AND ALLIED WORK ON TURN KEY BASIS.
Maintenance of LT and HT line at Island areas under sarberia and minakhan CCC under Bhangar Division for contract period of 1year
11 KV HT LINE TESTER, EPOXY RESIN CAST TYPE CURRENT TRANSFORMER, INSULATOR, BSHNG, 11KV, PRCLN, SIDE MOVING INSULATOR, KIT CONTACT, ML10, SAPRE
DIVERSION OF KOLAGHAT-RAMCO CEMENTS 132 KV S/C TRANSMISSION LINE WITHIN THE PREMISES OF M/S THE RAMCO CEMENTS LIMITED AND ALLIED WORKS ON TURN KEY BASIS
Line diversion work related to 132 KV D/C Raiganj-Dalkhola transmission line for proposed 4 laning of NH-34 by NHAI at two locations of Karandighi Bypass
ROUND THE CLOCK MAINTENANCE OF HT LT LINES, COMMUNICATION SYSTEM AND OTHER ELECTRICAL INSTALLATIONS IN BUILDINGS, QUARTERS, ESTABLISHMENTS OUTSIDE POWER HOUSE UNDER THE PROJECT AREA OF RAMMAM HYDEL PROJECT STG-II.
All as per BOQ
All as per BOQ
Survey,Planning, Design/Engineering, Supply ,Erection(Laying), Testing and commissioning of OPGW by replacing Existing Earth wire(Live - Line Installation ) on various EHV Power Transmission Line 1809 Km Of WBSETCL.
Laying of 33KV 3X400SQMM XLPE UG CABLE for 33KV HT line from Gosaba 33/11KV Substation to new Mollakhali 33/11KV substation under Canning division.
Drawl of 33KV XLPE CABLE 3X400SQMM UG cable for 33KV HT line from Dighirpar 33/11KV Substation to new Herobhanga 33/11KV substation under Canning division
Shifting and Diversion of 33 KV, 11 KV and LT lines by means of UG Cable laying work for construction of metro corridor from Birati More to B T Collage More, under Bidhannagar Division-II, WBSEDCL
All as per BOQ
Painting on different structures (Temporary Sub-Station, Permanent Sub-Station, Permanent HT and LT lines) at various locations along the Main road from Rudranagar Customer Care Centre, WBSEDCL to Kachuberia Ghat in Sagar Island under Rudranagar CCC
System improvement work by drawl of HT LT line with installation of RMU DTR LT Kiosk, FPB, DB etc at CD block AA- I under Newtown Division
System improvement work by drawl of HT LT line with installation of RMU DTR LT Kiosk FPB DB etc at CC block AA I under Newtown Division
DIVERSION OF 132 KV D/C RISHRA - LILUAH TRANSMISSION LINE IN BETWEEN TL NO- 33 and 34 NEAR DANKUNI FOR PROPOSED SIX LANE EXTENSION OF DURGAPUR EXPRESSWAY BY NHAI AND ALLIED WORKS ON TURN KEY BASIS
Work Related to Painting on different structures (Temporary Sub-Station, Permanent Sub-Station, Permanent HT and LT lines) at various locations along the Main road from Rudranagar Customer Care Centre, WBSEDCL to Gangasagar Mela Ground in Sagar Isla
System improvement work by drawl of HT LT line with installation of RMU, DTR, LT Kiosk, FPB, DB etc at DA DB block AA- I under Newtown Division
System improvement work by drawl of HT LT line with installation of RMU DTR, LT Kiosk FPB, DB etc at DE DF block, AA- I under Newtown Division
Maintenance of 11 KV and LT Lines and its Installations, Air Conditioning equipment, Intercommunication system, O and M of Water supply system including water Pumps, Motors, Starters, Valves, O and M of DG Set at New Guest House etc
Supply of materials, survey, erection, testing, commissioning and drawl of new HT/LT lines, Installation of Sub-station DTR for erecting new service connection at Gopalpur LDTW (06 nos) under Kalna-I (A-I) Sub-Division under Dhatrigram CCC
Supply of materials, survey, erection, testing, commissioning and drawl of new HT/LT lines, Installation of Sub-station DTR for erecting new service connection at Nimo LDTW (05 nos) under Memari-I Block under Memari (A-I) Sub-Division under Mem
Supply of materials, survey, erection, testing, commissioning and drawl of new HT/LT lines, Installation of Sub-station DTR for erecting new service connection at Jubila LDTW (05 nos) under Burdwan (A-I) Sub-Division under Raina CCC under RIDF-
Supply of materials, Survey, Erection, Testing, Commissioning and drawl of new HT/LT lines, Installation of Sub-station DTR for erecting new service connection at Ghorsa LDTW (5 Nos) under Suri (A-I) Sub-Division under Murarai CCC under RIDF-XXI
Supply of Materials, Survey,Drawal of HT/LT lines, Erection of Sub-station and DTR(63 KVA),Testing and commissioning for effecting new service connection of Major River Lift Irrigation Scheme at Mouza Kalyanpur, JL No. 107 under Khoyrasole Block,Birb
Emergency repairing of Clear water transmission line of approx. 20Mtr. length 700 mm dia (ID) of the Pipe supporting portion near P. N. Das College, culvert for preventing disruption of water supply under North 24 Pgs. Surface based Arsenic Area Wate
Supply of Materials, Survey,Drawal of HT/LT lines, Erection of Sub-station and DTR(25 KVA),Testing and commissioning for effecting new service connection of Midi River Lift Irrigation Scheme at Mouza Perua Gopalpur ,JL No. 32 under Khoyrasole Block,B
AMC for regular maintenance of 3Ph LT line including LTOH line streetlights electric wiring and power supply to installations in establishments buildings inside the Township Complex of TCFHP at Phansidewa Distt Darjeeling
CONST. 1NO. 400KV TRANSFORMER BAY FOR 315MVA, 400/220/33KV AT DURGPAUR 400KV, 1NO. 220KV TRANSFORMER BAY FOR 315MVA, 400/220/33 KV TRANSFORMER AT DURGPAUR 220KV AND 220KV S/C TRANSMISSION LINE FROM DURGAPUR 400KV SUB-STN. ALLIED WORK TURN KEY
Supply of Materials, Survey,Drawal of HT/LT lines, Erection of Sub-station and DTR(63 KVA),Testing and commissioning for effecting new service connection of Major River Lift Irrigation Scheme at Mouza-Atla, JL No. 58,Plot No.-1452 under Rampurhat-I B
Construction of Transformer base for Installing Transformer and Cable Trench for HT LT Line at Kotshila Pump House Campus under Kotshila W/S Scheme under Purulia Sadar Sub-Division under Purulia Division,PHE DTE .
All as per BOQ
Erection of Sub-Station HT and LT line for effecting service connection of 6 nos LDTW at CHAITA SATYANARAYAN TUNG MADHUSUDHAN DHARA KALIKRISHNA TUNG KEDER PATRA 2003218501NIRANJON MAITY CHANDAN JANA under Mohanpur CCC under RIDF XXIV programme
Aug/Modernization of system by replacing 1-Ph DTR by 3 Phase (11KV/.433 KV) DTR along with drawl of required 3-Ph HT Lines and Conversion of 1-Ph LT OH Line to 3-Ph LT AB Cable Loss Reduction at Purulia Dist (PKG PS 10) of West Bengal Under RDSS
Aug of existing 33/11KV Sub-Stations and Aug /Modern. of system by replacing 1-Ph DTR by 3 Phase DTR along with drawl of required 3-Ph HT Lines and Conversion of 1-Ph LT OH Line To 3-Ph LT AB Cable at Paschim Medinipur (including Jhargram) Dist. PS 7
(1) MOEI & fans and RMO Pumping set i/c over head LT/HT line with day to day replacement of electrical spare material with electrical wiring, plug point etc. at IBG, Shibpur, Howrah. (2) RMO AC Plants (3 X 180 TR) at CNH Bldg at IBG, Shibpur, Howrah. (3) RMO Wet Riser System and Fire Alarm System in CNH Building at IBG, Shibpur, Howrah. (4) RMO 1 No. lift at CNH Bldg. in Shibpur, Howrah, during 2022-23. (SH: Day to day Operation & Maintenance of Electrical and Mechanical Installation in CNH and other IBG campus Building, Shibpur, Howrah)
Construction of underground cable trench for CESC(HT) line from main gate to new sub station building and allied works within the campus of CCL and State Drug Control Research Laboratory at 2, Convent Lane during the year 2025-26
SUPPLY,ERECTION OF COMPOSITE TOWERS WITH OVERHEAD STRINGING WITH SUPPLY,LAYING,TERMINATION OF 132KV POWER CABLE WITH ACCESSORIES AND ALLIED WORKS ON TURNKEY BASIS IRO RECONFIGURATION OF 132KV NETWORK AT DHULIAN 132KV SS TO ESTABLISH D/C CONNECTIVITY
Fixed Contact, Moving Contact Assembly, Brush, CRBN, 38 x 32 x 25 mm, GR MISE OF ASPL, Brush Holder for 50 KW 550V LT AC SLIPRIN, Fuse CRTRG, HRC, LNK, 100A, Isolator 300 AMPS ON OFF, 11kv Helmet-Mounted HT Line Tester
BEARING, N318, CYLDRICAL, SNGL, 90MM, TESTER, HT LINE, 11KV, RELAY CONTROL, CBCT OPERATED EARTH LEAKAGE, 0.5-8A, RELAY OVERLOAD, THERMAL, 16-25A, BREAKER CIRCUIT, MCCB, 400A, 415V, 4P, RELAY EARTH LEAKAGE, 0.5-2.5A, 220V, NUMERICAL IDMT REALY WITH 3 PHASE OVER C
All as per BOQ
FAIL SAFE RELAY, F SWITCH, TRANSFORMER, STATOR, CONTACTOR PWR, 15V IS SIGNALLING BELL, PLUG and SOCKET ASSY, ISOLATOR 300 AMPS ON OFF, AUDIO VISUAL ALARM AVA FOR HAULAGE, BRKR CRCT MCCB, 400A, TESTER HT LINE, 11KV, INSULATOR BSHNG, 11KV, PRCLN, MAT INSLTD RBR, 1M, 2M, 2.5MM 11KV
All as per BOQ
AUX CONTACT COIL VOLTAGE, TESTER HT LINE, 11KV, TESTER HND DRVN INSLTN, MEGGER, 500V, BRUSH HOLDER, BRUSH CRBN, 38X32X25MM, GR MISE OF ACPL, EPOXY RESIN CAST CURRENT TRANSFORMER, RELAY CNTRL, KIT CONTCT PAK 50US MAIN BLCK, PUSH SWITCH, FAIL SAFE RELAY, FIXED CONTACT, MOVING CONTACT ASSEMBLY, ISOLATOR 300 AMPS ON OFF, TESTER 10KPI, DGTL, MEGGER, 10KV, COPPER BUSBAR, SOCKET INSULATOR WITH PIN SET, EARTH LEAKAGE RELAY 12V AC
No load test and blocked rotor test on three phase induction motor, Speed torgue characteristics of three phase induction motor or brake test on 3 phase square cage induction motor, Speed control of three phase induction motor 1 Pole changing method ... of Transmission line using ... using transmission line simulator, ...
Custom Bid for Services - AMC FOR CATHODIC PROTECTION SYSTEM OF IBFPL Quote for SOR Line Item 10 MONTHLY TR UNIT MAINTENANCE AND MONITORING TO BE DONE 1 PIPELINE AND 1 VESSEL Monthly Potential Monitoring of Pipeline 5 point 2 km POTENTIAL MONITORI.., ... OF HT Line Protection ...