Loading…
Loading…
99,621 results • Latest
Estimate No. 60/WRD/2026-27 Providing Renovation to E.I. to VIP Suits at PWD Rest House at Wardha, District Wardha.
PERFORMANCE BASED MAINTENANCE CONTRACT ON ALL ROAD UNDER PWD SUB. DIVISION WAIDHAN DISTT- SINGRAULI (M.P.) TOTAL LENGTH 72.98 KM.
Sarai Mod to Dantasuti up to Distt. Border via Bad Jharoli Raneela Badila
A/R and M/O to Various Building under PWD NWB Division Office, Delhi during 2026-27. (SH- Construction of Porta Cabin Room, Shifting of Old Record from DTU to PWD North West Building Division, SU-Block, Pitampura, Delhi).
Rehabilitation of Various roads PWD Dn. Amet Package No. RJ-27- 04- 5054/NP/Amet/ 2026-27
Renovation work for Taluk Supply Office Electrification works General Electrical Work
CONSTRUCTION OF GEEDA TO DHAUHANI APPROACH ROAD LENGTH 4.88 KM. UNDER PWD SUB DIVISION DEOSAR , DISTT- SINGRAULI (M.P.)
Repair or replacement of existing concrete road by dismantling some damaged portion and providing drainage slab at Baburbag Campus of Burdwan Medical College.
Patch Grouting ReCarpeting with sand seal coat Pucca Drain and other allied works
RJ-28-07/ NP-ML/2026-27
Annual Repair Work Of Different Work Under Sub Division Narsinghpur Part 2
Wall paper, Blinds, UPVC window and other repairing work in 04 Nos. Honble Justice bungalow at MPHC in Pachpedhi under HQ section of HQ 3 sub division at Jabalpur.
RMO E, M Services installed at Trade , Tax Building ITO, Delhi-110002 (SH- SITC of precision type air conditioner in UPS room.)
Emergent external repair work of Brachytherapy treatment room of Radiotherapy building to arrest seepage water during heavy rainfall and internal renovation of Nursing Superintendent Office and other allied works within the main campus of BWN HSPTL.
CONSTRUCTION OF ADDITIONAL WORK OF BHAKTA NIWAS IN THE PREMISES OF SHRI. MAHALAXMI JAGDAMBA TIRTHSTHAN AT KORADI, TAH-KAMPTEE, DIST-NAGPUR.).
SH - Balance work for Construction of P.C.C. Breast wall at RD 13/920 to 13/932, Retaining wall at RD 14/030 to 14/038, 17/000 to 17/020, 17/030 to 17/040, 17/040 to 17/052, 17/068 to 17/090 and at RD 17/090 to 17/110 and P/L Metalling and Tarring
RJ-28-05/ NP-ML/2026-27
Annual Repair Work Of Different Work Under Sub Division Narsinghpur Part 1
Construction of Ramp with Shed for easy patient movement at the back side of Fluoroscope Machine Room of G plus7 building within the main campus of Burdwan Hospital in the district of Purba Bardhaman.
Maintenance of Bagepalli Halaguru road (SH-94) from Ch 21.70 km to 45.00 km and 55.00 km to 63.92 km and 64.87 km to 79.57 km(ch 21.70km to 79.57km)1.61km overlap length in Gowribidnur taluk (Others Category)
Please Refer BOQ
Patch Metalling Patch Grouting Carpeting with sand seal coat and other allied works
UDDDC2627100004-(Construction of Lane and Drain from main road to HO Ab Rashid Sheikh Seer Colony Ward No 11 MC Khrew).
Running Maintenance contract of electrical Installation at Nedumkandam, Idukki and Kattappana court complex
Day to Day Civil Maintenance of One Five Storied Hospital Building and One Five Storied Academic and Administrative Building of Burdwan Dental College and Hospital.
Upgradation of different Electrical installation in different government and Hospital under kalna electrical section PWD in FY 23-24. - Emergent Nature work within Kalna
Restoration of rain damages on link road from Sunehar to Mundla Km 0/000 to 3/000 in Distt Kangra (HP) (SH-Construction of road side drain in Km 1/300 to 1/380) (Left Side)
3695-1-Road Signage work from chainage 22.500 to 36.000 of Moradabad-Haridwar-Dehradun road (State Highway No. 49) in Ditrict Moradabad
R.R to set No.1 at Harvington Estate Longwood Shimla 9. SH Providing and fixing ceiling work, flooring work, 19mm board work, tiles work.
RMO E and M Services at District Court, Dwarka, New Delhi. (SH -Comprehensive maintenance of 18 Nos Lifts of Schindler Make)
Renewal of Dharmasagara-Metri Major District Road from Km 4.00 to 8.50 in Kampli Constituency, Under 5054 MDR Renewals for the year 2026-27.
Re-Surfacing to Road Kampli-Kurugodu-Kudatini,-Haraginadoni-Belagal-Ballari-Moka-Aluru Road (SH-132) from Ch.Km 27.50 to 30.00 in Ballari Taluk Under 3054 Non Plan-State Highways for the year 2026-27.
Re-Surfacing to Road Kampli-Kurugodu-Kudatini,-Haraginadoni-Belagal-Ballari-Moka-Aluru Road (SH-132) from Ch.Km 4.50 to 8.00 in Ballari Taluk Under 3054 NP-State highways for the year 2026-27.(working ch 5.00 to 7.10)
Renewal of Daroji-Hosa Nelludi Major District Road from Km 6.00 to 12.00 in Kampli Constituency, Under 5054 MDR Renewals for the year 2026-27.
Renewal of Road from Km 0.00 to 4.65 on Somasamudra -Maruthi Camp Road (MDR-12028) in Kurugodu Taluk, Kampli Assembly Constituency, Under 5054 MDR Renewals for the year 2026-27.
Construction of Cement Concrete (CC) Road on the Damaged Bituminous Stretch of Sachivalaya Road Near the DJB Filling Station, Under Sub-Division-3 of Division C and ND-Roads (M-413), New Delhi, During 2026-27.
Providing Inverter system and allied electrical works in Urban Health and Wellness Centre Nathukallu and Parakadavu Kattappana
Please Refer BOQ
Emergent repair and maintenance work including mending of damaged underground water line and blocking of openings at C-block with other ancillary work under Burdwan Medical College and Hospital, Purba Bardhaman.
Dismantling of Vulnerable Portion of extended chajjas and rehabilitation of Western face of East Block within Bikash Bhavan Compound, Salt Lake City, Kol-91 during the year 2023-2024.
Day to Day repair and maintenance work of Sanitary and Plumbing works for different buildings within the main campus of Burdwan Hospital, in the district of Purba Bardhaman.
Civil Work of Repairing of CDPO Office Building Kushalgarh PWD2627WSOB10179
A/R and M/O State Highway under Mannarghat Sub Division, RCD, APWD, Wimberlygunj during 2026-2027. SW-Deploying of machineries on Hire basis.
Construction of various roads of PWD Sub Dn. Falna under PWD Dn. Bali Package No. RJ-25-17/ML/2026-27 in District Pali
IMPROVEMENT TO BULDHANA DHAD MAHORA BARANJALA SABLE NALANI RAJUR ROAD SH-226 KM 43/00 TO 48/00 TQ. BHOKARDAN DIST. JALNA
SPECIAL REPAIR WORK OF HOUSE NO-73 74 75 AND 76 OF BLOCK NO-1 OF TYPE-2 OF DM COLONY IN DISTRICT BAHRAICH FINANCIAL YEAR 2025-26
Construction of compound wall With Entrance Gate for Govt. HSS Chandilora Tangmarg Baramulla.
Supplym Installation Testing and commissioning of 13 Passenger lift in additional block at Goverment Taluk Hospital Thodupuzha Electrification General Electrical Work
Construction of Cow-Catchers for 03 nos gates to prevent entry of Cattle into the Hospital Premises of Burdwan Medical College and Hospital, Purba Bardhaman.