Loading…
Loading…
118 results • Latest
Restoration of the Administrative Block by way of construction of Committee Room, Sewerage and other works at Main Campus, Chatha.
Reconstruction of Sports Stadium by way of earth filling, boundary, drain etc. at Main Campus, Chatha
Repair Renovation to the Pragati Hostel at R.S. Pura by way of repairs to shutters, plastic patches, white washing etc. at FVSc and AH, R.S. Pura
Extension of Power Supply from Nearest Existing Lt to Auditorium Under Upgradation of Existing Infrastructure (CAPEX) at FoA Wadura, SKUAST-K.
Refixing of solar PV Modules Along with GI Square Hollow Section Pipe Structure at Chinar Ghar Under (ICAR) at Main Campus Shalimar, SKUAST-K
Refixing of solar PV Modules Along with GI Square Hollow Section Pipe Structure at Lab-Block (A2 Block) Under Mushroom Cultivation for Employability and Entrepreneurship (NABARD) at Main Campus Shalimar, SKUAST-K
Construction of Storage Godown Under (ICAR) at KVK Budgam at Haran, SKUAST-K.
Providing electric repair work by way of replacing damaged panel, Copper wire, PVC power cable and other allied work at FVSc and AH R S Pura
Electrical repair work by way of repairing of damaged AMF Panel with synchronizing panel and VCB panel and other allied work at Baba Jitto Auditorium at Main Campus, Chatha
Providing electric repair work by way of SITC of new LT panel board complete and other allied works to be installed near Directorate of Extension and Central Library building at Main Campus, Chatha
Providing electric repair work by way of SITC of new LT panel board complex and other allied works (near block No. 3 and block No. 6) at main campus Chatha
Providing electric repair work by way of SITC of new LT panel board complete and other allied works (Block No. (1) to (8), Museum, Dean office and Library) at Main Campus, Chatha
Diversion of LT Line from Poly House of Vegetable Division Under Entrepreneurship in Precision Vegetable Farming and Floriculture (NABARD) at FVSc and AH Shuhama, SKUAST-K
Renovation of Office Room Under Upgradation of Existing Infrastructure (CAPEX) at Estates Wing, Main Campus Shalimar SKUAST-Kashmir.
SITC of 8 No.12V, 150AH Lead Acid Batteries Alongwith Internal Electrification of Computer Points 6 Amp Switch Sockets for 11 Rooms at Div of Floriculture n Landscape Architecture Faculty of Horticulture Under (HADP) at Main Campus Shalimar, SKUAST-K
Restoration by way of repair renovation to the Central Library, spine and other allied works at Main Campus, Chatha
Reconstruction of boundary wall of Sankalp Boys Hostel at Main Campus, Chatha
Reconstruction of Campus roads damaged due to flash flood by Way of Water Bound Macadam(WBM) and premixing at Main Campus, Chatha
Restoration of Farmers Hostel by way of repair renovation and other allied works at Main Campus, Chatha
Reconstruction of Chain link fencing to the Research Farm at Main Campus, Chatha.
Reconstruction of Fish pond in front of Block No. (1) and (2) at Main Campus, Chatha
Restoration of existing road network by way of WBM premixing and allied works at FVSc and AH, R.S. Pura
Restoration of old library structure by way of rehabilitation and upgradation the existing one at Main Campus, Chatha
Reconstruction of Kerb stones and footpaths at Main Campus, Chatha.
Reconstruction of boundary wall by way of providing RCC Columns Brick work and allied works (Rear portion) at FVSc and AH, R.S. Pura
Reconstruction of Boundary wall from Gate No. (1) including dispose off surface channel and culvert at Main Campus, Chatha
Creation by way of shifting of 6.3 MVA 33 11 KVA receiving station alongwith all the allied civil and electrical works at Main Campus, Chatha
Reconstruction of boundary wall by way of providing RCC and columns brick work and allied works (Front portion) at FVSc and AH Campus, R.S. Pura
Rehabilitation of eroded land by way of crate work and other allied works at KVK Tanda, Reasi
Reconstruction of approach path from sales counter to main Administration building at KVK Gwari, Doda
Reconstruction of Road and Protection work from NH to Residential quarters at KVK Tandwal, Rajouri
Reconstruction of damaged fencing of boundary wall at KVK Samba
Protection work by way of construction of protection walls at KVK Gwari, Doda
Restoration of Dean Students Welfare (DSW) office by way of construction of store record rooms on the First floor of Students Centre at Main Campus, Chatha
Restoration of Dean FOA office by way of construction of store room and record room on the First Floor of Dean office at Main Campus, Chatha
Providing Architectural Consultancy for various buildings at different Stations of SKUAST-Jammu
Construction of cattle shed, construction of shed for goat rearing and poultry shed at ACRA, Rakh Dhiansar
Construction of Storage structure for Division of Vegetable Science at Main Campus, Chatha
Renovation of Soil Testing Laboratory for Analytical studies w.r.t. soil and other farm resources at ACRA, Dhiansar
Construction of one composting unit and vermicomposting unit (for training and demonstration) at ACRA, Rakh Dhiansar
Providing and fixing of PVC wall panelling and false ceiling in new building of Bee Keeping Unit at Main Campus, Chatha
Providing and fixing of PVC wall panelling and false ceiling in new building at Main Campus, Chatha
Construction of Threshing floor for threshing of seed crop at ACRA Dhiansar.
SITC of Heat Pump and Hot Water Tank for Construction of Boys Hostel Under (ICAR) at FVSc and AH Shuhama, SKUAST-K
Stage-VI for Civil and Sanitary Stage Works (repair and maintenance works) for the year 2026-27
Stage-V for Civil and Sanitary Stage Works (repair and maintenance works) for the year 2026-27
Stage-IV for Civil and Sanitary Stage Works (repair and maintenance works) for the year 2026-27
Stage-III for Civil and Sanitary Stage Works (repair and maintenance works) for the year 2026-27
Stage-II for Civil and Sanitary Stage Works (repair and maintenance works) for the year 2026-27
Stage-I for Civil and Sanitary Stage Works (repair and maintenance works) for the year 2026-27