Loading…
Loading…
5,814 results • Recent activity
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III Removal relaying boiler Insulation and its accessories in Burner corner wind box pent house 1st pass Drum enclosure WWSB Dock house Eco ring header S panel and 2nd pass Dock house
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III Removal relaying boiler Insulation in boiler rear side and both left and right side corner from 24 mtr to 52 mtr during Annual Overhaul 2025 26
150W High Bay LED Lights, 150W LED Flood Lights and 200W LED Lights
NCTPS I SE MI circle AOH 25 26 BM Dn Unit II Arresting the air ingress area in HRH slope at Interpass eco 9th header 4 corners in 16 mtr and S panel at first pass peep hole door and man hole door of the boiler by renewal rectification of damaged
NCTPS I SE MI circle AOH 25 26 BM Dn Unit II Reconditioning of defective Coal nozzles Coal tip and Hard facing of reconditioned Coal nozzle and Coal tips for Boiler Burner Overhauling works for the year 2025 26
NCTPS I SE MI circle AOH 25 26 BM Dn Unit II Renewal Rectification of Insulation in Air Pre Heater A and B Pass casing and its Auxiliaries and PRDS system including supply during Annual Overhaul for the year 2025 26