Loading…
Loading…
4,915 results • Latest
Protective Maintenance Works to the TG Column between EL 0.00m to EL 15.50m of Unit 5
004/25-26
Rectification Works to the damaged Ash Slurry Trench Inner Walls below GL leading Bottom Ash to Mill Plant Operator Room South from CH 0m to CH 90m in Unit 4
Remedial measures by Strengthening and Protective Coating in the RCC PSC Structures of Coal Jetty 1 Conveyor System 14 from JT 1E towards West Long Span 6 10 of TTPS in Red Gate area North Break Water of VOC Port at ECHS areas
MTPS-I ES Circle CI Unit-III Bunker 3D collapsed - Rectification restoration of mill area instrumentation Mill 3A,3B,3C 3F- both FSSS and Turbine 3 sub division
Supply of Worm Shaft Thrust bearing Housing with flange caps and fasteners suitable for XRP 803 Bowl Mills - 04Nos
MTPSI ES EM-II SD-II - Replacement of existing 1 set of 230KV SF6 breaker having electro pneumatic type tripping and closing mechanism by new SF6 breaker having complete spring closing and tripping mechanism in transfer bus bay at 230KV switchyard i
Supply of Counter weight pulley assembly suitable for 36 Gravimetric feeder of XRP 803 Bowl Mills - 04 Nos.
MTPS-I ES Circle CI Division - Provision of one number Diesel driven van having seating capacity of 9 persons in all including driver on hire basis for the official use of EE CI MTPS-I for the period
Spares For Auxiliary Cooling Water Pumps Stage I