Loading…
Loading…
3,957 results • Latest
CONSTRUCTION OF RIVETMENT BETWEEN KM 15.000 TO KM 15.355 OF SAKARAUR BHIKHARI PUR RING BUND AT LEFT BANK OF RIVER SARYU/GHAGHARA DISTT-GONDA
RESTORATION OF SPUR AT KM 13.050 LAYING PORCUPINE BETWEEN KM 13.050 TO KM 13.200 OF SAKARAUR BHIKHARI PUR RING BUND AT LEFT BANK OF RIVER SARYU/GHAGHARA DISTT-GONDA
RESTORATION OF SPUR AT KM. 13.200 LAYING PORCUPINE SET BETWEEN KM. 13.200 TO KM 13.430 OF SAKARAUR BHIKHARIPUR RING BUND ON LEFT BANK OF RIVER SARYU/GHAGHARA IN DISTRICT- GONDA
Supply of GEO BAG, E.C. bag (New), Nylon crate and gaviyan rope at Departmental Store Bansi
Supply of GEO BAG, E.C. bag (New), Nylon crate and gaviyan rope at Departmental Store Dumariyaganj.
Supply and fixing of Percupine between km 9.500 and km 9.600 of Bansi Dumariyaganj Bund and between km 0.000 and km 1.000 of Bansi Panghatiya bund.
Supply of Geo bag, E.C. bag (New), Nylon crate and gaviyan rope at departmental store Bansi,Banjaraaha,Kuraja, and Kathaila(temp.).
SILT DISPOSAL BY AUCTIONING OF SIKTA MR. FROM KM 0.000 TO KM 0.400
SILT DISPOSAL BY AUCTIONING OF HARDO DY. FROM KM 0.000 TO KM 1.500
As per the NIT
As per the NIT
As per the NIT
As per the NIT
As per the NIT
As per the NIT
Silt Clearance of Kamokhar Mr (km. 0.000 to 2.200) Kamokhar Mr-1 (0.000 to 1.000), Tihar Mr-1 (0.000 to 1.200), Umari Mr-1 (0.000 to 0.500) and Umari Mr-2 (0.000 to 1.300)
Silt clearance of Parwaha Drain from km. 0.000 to km. 28.876 from Poclain Machine
Repair and Reconstruction of old and Damaged Culvert on Vaghaipur Drain at km. 2.800 (RCC Box Culvert)
Silt Clearance of kain Drain BetweenKm. 9.400 to km.11.200 in District Shrawasti
Thek Clearance of Hathiya Kunda Drain BetweenKm. 2.000 to km.6.000 in District Shrawasti
Silt clearance
Thek Clearance of Suraj Kunda Drain BetweenKm. 0.000 to km.8.000 in District Shrawasti (Lot-04)
As per the NIT
Restoration work of damaged spur no. 34 and 03 damaged dampers of Alipur embankment situated on the left bank of Yamuna river in district Ghaziabad.
Porcupine stud construction work for flood protection of village Adda Firozpur situated on the right bank of Yamuna river in District Mathura.
Porcupine stud construction work for flood protection of village Phoolgarhi situated on the right bank of Yamuna riverin District Mathura.
Construction of spur at Km. 0.400 and Km. 0.700 at Umariya Ring Bund on left bank of River Ghaghra (Saryu) in Distt. Basti.
Boulder Revetment work between Km. 0.080 to Km. 0.650 of Belha-Charangahiya Embankment on the left bank of Rapti River in Distt. Balrampur.
Construction of Anti Erosion work Between Km. 0.830 to Km. 1.130 of Bansi-Panghatiya Bund on right bank of River Rapti in Distt. Siddharthnagar.
Flood protection work between Km 1.250 to Km 1.950 of Majhwaliya sonbarsa Embankment located on the right bank of River Saryu in District Ballia
Flood protection work for up stream of village Chandpur at right bank of Saryu river in district Ballia
Flood protection work for the safety of Pokhara Tola of Gram Sabha Sultanpur, located on the right bank of the Saryu River in district Ballia
ANTI EROSION WORK FOR PROTECTION OF GROUPS OF VILLAGE ARAZI GANGAPUR, ARAZI MALHAPURWA AND ARAZI PURANIYA ON RIGHT BANK OF RIVER SARYU IN DISTT AZAMGARH
Flood protection work for village Maharajpur at right bank of Saryu river in district Ballia
Silt Clearance of Main Kalda Dy. From Km 0.000 to Km 19.815
silt clearance of Dasna Dy from Km 24.000 to 38.390
Construction Of V.R.B At Km. 4.000 Of Dhakiya Dy. under Project M.G.C. Stage-II IN DIST MORADABAD
Construction of Dhakiya dy from km 3.700 to km 4.200 under Project M.G.C. Stage-II IN DIST MORADABAD
Construction of Dhakiya dy from km 7.950 to km 8.400 under Project M.G.C. Stage-II IN DIST MORADABAD
Lot 18 Silt Clearance of Bhojpur Minor from Km. 0.000 to Km. 2.800
Lot 16 Silt Clearance of Pyarepur Minor from Km. 0.000 to Km. 3.600
Lot 21 Silt Clearance of Phoolpur Minor from Km. 0.000 to Km. 5.400
Lot 20 Silt Clearance of Bahorapur Minor from Km. 0.000 to Km. 2.600
Lot 15 Silt Clearance of Bhatauli Minor from Km. 0.000 to Km. 2.900
Protection work in down stream of fall at Km 38.065 of Basti Branch.
LOT02
LOT01
06/SE/MRT/2025-26(LOT02)
06/SE/MRT/2025-26(LOT01)
05/SE/MRT/2025-26(LOT01)