Loading…
Loading…
4,630 results • Recent activity
The work of strengthening and asphalting the approach road of the canal crossing bridge at RD 2350 m of Branch Canal No. 5, originating from the GRBC Main Canal at RD 87000 m and the GRBC at RD 89500 m, Ta Saoli, Dist Chandrapur
Construction and Earthwork of Escape Channel on the Rd 45045m. on Gosikhurd Right Bank Canal. Tah. Bramhapuri, Dist. Chandrapur.
Construction of Remaining Lining, Earthwork and Structures in KM 45 to 99.50 of Gosikhurd Right Bank Main Canal, Ta. Bramhapuri, Dist. Chandrapur.
R/M of wearing coat of aquaduct at km. 83.390, 85.210, 86.481, 91.962 and 92.345 and SLR bridge at km. 93.269 and 93.800 of CLMC.
MODERNISATION OF CHIKHALI BRANCH ON LEFT BANK CANAL OF BODALKASA TANK UNDER DHAPEWADA LIFT IRRIGATION SCHEME STAGE II
Doble--RAMSONS PVC Insulated Cables, Unsheathed with Rigid, Doble--RAMSONS PVC Insulated Cables, Unsheathed with Rigid Conductor Plain Copper 6 Sq.mm