Loading…
Loading…
6,098 results • Best match
THIRD ATTEMPT SANKROLI IRRIGATION SCHEME. Resurfacing of Existing Asphalt Dam Approach Road of Sankroli Irrigation Scheme
Resurfacing of Existing Asphalt Approach Road of Sankroli Irrigation Scheme.
THIRD ATTEMPT CHHAPARWADI-II IRRIGATION SCHEME. Resurfacing of Existing Asphalt Dam Approach Road & Miscellaneous work at Chhaparwadi-II Irrigation Scheme
Resurfacing of Existing Asphalt Dam Approach Road & Miscellaneous work at Chhaparwadi-II Irrigation Scheme.
RESURFACING OF NEW RATNAL APPROACH ROAD TA.ANJAR (MMGSY/ RESURFACING/ NON PLAN/ SCSP/ 2026-27)
construction joint incl. filling the joint with asphalt filler as per
Resurfacing of Patri Facharia Road - Km. 0/0 to 6/50 Ta. Mundra Dist. Bhuj-Kachchh under MMGSY (Resurfacing) Year-2025-26
with asphalt filler as per direction by engineer in charge and as per
Resurfacing of Road (Resurfacing of 30M wide road from CNG Pump to Yadu Public School Sector-122), Noida
Providing and laying bitumen mastic wearing course (as per specifications) with industrial bitumen of grade 85/25 conforming to IS : 702, prepared by using mastic cooker and laid to required level and slope, including providing antiskid surface with bitumen precoated fine grained hard stone chipping of approved size at the rate of 0.005 cum per 10 sqm and at approximate spacing of 10 cm centre to centre in both directions, pressed into surface protruding 1 mm to 40 mm over mastic surface, including cleaning the surface, removal of debris etc. all complete. (Considering bitumen using 10.2% as per MORTH specification).
Strengthening of Road (Resurfacing of 45.00M Wide Road in Sector 127) Noida
Providing and laying bitumen mastic wearing course (as per specifications) with industrial bitumen of grade 85/25 conforming to IS : 702 prepared by using mastic cooker and laid to required level and slope including providing antiskid surface with bitumen precoated fine grained hard stone chipping of approved size at the rate of 0.005 cum per 10 sqm and at approximates spacing of 10cm centre to centre in both directions, pressed into surface protruding 1mm to 4mm over mastic surface, including cleaning the surface, removal of debris etc. all complete. ( Considering bitumen using 10.2% as per MORTH specification .) 40 mm thick