Loading…
Loading…
4,204 results • Best match
Emergent Maintenance work of the existing road of the project Construction of 4 Lane Bridge over Irang River on Imphal Jiribam road section 95.5Km NH37 Old NH53 in the State of Manipur on EPC mode at the Risk and Cost of the EPC Contractor
Construction of Earthen Shoulders with Material Deposited from Roadway Cutting (Construction of sub-grade and earthen shoulders with approved matedal deposited at site from roadway cutting and excavated from drain and foundation of other structures graded and compacted to meet requirement of table No. 300-2)
Bitumen Road work at Sunaliya Bridge to Power House Raod Fatak (Under Bridge Road) at Korba
Bitumen Road work at Sunaliya Bridge to Power House Raod Fatak (Under Bridge Road) at Korba
Construction of Bridge in Sivasagar District i) Br. No. 2/1 on Raisai bridge
Implementation of Enviromental and Social Management Plan -Air quality monitoring at 3 locations before the start of the construction work and will be treated as the baseline data. (3 Locations x single time = 3 Nos. of sample) First Year 1st season of of the works (i) Br. No. 2/1 Raisai bridge
S&T work in c/w (1) Repl. of steel girder with RCC slab of Bridge No.102 UP&DN, 111 UP&DN, 119 UP on JUC-ASR sec., B.no.180 on ASR-ATT & br. no.103 on VKA- DBNK section. (ii) Construction of LHS of internal size 5 m X 3.5 m LHS in lieu of LC C-7 at ... (iii) Construction of ... (iv) Construction of ... boxes) bridge in ... trough bridge no.158 ...
anchor bolts shall be supplied by the contractor. Contractor is required to execute all type of repair works of foundations if required during inserting the cable for termination. All concrete work must be ratio of cement, coarse sand and aggregate 1:3:6. (Inspection: Site Engineer)
PROCUREMENT OF CHORD BOLT PART NO BB-9 FOR BAILEY BRIDGE FOR WORKS CONTRACT AT HOWRAH WORKS