Loading…
Loading…
16,948 results • Best match
Combined Station Works (CSW) including Civil, Mechanical, Electrical and Instrumentation work for development of ATF receipt facilities at Trichy
... lugs, sealing material, laying of cable, testing & commissioning ...
SIGNALLING AND TELECOM PORTION OF WORK LIMITED USE SUBWAY (LUS) IN CONNECTION WITH ENGINEERING WORKS IN AJJ-CGL SECTION
... throughout, with earth after laying of cables, and consolidating the trench by ramming and leveling. Laying of cables is not included in this ...
SPL REPAIR OF ELECTRIFICATION OF OFFICE SHELTER, MAIN OFFICE (T-701) AND QM OFFICE (T-700) OF 2118 FD HOSP AND SPL REPAIR TO REWIRING OF BLDG NO T-533 OF 438 (I) FD COY AT NIMU MIL STN UNDER AGE (I) NIMU
Supply, laying and testing cable XLPE Insulated ,screened, ...
Provision of Interlocking of 6 Nos. of LC Gates over Malda Division whose TVU are greater than 10K.
F-Trenching & Cable Laying
REPAIRS TO INTERNAL ELECTRIFICATION INCLUDING METERS, CEILING FANS, GEYSERS AND EXTERNAL ELECTRIFICATION INCLUDING FPs DBs AND APFC AT GV CAMP AND 26ED UNDER GE (AF) MARATHAHALLI
... earth soil 15cm deep before laying the cable and 8 cm depth after laying of cable, complete all as specified.
Stage Rate Contract for Maintenance and upkeep of IT and Telecom infrastructure and allied works at SKIMS Soura
Digging of Soft Soil for duct/cable laying (2-3 ft Deep) per Meter and refilling of the excavated earth after laying of cable(s).
Electrification work in connection with provision of High Level passenger platform and Goods Shed at New Amravati Station.
Erection Total 717200.00 Item- 40 Supply and laying of RCC cable Trench & Cover with metal lid for cable laying S No. Item Description of Item Unit Qty Rate Amount No
Tender for providing SOP to HRTC for EV charging station at new bus stand Keylong in ( E) Section Keylong under ESD HPSEBL Keylong
Erection of 11KV HT Cable (Laying & Sagging of 11KV HT Cable)
Erection and installation of 63MVA T/F alongwith strengthening of 132KV Bus Bar from Single Moose to Twin Moose and splitting of 33 KV Bus at 132KV Sub-Station Khaga, under Electy. Trans. Division-Fatehpur
Prepairing cable schedule and laying ,dressing,binding and termination ...
SPECIAL REPAIR OF BOUNDARY WALL, GATE, HARD STANDING FOR BUILDING NO WB-286 AND WB-287 MES OFFICER ACCN UNDER GE (MCTE) MHOW
... type/ make and Supply & laying (in repair) cable XLPE Insulated screened ...
Supply, delivery and installation of Two (02) no Auto-manual control panel with time switch rating up to 20KW Submersible P/M set at Nibra-2 P/H and Kona Bus stand P/H along with allied E-M works under FAWS-1 scheme.
Laying of two cables upto 35 sq mm in underground ...
SPECIAL REPAIR TO BLDG NO P 18 AGAINST JOB NO W SR BLDG 02 STN HQ KHUNMOH 2025 26 UNDER GE 861 EWS
... clean fine river sand for underground cable 8 cm before laying cable and 15 cm after laying and... and punned to 18 cm after laying of cable complete all as specified. ...
Utilily Shifting Work (Electrical) for ROB and RUB Dhundhara District Jodhpur.
... mm along the trench, (b) Lay the cable in the middle of the trench,... height 100 mm on top of the cable, (d) Lay the protective Common burnt ...
CA NO GE(N)AMB-82/2025-26 ADDN/ALTN FOR BLDG AT RAINA AUDITORIUM AND CONSTRUCTION OF PARKING AND HARD STANDING FOR AD REGT UNDER AGE B/R-II OF GE (NORTH) AMBALA CANTT
... to cable i.e 8 cm before laying cable in trenches and 15 cm after laying the cable and compacting complete ...
Design, Supply, Erection, Modification, Testing and Commissioning of 1x25kV OHE in connection with new 3rd & 4th line between JRPD to ANGL along with KPJG & ANGL Yard including Feeder for SWSs with provision of Higer Size Foundation , Mast & Super Mast for 2X25kV Running Feeder along with design, supply, erection, modification/augmentation, testing and commissioning of 1x25KV Sectioning & Paralleling Post (SP) at Kerejanga & Sub-Sectioning & Paralleling Post (SSP)at Angul between JRPD-ANGL under East Coast Railway.
Laying of (XLPE Cable LT/PVC insulated Armoured) cables of different sizes.
SPL REPAIR TO BLDG NO T05 PATIENT COOK HOUSE AT MH DANAPUR CANTT
... cable, 8 cm in depth before laying the cable and 15 cm in depth after laying the cable complete all as specified. ...
Ajmer Division-"Provision of 72 CCTV cameras with monitoring and recording system at all Major Booking office & PRS counters, 22 Stations (29 Locations)."
... nos. of labours for proper laying of cables into the bore. Cable shall ...
PROVN OF HIGH MAST LIGHTS OF CERTAIN LOCATIONS AT AFAC COIMBATORE
... out in hard/dense soil for laying of UG cables or for errection of pole ...
I) Ajni- Proposed Construction of Sewage Treatment Plant of 400 KLD capacity by Phytorid Technology at Ajni colony including 3 years Operation and Maintenance of Plant. II) Proposed Construction of Sewage Treatment Plant of 200 KLD Capacity by ... including underground sump ...
trench (After laying cable) to bring the
LW/PER - Operation and maintenance of Effluent/ Sewage treatment plant at Loco Works, Perambur.
... Cables - 15 Mtrs, Pipes for cable laying-20 mtrs. As and when required. ...
FOR CONSTRUCTION OF (33 KV MSKP) BAY AT 132 KV S/S DADANAGAR KANPUR UNDER ETD-I KANPUR
... proper wiring & required cable laying and termination from LED ...
WORK MENSION IN BOQ
Under graound cable laying charges with HDPE pipe. complete in all respect as per RESSPO norms required material will be provided by the contractor.
Providing and Installation of Submersible pumping machineries and other electromechanical equipments at Shankarpur PWSS under Rajnagar Block in the Dist of Birbhum under Bolpur Mechanical Division,P.H.E.Dte
... sand, cement, rod etc and laying & cable protection pipe as required ...
Repairs and Maintance Works to Amma unavagam in ward no.14
... excavation , refilling and cable laying and including all incidential ...
SPECIAL REPAIR TO LT PANELS, UG CABLES AND CONNECTED WORKS AT INS UTKROSH UNDER GE MINNIE BAY, SRI VIJAYA PURAM
Excavation in soft / loose soil not exceeding 1.5 mtr wide and n exc 1.5 mtr depth and getting out incl forming of bottom for laying cable all as specified and directed
Design, Supply, Erection, Commissioning & Testing of Balance work of 220 KV 3 phase transmission line From PGCIL Mainpuri to 220/132 kV Bhogaon GSS.
Item Breakup - 02-220KV Cable laying work
REPAIR/ MAINTENANCE OF 33 KV AND 11KV HT CONTROL EQUIPMENT, TRANSFORMERS, SWITCHGEARS AND ALLIED WORKS AT VARIOUS LOCATION OF SHILLONG UNDER GE SHILLONG
... pier holes, etc. or for cable laying or water supply pipes lines ...
SPECIAL REPAIR/REPLACEMENT OF ELECTRIC SWITCH AND TIMER SWITCH OF STREET LIGHTS AT AFSSR AND PROVISION OF AUGMENTATION OF THREE PHASE POWER SUPPLY AT SHIPS GALLERY AT INS ARAVALI UNDER GE (AF) GURGAON
... for foundation etc or for laying cable etc n exc 10 Sqm on plan ...
REPAIR / MAINT OF LT PANELS, DISTRIBUTION FEEDER PILLAR BOXES, LT DISTRIBUTION SYSTEM AND OTHER CONNECTED WORKS AT NAUSENABAUGH AND ALLIED AREAS UNDER AGE E/M NO-I OF GE(U-I) VISAKHAPATNAM
... not exc 1.5 m in depth; laying of cable etc. n exc 10 sq m on plan ...
REPAIR / MAINT OF LT PANELS, DISTRIBUTION FEEDER PILLAR BOXES, LT DISTRIBUTION SYSTEM AND OTHER CONNECTED WORKS AT NAVAL PARK, AMZARI PARK, AND ALLIED AREAS UNDER AGE E/M NO-I OF GE(U-I) VISAKHAPATNAM
... not exc 1.5 m in depth; laying of cable etc. n exc 10 sq m on plan ...
Provision of S&T arrangements in connection with provision of Track Machine Siding at KOLLAM & KAYANKULAM stations and proposed extension of shunting neck at THRISSUR stations of TVC division.
68.00 road crossing of cables, laying of DWC/ RCC pipes with collar/... to the original position. Laying of cables is not included in this ...
Rate Contract for Electrical Repair and Maintenance work in JLN Hospital Ajmer
... mm along the trench, (b) Lay the cable in the middle of the trench,... height 100 mm on top of the cable, (d) Lay the protective Common burnt ...
SPL REPAIR OF OR LIVING MES STAFF INCLUDING BATHROOM and TOILET STORAGE ACCN SEVERAGE LINE AND KITCHEN AREA OF BLDG NO P05 A B C AND P5 HF AT SI LINES UNDER GE BHOPAL
Excavation in trenches n. exc. 1.5 mtr in wide and n. exc. 1.5 mtr in depth for laying of underground cable pipe and getting out in soft disintegrated rock all as specified and directed.
At KOJ: Balance Electrical work of KOJ station in connection with ABSS provision of Platform surfacing, development of circulating area, approach road and toilet in circulating area for passengers in the jurisdiction of SSE/W/FKM.
Excavation of cable trench for laying of cable with necessary cable protection is to be done as per direction of Railway Engineer.
03/ETC-II(P)/2026-2027
... cable, cutting of earthing, laying control cable, making termination, preparation ...
Supply, installation, testing and commissioning of passenger amenities and other telecom assets at various Stations of Mumbai Division.
... plan and refilling after laying of cable And /or ducts. The work ...
CA NO. GE (AF)/SGR-61/2026-27 SPECIAL REPAIR TO PETROLEUM OIL AND LUBRICANT (POL) STORES AT CERTAIN LOCATIONS UNDER GE (AF) SRINAGAR
... consolidation 8 cm thick before laying the cable and 15 cm of the sand after laying the cable but will be measured 18 ...
SPL REPAIR FOR REPLACEMENT OF WATER SUPPLY PIPE LINE ALONGWITH CONNECTED ITEMS AT ZONE-06 AND REPAIR/MAINTENANCE OF LT CABLE AND CONNECTED WORKS FOR PM SHRI KV SCHOOL BABINA CANTT UNDER GE BABINA
... 0.75 m deep suitable for laying underground cables/MS tubes of any size/dia ...
Repair/Maint to LT Network system at 135 EME, Signal Regt, PBE and other locations under GE (Utilities) Udhampur
Supply and laying LT UG cable XLPE insulated armoured ...
SPECIAL REPAIRS TO SEATING AND FLOORING OF MULLA AUDITORIUM AT DSSC UNDER GE DSSC WELLINGTON
Supply and laying cable XLPE insulated screened, ...
Electrical Miscellaneous Maintenance works under SSE/PS/PCOI (NYN to MNF and PCOI to IDGJ section) for 02 Years.
above LT cable . Laying direct in ground
PROVN OF 03 X TOILET BLOCK NEAR TRG AREA WITH PATHWAY AT SW DIV AND 01 X TOILET BLOCK AT BGFFR AND 01 X TOILET BLOCK AT TRG AREA OF CR II WITH PATHWAY AT PW DIV AT THE INF SCHOOL, MHOW UNDER GE MIS MHOW
Supply and laying & testing and commisioning LT underground cable 1100 volts grade, XLPE insulated ...
SPECIAL REPAIR AND CONVERSION OF 2/4 POLE STRUCTURES TO RMU AT HQ TASA AND 1 EME CENTRE UNDER AGE E/M-I OF GE (U) SECUNDERABAD.
... cushioning to protection of underground cables, laid 8 Cm before laying and 15 Cm after laying of cable, and punned to form an overall ...
ADDN/ ALTN OF LT DISTRUBUTION NETWORK NEAR KONARK MESS AT ARMY AREA UNDER GE (A) No 1 JODHPUR
... layers (8cm thick before laying of cable & 15cm thick after laying cable to a total of 23cm) including ...
Signalling work in connection with Provision of crossover between UP & DN TH line in Vikhroli & Shifting of crossover 108 to relax existing PSR 60 Kmph at Byculla in Mumbai division.
... specifications. This also includes laying & termination of cable if any from Panel Room to ...
Cable-Replacement of defective cable from Power house to Kotta and High mast, Relaying cables from Pump house to RO plant Vertical Distribution Board, Kotta to Pump Room and Pump Room to newly constructing temple under Sponsorship
Cable Laying
Highmask related work in Nagar Parishad Hindaun City
... mm along the trench, (b) Lay the cable in the middle of the trench,... height 125 mm on top of the cable, (d) Lay the protective Common burnt ...
Signalling and Telecommunication arrangements in connection with provision of Track Machine siding at Ferok ( FK) and Elattur (ETR) stations under SSE/CLT and SSE/TIR Jurisdictions and other Engineering works over Palakkad Division.
... pipes (50/100mm dia) for cable laying with offset at both ends... pipes with couplings and laying of cables is not included in this ...
PROVN OF TOILET BLOCK NEAR P-95 AT SRC, RAMGARH CANTT
... required slope/gradient for laying cables/ pipes, foundations , laying of cable, shafts, well, cesspits, ...
Provision of Air Conditioner in Station Master's office/panel/VDU room/Power Cabins at 102 stations over Ambala Division, Construction of New Double Story Adminstrative Building by demolishing of Existing Admin Building at ROH depot, Khanalampura over Ambala division, Soft Upgradation/Improvement of Ambala Railway Station & Augmentation of infrastructure Facilities by Repair and Rehabilitation of washing line Nos 1& 2 at C&W Depot ,Bathinda.
... and then refilling after laying of cable as per IS 1255:1983 and ...