Loading…
Loading…
16,948 results • Best match
SPL REPAIRS OF BLDG NO P-04 P-05 OR LINE AT DHAR ROAD GRN UNDER GE ARMY DHAR ROAD
... of sand 80mm thick before laying of cable and 150mm thick after laying of cable to trenches and punning ...
Electrical Power supply arrangements for Climatic test chamber.
Laying of HT cable up to 300 sq.mm duly excavating and re-filling the trench including with excavated earth as per ICF Specification.
8281SETTING UP OF CLIMATE CONTROL SYSTEM FOR NAVAL DOCKYARD ARCHIVE AND RELICS ROOMS AND ADDITION/ALTERATION AND UPGRADATION OF LT PANELS AND ALLIED WORKS AT CAISSON NO. 18 AND IN NAVAL DOCKYARD (MUMBAI).
Taking down old unserviceable cable and Supply, laying and testing cable XLPE insulated screened ...
Shifting of 33 KV, 11 KV, and LT lines and distribution transformers of various capacities which are obstructing the utility shifting corridor to alternate locations, within the jurisdiction of the Electricity Distribution Division, Pratapgarh
Laying of AB cable size 3x95+1x70+1x35 sq. mm. Overhead With all fittings as per respo norms of LT line on 8.5 mtr PCC Pole.
PROVN OF WORKS SERVICES FOR REVERTING TO BACKFEED CONFIGURATION IN POWER RING OF MAFI PROJECT AT 35WG AT AF STN SURATGARH
... exceeding 1.5 mtr wide for laying of cables, erection of poles,struts, ...
Capital Work of 220 kV Substation, Edappon, Erection of 3 Nos. 20 MVA, 110/11 kV Transformers and associated bay equipment/panels by dismantling 2 Nos. existing 63 MVA, 110/66 kV Transformers and 3 Nos. existing 10 MVA, 66/11 kV Transformers.
... back filling the soil after cable laying and consolidating the soil in layers of 75cm (excluding laying of cable).
S&T works in connection with Extension of COP to Cover Entire Length of Platforms at Adilabad, Kinwat, Himaytanagar, Bhokar, Manwat Road, Selu, Partur, Rotegaon and Washim Stations over Nanded Division
... roa d a n d refilling after laying the cables a s p e r drawing no.SDO/CABLE LAYING/010. The surface of the ...
S&T works in connection with Extension of COP to Cover Entire Length of Platforms at Adilabad, Kinwat, Himaytanagar, Bhokar, Manwat Road, Selu, Partur, Rotegaon and Washim Stations over Nanded Division
... roa d a n d refilling after laying the cables a s p e r drawing no.SDO/CABLE LAYING/010. The surface of the ...
Construction, Surveying, Designing, Supplying, Installation and Commissioning of 3 Way Traffic Junction Point at Harimandir Chowk, Nalbari
ITEM-5.(7.1.1)Cable Laying – copper cables through poles/ducts/trenches:Laying ...
S&T works in connection with Extension of COP to Cover Entire Length of Platforms at Adilabad, Kinwat, Himaytanagar, Bhokar, Manwat Road, Selu, Partur, Rotegaon and Washim Stations over Nanded Division
... roa d a n d refilling after laying the cables a s p e r drawing no.SDO/CABLE LAYING/010. The surface of the ...
UPGRADATION OF HT 11 KV TWO POLE STRUCTURE TO VCB AT AT SUB STATION NO 09 INCLUDING CONNECTED WORK UNDER GE DSSC WELINGTON
... standing/ PCC/WBM etc for laying LT cables through pipes of any size ...
S&T Work in C/W Upgradation/Development of maintenance facilities for other rolling stocks (LHB/ICF/DEMU/MEMU/EMU) at Coaching Depot Jodhpur, Upgradation of wagon maintenance facilities at SONU station, Supply, Installation and Commissioning of Electronic in Motion Weighbridge at NAC and THM station.
nos. of labours for proper laying of cables
S&T works in connection with Extension of COP to Cover Entire Length of Platforms at Adilabad, Kinwat, Himaytanagar, Bhokar, Manwat Road, Selu, Partur, Rotegaon and Washim Stations over Nanded Division
... roa d a n d refilling after laying the cables a s p e r drawing no.SDO/CABLE LAYING/010. The surface of the ...
Construction of Skill Lab at Academy Building Under Kolkata Medical College and Hospital..---(Part A)... Electrical Installation Work
E. Laying of cables :--- Laying of cable above 3½ core 70 sqmm and ...
Electrical Utility Shifting of 33/11 KV HT and LT Line From Mother Teresa B.Ed College to Shri Agrasen Udog (New RIICO INS Area) Distt Bharatpur
... item no. 11.1 to 11.4 for Laying Charges for cable through Vermeer machine... repairing the pit after laying of cable with PCC/ Bitumin as required.
As described in Bill of quantities
M&L for sand cushioning to under ground cable provided with layer of sand (8cm deep before laying the cable and 15 cm deep after laying the cable ie total 23 cm.
Spl repair/replacement of LT OH line Into UG cables at 12 Dogra under GE (Utilities) Udhampur
... exc. 1.50 mtr depth for laying of underground cable, erection of poles etc. ...
CA NO. CWE/HILLS/PGH/181 OF 2025-2026 REPAIR /MAINT /OVERHAULTING OF DISTRIBUTION TRANSFORMERS, CIRCUIT BREAKERS, 33/11 KV SWITCH YARD EQUIPMENTS, BATTERY CHARGING SYSTEM AT DEVKATIYA AND PITHORAGARH UNDER GE PITHORAGARH
... of sand 8cm thick before laying of cable and 15cm after laying of cable in trenches complete all ...
SPL REP TO BLDG NO ET-85 AND PROVN OF CERTAIN OTHER SANCTIONED WORKS AT VARIOUS UNIT IN DARRANGA AND TAMULPUR MIL STN UNDER GE RANGIA
... thickness (8 Cm in depth before laying the Cable and 15 Cm in depth after laying the Cable) and consolidated (punned) ...
As per tender
Laying of cable in Existing Trench/GI pipe/Stone Ware/ RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff - LT UG Cable Laying - 2.5 to 25 Sqmm
Signaling and Telecommunication portion of work in connection with Five Engineering works in Arakkonam (AJJ) - Renigunta (RU) section in Chennai Division. (AJJ-RU-01/2026)
Supply and laying of cable tray (300mm width x50mm... bolts and nuts etc. and lay the cables (UTP/STP /Switchboard cable/PIJF/OFC ...
Foundation and Erection of Yard structures with 2 Nos of 5MVA 33/11kV Transformers in connection with the construction of 33kV Substation Medical College, Mulamkunnathukavu
... cable(armoured or un armoured) from cable drums and laying through trench/pipe/cable ...
(A) S&T works in connection with modification of Prayagraj Chheoki, Link junction and Naini Jn. yard layout. (B) Signaling work in connection with Provision of a crossover for provision of simultaneous movement at Link Junction station.
... per RDSO sketch No. SDO/CABLE LAYING/003, issued vide RDSO document ...
Renovation of Electrical Installation comprising mainly overhauling of LT power supply,switches and old panel ,wiring of different floors of Annex building-II, Sales Tax Complex, Beliaghata.
Laying of one cable above 150 sqmm and upto ...
Repair and renovation works of electrical installation along with SITC of distribution LT Panel, Air conditioning, Compound Lighting, Glow Sign Board, LPS System etc at New Integrated Govt. School, Simlapal, Bankura.
Laying of cable above 3½ core 50 sqmm and ...
REPAIR/MAINT OF HT/LT DISTRIBUTION, PERIMETER AND SECURITY LIGHTS, FLOOD LIGHTS, LT PANELS AND CERTAIN WKS FOR DGQA AND ASC SUPPLY DEPOT UNDER GE (I) KANPUR
... 23cm thick (8 Cm before laying the cable and 15 cm thick after laying the cable) in trenches including watering ...
Special repairing of Internal and External Electrical Installation work at Circular Building (G Plus 1) within the campus of Police Training School in the District of Kolkata.
Laying only Cable above 50 sqmm but not exceeding 400sqmm through existing RCC/ Hume/GI Pipe/open masonary trench for single, 2, 3, 3½ and 4 core [F-1/3(b)]
PROVN OF EXTERNAL ELECTRIC SUPPLY TO INTEGRATED TECHNICAL DIRECTORATE BUILDING ITDB FOR DRDO AT SHANKAR VIHAR UNDER GE U E/S DELHI CANTT-10
Supply, laying & testing cable XLPE insulated screened ...
REPAIR/ MAINT OF STREET LIGHT/ FLOOD LIGHT/ GARDEN LIGHT AT CHANGSARI MIL STN AND SUPPLY OF CHEMICAL FOR WATER TREATMENT AT CHANGSARI, TAMULPUR AND DARRANGA MIL STN UNDER GE RANGIA
... thickness (8 Cm in depth before laying the Cable and 15 Cm in depth after laying the Cable) and consolidated (punned) ...
REPAIR/MAINTENANCE OF SEWAGE SYSTEM INCLUDING SEWAR LINES MANHOLES INSPECTION CHAMBERS AND CONNECTED B/R WORKS AT ZONE D MIL STN RAIWALA UNDER AGE (I) RAIWALA.
... cesspits, manholes etc / for laying of cable/ pipe etc n exc 10 sqm on ...
REPAIR/MAINTENANCE OF SEWAGE SYSTEM INCLUDING SEWAR LINES MANHOLES INSPECTION CHAMBERS AND CONNECTED B/R WORKS AT ZONE B MIL STN RAIWALA UNDER AGE (I) RAIWALA
... cesspits, manholes etc / for laying of cable/ pipe etc n exc 10 sqm on ...
Addition and alteration of existing Electrical Installation for Upgradation as PWD Standard of Bijoygarh State General Hospital, South 24 Parganas_SITC of Air Conditioning System
Laying of cable of size 4 core 6 sqmm on ...
REPAIR AND MAINT OF RUNWAY TAXIWAY LIGHTS CCR UNITS HANGER DOORS AND MISC ITEMS OF TECHNICAL AREA AT NAGTALAO UNDER GE BANAR
... replacement of 16 sqmm 4 Core XLPE cable incl Laying and testing in trenches ...
SITC of 20 Bed- cumpassenger lift 3rd lift in the vacant lift shaft from ground floor to 3rd floor, at Baghajatin SGH, South 24 Parganas. ------ Electrical Installation work for SITC of 01 nos 20 Passenger Bed-cum-passenger lift.
Laying of cable from 3/3½ core 35 sqmm to ...
ADDN/ALTN OF SECURITY WALL NEAR SENTARY POST AT BD BARI MIL STN UNDER GE KALUCHAK
... layer of 08 cm thick before laying the cable and second layer of 15 cm thick after laying the cable all as specified in clause ...
SPL REPAIR REPLACEMENT OF OVERHEAD ACSR CONDUCTOR WITH UG CABLE LT PANELS AND CONNECTED ITEMS UNDER GE DINJAN
Excavation in trenches in soft/loose soil not exceeding 1.5 mtr deep and not exceeding 1.5 mtr wide and getting out for laying of cable complete all as specified and directed.
DSTE/MAQ section: Reliability improvement of Signal and Telecom assets by replacement of defective cables, protection of cables and other works, painting of S&T gears at various locations of DSTE/MAQ section
... Mtr. for road crossing of cables, laying of DWC/ 4 RCC pipes with... to the original position. Laying of cables is not included in this ...
ADSTE/CLT section: Reliability improvement of Signal and Telecom assets by replacement of defective cables, protection of cables and other works, painting of S&T gears at various locations of ADSTE/CLT section
... Mtr. for road crossing of cables, laying of DWC/ 4 RCC pipes with... to the original position. Laying of cables is not included in this ...
ADSTE/PGT section: Reliability improvement of Signal and Telecom assets by replacement of defective cables, protection of cables and other works, painting of S&T gears at various locations of ADSTE/PGT section
... Mtr. for road crossing of cables, laying of DWC/ 4 RCC pipes with... to the original position. Laying of cables is not included in this ...
DSTE/MAQ section: Reliability improvement of Signal and Telecom assets by replacement of defective cables, protection of cables and other works, painting of S&T gears at various locations of DSTE/MAQ section
... Mtr. for road crossing of cables, laying of DWC/ 4 RCC pipes with... to the original position. Laying of cables is not included in this ...
ADSTE/PGT section: Reliability improvement of Signal and Telecom assets by replacement of defective cables, protection of cables and other works, painting of S&T gears at various locations of ADSTE/PGT section
... Mtr. for road crossing of cables, laying of DWC/ 4 RCC pipes with... to the original position. Laying of cables is not included in this ...
PROVN OF E/M SERVICES FOR 29 DUs CONSTRUCTED BY DMRC AGAINST EVI AT VSB AT AF STN TUGHLAKABAD
Supply laying & testing cable XLPE insulated screened ...
INSTRUMENTATION WORKS FOR PROPYLENE RECOVERY SECTION PRU FOR EPCM1 AT NREP
... termination is included in cable laying cost. Following is applicable... glanding & termination and cables are layed by others.
Proposed Building of Community Relief Centre at Nayachar Island near Meen Bhavan in the Purba Medinipur Electrical Division. ---- SITC of Solar Power system and SITC of 05 KVA DG Sets.
... insulation, and tagging. 4) Cable Laying in HDPE Conduits: Laying ...
Proposed Building of Community Relief Centre at Nayachar Island near Khejurtala in the Purba Medinipur Electrical Division. ---- SITC of Solar Power system and SITC of 05 KVA DG Sets.
... insulation, and tagging. 4) Cable Laying in HDPE Conduits: Laying ...
Electrification, wiring lighting and seperate power supply arrangement of Block-C and left over electrical work at Pataliputra Rail Parisar Digha Patna and any other location under Dy.CEE/Con/N/SPJ
Supply of medium gauge TATA / JINDAL make Or any ISI markedG.I. pipe for protection of cable. (Fixing cost included in cable laying items.) (a)100mm dia.
SPL REPAIR TO BLDG NO P-17(QTR NO 01 TO 04) P-18 (QTR NO 01 TO 04) AND P-20 (QTR NO 01 TO 05) OF MH AREA AT MH MEERUT UNDER GE(UTILITY) MEERUT CANTT.
Sand cushioning for underground cables 8 cm before laying the cable and 15 cm after laying and ...
PROVN OF COOLING APPLIANCES AND E/M EQUIPMENT AT AF STN TUGHLAKABAD UNDER GE (AF) TUGHLAKABAD
Supply, laying and testing cable XLPE Insulated ,screened, ...
Signalling work in connection with provision of second goods shed common running line of 750M at Phariya station of BSB division.
Laying of signalling cable (2 core to 12 core) in the... meggering of all main & tail cables. The cable laying includes laying of cable in trenches as per the technical ...
Signalling work in connection with provision of second goods shed common running line of 750M at Phariya station of BSB division.
Laying of signalling cable (2 core to 12 core) in the... meggering of all main & tail cables. The cable laying includes laying of cable in trenches as per the technical ...