Loading…
Loading…
16,948 results • Best match
Electrical work for Provision of raising & resurfacing of platform surface at Jakpur, Shyamchak, Balichak and Duan stations.
6 6 Laying of LT cable/cables in underground along Metre 3400.00 148.43 504662.00
OFC rehabilitation and patch work in Chittorgarh OA of Ajmer BA
OF CABLE Laying by Pulling/Blowing (OF Cable & Accessories to be supplied by BSNL)
PROVISION OF RING MAIN UNIT AT CDS II PROVISION OF STANDBY 11 KV HT SUPPLY FOR N13 JETTY SUBSTATION AND PROVISION OF WATER COOLER AND CONNECTED ACCESSORIES SUPPLY JOINTS AT JETTY WATER POINTS AT NAVAL DOCKYARD VISAKHAPATNAM UNDER GE (I) DM VISAKHAPA
M&L for dry sand cushioning for under ground cable provided with layer and sand 8 cm deep before laying the cable and 15cm after laying the cable complete all as specified and directed.
Provision of different capacity pumps at different locations for water supply during summer period over Nagpur division.
01 Description:- Trenching/Digging of earth 1mtr deep for cable laying
Supply, Installation, Testing & Commissioning of MSDAC, Alteration/Modification in Electronic Interlocking at Stations and associated works for Reliability Improvement at JHS EI-I, EI-II, Nandkhas, Moth & Erach Road Stations of Jhansi Division.
Placing of DWC/RCC pipes along with collars in trenches at places of track and crossings, platform cuttings etc. also for straight cable laying (Cable laying is covered separately)
Construction of 50 bedded RPF Barracks at MPM in the section of SSE/W/MPM/WAT under the jurisdiction of ADEN/Estate/WAT.
... incharge to work site. & laying of cable shall be completed with contractors men & materials. The cable laying shall be in accordance with ...
Tender for the work of enhancement of 200 KVA to 400 KVA DTC at Barazannagar Bicholim, for releasing power supply to 1 no. of LTDS II to Smt. Vanita K.Mandrekar, Mandrekarwada Bicholim, in the jurisdiction of S.O. Bicholim, under SDI, Bicholim.
Supply and laying of underground cable protective cover as per ...
Supplying, Installation, Testing, Commissioning and Energization of 400 KVA 33-11/0.433 KV transformer and balance L.T. lines with all other allied items in Sec-80 Faridabad. (Including defect liability 6 Year for transformer and 3 year defect liabil
[24.2.4.5]LT CABLE 4.5. Laying of underground cable in pipe /existing open/closed trench etc as required:- 300 sqmm to 400 sqmm 3 to 3½ Core [Through Rate]
REPAIR/MAINTENANCE OF DISTRIBUTION TRANSFORMERS AND PROTECTIVE RELAYS AND CONNECTED WORKS AT INS DRONACHARYA AND SMA RAMESHWARAM UNDER GE FORT KOCHI.
... thickness (8 CM in depth before laying the cable and 15 CM in depth after laying the cable) and above sand shall be ...
Provision of HT substation at various station of JBP division
... trench: Construction of cable trench and laying of UG cable in 700 mm deep cable trench... cable & trench etc. The laying of cable from transformer to the ...
REPAIR/MAINT OF 33/11 KV MRS, HT BREAKERS, HT UG CABLES, TRANSFORMERS AND ALLIED HT ELECTRICAL WORKS UNDER GE CLEMENT TOWN, DEHRADUN.
... clean fine river sand for underground cable 8 cm before laying cable and 15 cm after laying and... and punned to 18 cm after laying of cable complete all as specified ...
Hyderabad Division: 1: Provision of CCTV Surveillance System at 17 Goods Sheds - Telecom arrangements.
... and consolidation after laying of cables complete to the finished... per RDSO Sketch No. SDO/CABLE LAYING/003, as directed by engineer ...
Under the Business Plan Scheme 2026-27, work of construction and bifurcation of 11 KV line and strengthening of 33 KV line under power distribution division Muradnagar.
Restoration Of Pit After Laying Of Cable Loop
Under the Business Plan Scheme 2026-27, strengthening work of 11 KV line and strengthening work of LT line under electricity distribution division Muradnagar.
Restoration of pit after laying of cable loop
REPAIR/MAINT/REPLACEMENT OF TRAFFIC LIGHTS, BOLARD LIGHT, GARDEN LIGHT/STRIP LIGHT, FOCUS LIGHT WITH ALLIED WORKS AT 24 ED
... (light grade) fitting for laying of underground cable below plinth protection/hard ...
Signal and Telecommunication work in connection with Replacement of Pipe Line Bridges with RCC Segmental boxes at 32 Bridges over Hubballi Division. ( HPT-BAY - 5 Nos, HPT-VC-SMLI - 21 Nos & BAY-RDG - 6 Nos)
... pipes (50/100mm dia) for cable Metre laying with offset at both ends... pipes with couplings and laying of cables is not included in this ...
REPAIR MAINT OF LT PANEL LT DISTRIBUTION OH LINE UG CABLE MCCBS AND XLPE CABLES AND CONNECTED MISC WORK AT ZONE C AND D AREA AT KALIMPONG AND SHERWANI MIL STN UNDER GE 867 EWS
... wall corrugated for open/underground laying cable, cut to size and making ...
Provision of 10 KVA AT for LC gates No. 146, 131 & 136 in between Ruthiyai-Maksi section of Bhopal Division.
HDPE pipe. (In this work 2 cable will be laying which will be separated by each other)
AUGMENTATION OF ELECTRIC AND WATER SUPPLY DISTRIBUTION SYSTEM WITH CONNECTED AND ALLIED WORK AT S K RANGE AT AF STN HALWARA
... cushioning to protection of underground cables, laid 8 cm before laying and 15 cm after laying of cable, and punned to form an overall ...
Annual Maintenance of Residential and Non Residential Buildings Police Line, Gurugram(2023-24 )
[24.2.4.2]LT CABLE 4.2. Laying of underground cable in pipe /existing open/closed trench etc as required:- 16 Sq mm to 35 sqmm 2 to 4 Core [Through Rate]
Increasing capacity of 33/11kv Sub-stations Nukheda, Jasrathpur, Moiddinpur, Nidhauli, Sakeet, Saronth Etah Under Business Plan 2026-27
... by brick. On both side of cable by laying brick vertically and bricks... includes digging of trenches, laying of cable in under ground trenches, ...
Increasing capacity of 33/11kv Sub-stations Iglas, Aligarh Under Business Plan 2026-27
... by brick. On both side of cable by laying brick vertically and bricks... includes digging of trenches, laying of cable in under ground trenches, ...
REPAIR REPLACEMENT OF VARIOUS DEFECTIVE ITEMS OF LIFTS AND SERVO VOLATAGE STABILIZERS INCLUDING OTHER MISC ITEMS AND REPAIR/REPLACEMENT TO LIFT AT BLOCK NO 56 57 AT BAIRD PLACE AND UNDER GE (U) PM DELHI CANTT10
... with 80 mm layer before laying of cable and 150 mm after laying the cable in trenches/ ducts for cable ...
deposit scheme for utility shifting in connection with the widening of the service road and construction/repair of drains along NH-9in the area of EE, 11KV GZB
Cable Laying/Proper Connection LT XLPE Cable AL. 1X630 sq.mm with complete at various site in all respects as per RESPO norms.
Supply, installation, testing and commissioning of 200 KVA Silent Diesel generator set with allied Electrical installation work at Government College of Engineering and Textile Technology,Serampore, Hooghly
Laying of one no. cable in underground trench as per GS for the following numbers of Cables.
Supply, installation, testing and commissioning of Telecom material in connection with Provision of CCTV cameras at Maksi, Shambhupura, Barayala Chaurasi, Dalauda, Nimbahera and Runija Goods Sheds.
Laying of half round RCC pipe after laying the Metre cables in the trenches. (Cable laying is covered separately)
REPAIR AND REPLACEMENT OF LT ELECTRIC SUPPLY NETWORK AND CONNECTED ITEMS AT JINDRAH UNDER GE ARMY DHAR ROAD
Supply, laying, jointing, testing and commisioning LT underground cable 1100 volts grade XLPE insulated ...
PROVN OF ADDITIONAL HIGH MAST SECURITY LIGHTING ALONGWITH LED LUMINARIES AND IRON SHED FOR DG SET UNDER DIFFERENT LOCATION AT AFS PHALODI
... depth & getting out,for laying underground cable, pipe lines etc. in soft/ ...
Tender for providing SOP to Nagar Panchayat Bhoranj by prov. 1- phase LT Line for installation of street light in Bassi Market on partial turnkey basis under ESD HPSEBL Bhoranj. (ED Barsar)
Laying of PVC Cable 2x25 mm2 Stringing, Sagging of PVC Cable, binding with Insulators and fixing of jumper.
Construction of 33 KV line Industrial Estate from FCI new to Industrial Estate Distt Gorakhpur
Road Restoration Charges (Pakka Road) during cable laying and road cutting.
Construction of 33 KV Line Vikas nagar and construction of one circuit 33 KV line Big bazar from surya hotel to Redisson blu Distt Gorakhpur
Road Restoration Charges (Pakka Road) during cable laying and road cutting.
Construction of 33 KV Buxipur line from Khorabar to Buxipur new Distt Gorakhpur
Road Restoration Charges (Pakka Road) during cable laying and road cutting.
SITC of 4 Lamp PAPI and other GLF works along with interleaving of PAPI units at Calicut International Airport
Laying of cable in cable tray : Laying of one number PVC insulated ...
CONSULTANCY SERVICES FOR 33 KV OVERHEAD TRANSMISSION LINE AND ASSOCIATED SYSTEM FOR CONSTRUCTION POWER REQUIREMENT 2000 TPD COAL TO AMMONIUM NITRATE PROJECT AT LAKHANPUR, JHARSUGUDA (ODISHA)
... Transformer, NER, Busbar erection, Cable laying, Control and protection ...
Maintenance Contract for TG Instruments of CPP
Cable laying on existing tray as per tender scope of work
Rough Cost Estimate for furniture ,computer and CCTV camera ward office Bhupani, ward no 34 Faridabad.
... Camera Box, 19.5` Monitor, cable laying, connecting, installation, ...
27/SE(T)/GNZ/2026-27
Cable laying by drill method HDD single circuit (All the material shall be provided by the contractor except 33kvcables)
Invitation Tender For Annual Repairing and Maintaines of Computers, Printers and Other Devices of Municipal Corporation Chhindwara
LAN Cable Laying/Repair
Installation of 2.5 MVA, 33/3.3 KV Transformer with 33 KV CT and other allied works at Newly Constructed 33/3.3 kV Substation near D1 Belt for Power Supply to CHP Belt Conveyor Motors.
Installation , wiring and testing of control panels including cable laying indoor and outdoor connections .
Dismantling, shifting and re-installation of Automatic Boom Barriers and Weighbridge Centering System (WCS) from existing place to new site at Dipka Expansion Project, Dipka Area.
... & poles at new site. 5). Cable laying of all equipments/devices ...
AMC of CPP Instrumentation and fittings in Boiler Sampling Systems, Fire Detection System and Telephone End Points at CPP, HWP(M)
Cable laying in mtrs as per attached Scope of Work
Increasing Capacity Works
... Making of Chulla for safely laying of cable at incoming switchgear end.... by brick. On both side of cable by laying brick vertically and bricks ...
S&T work in connection with Provision of IBSS between Nuagaon and Bangurkela Station.
... filling and ramming after cable laying as specified in Tech. Circular... issued by CSTE/SER for S&T Cables (Cable laying charges is included). This ...
Annual Operation, Maintenance and Providing Civil and Electrical Maintenance (including Facility Management Services) for Office and Residential Complex at Krishnashila Area for 2 years
Supply and Fabrication of 100 mm GI Pipe for underground cable laying and other purposes as per Instructions of EIC on as and when required basis with welding work (if required).
PROVISION OF CONCRETE PATHWAY AT CG LAND BAJPE AND CGRA KANKANADY AND PROVISION OF FALSE CEILING IN ADMIN BLDG CGOM MI ROOM AND IN LIVING BLOCK AT OTM ACCOMMODATION AT BAJPE UNDER AGE I MANGALORE
M&L for Sand cushioning to underground cables 8cm thick before laying cable and 15cm thick after laying ...
Replacement of LED lights and allied work at Pise Complex
Supply of 3.5 Core 70 Sq. mm Aluminium armour cable, Excavation, laying, termination & Refiling trench as per scope of work.
Capacity Enhancement project Phase II at Fly Ash Handling System of Unit 7 Under AHP EM DPPS DPL
Dismantling of existing 3 Core 185 mm² cable & Transportation, Laying of 3 Core 240 mm². Al Armoured cable
REPAIR/MAINTENANCE OF PUMPS MOTOR , CLEANING OF SEMI UNDER GROUND WATER TANKS AND REPLACEMENT OF WATER SUPPLY LINES AND OTHER CONNECTED WORKS AT HQ CIF (R ) AND SIGNAL REGT UNDER AGE(I) CIF (R )
... deep in soft/loose soil for laying of underground cable, foundation of poles & stays ...
BHADSHAH BAG COLONY STHIT BADSHAH PARK ME PRAKRAM THIM PARK KA NIRMAN KARY
Providing and laying armoured underground cable from DB to bollard pathway ...
TELECOM WORKS In CONNECTION WITH "(1) Surat-Vadodara: Increasing CSR of Loop Line at Miyagam Karjan. (2) Increasing CSR of Lines at Kharsaliya and Ranoli Stations. (3) Vadodara Yard: Raising Speed of By-pass Line from 10 KMPH to 50 KMPH. (4) Vadodara Division: UTRAN - Development of Station for Terminating / Originating of Train. (5) Vadodara Division: Increasing CRS of Lines at Bajwa, Adas Road, Uttarsanda & Mahemdavad. (6) Palej: Provision of Foot-Over-Bridge 6.10M wide at. (7) Vadodara Division: Anand - Provision of Ballastless Track on Platform No. 5 for development. (8) Bharuch: Extension of PF-1. (9) Vishwamitri: Proposed 6.10M wide FOB on replacement account. (10) Vadodara Division: Utran BG - Extension of High Level Platform and widening of DN Platform for making Passenger fit at Utran Railway Station".
... per RDSO drawings No. SDO/cable laying/011 and SDO/cable laying/012, issued vide RDSO document ...