Loading…
Loading…
16,976 results • Best match
Replacement of One number of Main cable to Trauma Building at R.G.Kar MCH.
Laying of cable above 3½ core 400 sqmm on ...
Electrical work in connection with Provision of Ramp for FOB under Harmonized guideline for Divyangjan Facilities at 54 stations (Total 108 Ramps) and Improvement of sub-station building in different Sub-Station over LJN- DIV.
... trench 31 etc. as required. Cable laying should be as per IS-1255/1983... 1000 mm and 350 mm wide for laying of cable with supply and placing ...
replacing existing plate earthing with new mat earthing and providing connectivity for the existing yard equipments with the new mat earth
... slabs/ chequered plate from cable trench for laying cable and placing the slabs carefully... in orginal position after cable laying work is completed (cost ...
SITC of Silent DG set with Separate AMF panel for power backup system incl. allied EI works at 50 capacity Matigara Children Home for Girls, Matigara, Darjeeling.
Cable & Cable Laying
For New Connection 120 kw, LMV 11, Vehicle Charging Station Panitanki Ramnagar AND for New Connection 150 KW, LMV 11, Vehicle Charging Station Newada Sundarpur near Mahila Polytechnic VNS
Cable Laying by Digging/Drilling)(L/S)
AMC of 33KV lines under ADEE(G)/TATA jurisdiction for a period of 3 years: (i) 33KV line from RKSN Grid to SINI (distance approx. 16 km) & (ii) 33KV line from KNPS Grid to DPS (distance approx. 16 km)
(150 NB) for vertical cable laying in air.
For Rewinding and Repairing of lighting Transformer 50KVA 550V/440V at Sl.No. BSP/TR/50/LT/5 at Basdeopur Colliery under Sijua Area
Secondary side cable laying 70 Sqmm &connection & lags etc.
For the extension of 6.6KV(58 feeder) O/H from Kankanee Durga Mandir to OCP Patch D for installation of pump for dewatering at Kankanee Colliery under Sijua Area
Cable laying 185 sq/mm
Providing and fixing LED light at 220 KV Sub-Station BITHOOR Under ETD-I Kanpur
... including required 4/2 core cable laying of junction box to LED fitting ...
57/SE(T)/LCZ/2026-27
S/C 11 KV 3x185 sqmm Cable laying in Metalic/Damar/normal ...
Design, Engineering, Manufacture, Inspection, Testing at works, Delivery, Installation and Commissioning of severe Accident Parameter Monitoring Systems (SAPMS) in Onsite Emergency Support Centre (OESC) of KKNPP Site
... soil and levelling after cable laying and repalcement with sand/crusher ...
11KV line construction and bifurcation related work under EDC Dhampur in BP-2026-27
Laying of HDPE Pipe 120 mm mm, XLPE Cable with HDD (trenchless) method including cable laying.
Work for Installation of RMU under semi turn key basisi in EDD- Bindki, Fatehpur
HT XLPE Cable laying Manual Method.
Installation and Dismantling of Battery and Power Plant And Supply Of Power Cable, Lugs etc. For Raipur BA under Chhattisgarh Circle
AC/DC CABLE LAYING from CSEB supply to power ...
CA NO. GE (AF)/SGR-50/2026-27 REPAIR / MAINTENANCE OF CABLING, JUNCTION BOX, STREET LIGHTS, PERIMETER LIGHTS, TIMER SWITCHES AT TECHNICAL AREA UNDER GE (AF) SRINAGAR.
... consolidation 8 cm thick before laying the cable and 15 cm of the sand after laying the cable but will be measured 18 ...
PROVN OF STANDBY POWER SUPPLY AT AFS UNDER GE(AF) SAMBRA.
Supply, laying and testing cable XLPE Insulated ,screened, ...
Electrical work connection to (i) RCC overhead tank 50000 gallon capacity with Sinking of Tube well and improvement of pipe line (01No) at BTT. (ii) Widening of Road near 128A for truck movement and approach road at railway land at DEOS. (iii) Provision of New Tower wagon shed at Chauri Chaura.
arrangement. Cable laying work shall be governed by IS :1255/1983.(cable supplied by Railway).
S&T work in connection with the construction of RHS between Km 283/5 - Km 283/7 towards JOC end at Adra in Adra Division.
... width as per Drg. No.SDO/Cable laying/007 (Annexure-10), as detailed... 'Guidelines on signalling cable laying, with the following modification ...
SPECIAL REPAIR/ REPLACEMENT OF LT OVERHEAD LINE TO LT UNDERGROUND CABLE AND CONNECTED ITEMS IN OTM UNIT AREA UNDER GE SAUGOR
... cable , 80 mm thick before laying the cable and after laying the cable complete all as specified ...
Work of Deposit Scheme against passed estimate from Retender under of EDD- KAIRANA under EDC,Shamli
... 0.45Mtr. x1.05 Mtr. and Laying cable in trench and Providing ...
Part(A):Banapura Balance Works of Station Building, Raising & Extension of PF No.2 & 3 BAY COP Work, parking area construction of boundary wall. Part(B):Bhopal Division: Provision of FOB at 5 Nos NSG 6 stations (PAL, CRK, PGL, DKI & DRA) in ET-KNW section. Part(C):Khirkiya Extension of UP Platform towards KNW- end, development of Circulating Area, provision of 3 Bay COP on extended PF and other amenities Part(D):BPL Div- Improvement of divyangjan facilities at SHRN, HD, NSZ, ET NDPM, SCI, BHS, BAQ, BINA, GUNA & SVPI stations
3 200003 Cable laying under concrete road/Track (Note: Metre 10.00 613.25 6132.50
Diversion / Relocation of UG cable with structure of WBSEDCL to facilitate construction of 3rd Lane of Link Road under Bidhannagar-I Division
... submission of drawing for such cable laying (As per Office Order No ...
SPECIAL REPAIR/ REPLACEMENT OF E/M INFRASRUCTURE AT RUDRAPRAYAG AND GAUCHER UNDER GE 871 EWS
... cushioning to protection of underground cables, laid 8 Cm before laying and 15 Cm after laying of cable, and punned to form an overall ...
Rehabilitation and reliability improvement of various S&T gears in block sections of HJP-SPJ section over SEE Division.
... RFID marker locator in new cable laying & existing cable laying route with Digital mapping ...
SPL REPAIR TO BLDG NO P-159 AND P 144 AT CHAUBATTIA UNDER GE RANIKHET
M&L for sand cushioning in trenches spreading and consolidation 8cm thick before laying the cable & 15 cm of sand after laying the cable complete all as specified
S&T portion of outdoor work for (1) construction of 02No. LHS on LC No. 107 &128 in Chakulia - Rakhamines section. (2) construction of 01 Nos. LHS on LC No. 84 in Jhargram - Chakulia section.
... filling and ramming after cable laying as specified in Technical... platform/pucca road after cable laying.
CONSTRUCTION OF NEW 33by11 KV (2X5 MVA) SS SONIK II AT DISTT UNNAO
HT Cable Laying :
Sriperumbudur 110/33-11KV SS.
... including replacment of existing cables, laying new cables, bunching, routing, Glanding ...
8808/E8- REPAIR / MAINT/ REPLACEMENT STREET LIGHTS, PERIMETER LIGHTS, GARDEN LIGHTS, DECORATIVE LIGHTS AND CONNECTED WORKS AT NTS TEYLERABAD, MARCOS, NAD/DAD/CHOULDHARI PUMP HOUSE, FILTRATION PLANT, INS UTKROSH, RUNWAY PERIPHERY AND VAYU VIHAR AND
Excavation in soft / loose soil not exceeding 1.5 mtr wide and n exc 1.5 mtr depth and getting out incl forming of bottom for laying cable all as specified and directed
UPGRADATION OF LUNCH ROOM AT DMDE, RELOCATION AND INSTALLATION OF THE EXISTING EXTERNAL ELECTRICAL SERVICES AT CHESS LASER COMPLEX KANCHANBAGH UNDER GE (I) RND KANCHANBAGH
Sand cushioning to underground cables 8cm thick before laying cable and 15cm thick after lying ...
Work under Business Plan 2026-27 against approved Estimate (28 No.) in edsd 1st and 2nd under EDD-Oon.
Construction of 33 KV/ 11 KV / LT Over head / Underground Line as per RESPO norms :- Cable laying by sand and bricks Various type 33KV /11 KV and LT XLPE cable trench less (HDD Method)
Design,Modification,Supply,Installation,Testing and Commissioning of Existing HiMA make Electronic Interlocking (EI) System at Bhuj for Tower wagin siding & Naliya station, in connection with New BG line between Naliya- Vayor, Naliya- Jakhau along with miscellaneous Outdoor Signaling and Telecom work in Bhuj- Naliya section on Ahmedabad Division of Western Railway.
... with DIN 53438 Part-II for laying signaling/telecom cables, channel attachable t o... cover, as per RDSO STS/E/cable laying Precise Vol-IV and as per ...
As described in BOQ
... of sand (8cm deep before laying the cable and 15 cm deep after laying the cable i.e. total 23 cm.) NOTE:- ...
SPECIAL REPAIRS, REPLACEMENT OF RCC POLE TO OCTAGONAL POLE AT THE MARATHA LIRC AND CONNECTED LOC AND PROVISION OF CHEMICAL EARTHING AT BLDG NO T-14 LABORATORY, P-32 OT AND ICU 2 MH OF MH UNDER GE BELGAUM
... 0.75m deep suitable for laying underground cables /GI tubes of any size / ...
Provision of Clocks at NSG-3, NSG-4, NSG-5 & NSG-6 Category stations over UMB Division
Laying of Data cable/Communication cable/ Power ...
Provision of Clocks at NSG-3, NSG-4, NSG-5 & NSG-6 Category stations over UMB Division
Laying of Data cable/Communication cable/ Power ...
S&T Work in connection with the improvement of the yard under the jurisdiction of SSE(P.way)/BKSC in Adra Division.
... filling and ramming after cable laying as specified in Tech. Circular... Platform/Pucca road after cable laying. Inspection : Representative ...
S&T work in connection with the improvement of yard under the jurisdiction of SSE(P.way)Adra East in Adra Division.
... filling and ramming after cable laying as specified in Tech. Circular... Platform/Pucca road after cable laying. Inspection : Representative ...
S&T work in connection with the installation of Electronic In-Motion Weigh-Bridge (EIMWB) at four (04) nos of stations (Viz Kustaur, Mahuda, Khanoodih & Radhagaon) in Adra division.
... filling and ramming after cable laying as specified in Technical... platform/pucca road after cable laying.
Formation of Desilting of Infiltration wells and Intake wells and Replacement of cables of CWSS to Villukuriand CWSS to Gnanam
Laying the above cable as per IE rules from the between Transformer to the panel board below Ground level
SITC of 165 KW, LRS set no.2,3and7 installed at Bharat Nagar SPS
Laying of control cable on wall/ surface / under trench as required at site for auto controlling of LRS
Supply, Installation, Operation,Maintenance of SDWAN Solution for Various Police Stations under the jurisdiction of West Bengal Police
Laying of Cat6 cable
Provision of Panel Room in various station of Jabalpur division
"Pucca Cable trench: Construction of cable trench and laying of UG cable in 700 mm deep cable
Work Related Electrical Network Modification on Road Under EDD(South), Dehradun.
LAYING OF AB CABLE OF SIZE 3x120 SQMM
S.I.T.C of Air Conditioning System at different Ejlases under District Court Campus Asansol ,Paschim Bardhaman..Electrical Installation Work..
I. CABLE AND CABLE LAYING :
REPAIR / REPLACEMENT/ MAINT OF E/M SWITCH GEARS, APFC EQUIPMENTS, CONTROL EQUIPMENTS AND CONNECTED EARTHING AT DOMESTIC AND TECHNICAL AREA AT AFS SULUR
... protection to under ground cables laying across the cable complete all as specified ...
INCREASING CAPACITY OF 33by11 KV SS BARGANWA (FROM 2X5TO 3X5 MVA) and 33by11KV SS HUSAINGANJ RURAL (FROM 2X10TO 2X10plus1X5 MVA) AT DISTT SITAPUR
HT Cable Laying :
Electrical work in connection with provision of Electronics interlocking under remodilling work at LJN yard, Proposal for extension of electric loco shed at Lucknow Jn. yard, CYM Building at coaching Depot ASH, Development of goods platform surface, fencing etc. at Pardhan and approach road at BKT Railway Stn, Provision of 6 Mtr. FOB at Aishbagh under ABSS, Construction of 50 Beded Mahila RPF barrack at Aishbagh, Provision of Goods Terminal at PD & BKT and Infrastructure improvement in Div. Store Depot at Malhaur.
... dia in the bore and the laying of cables in the bore and the laying of cables in the bore under the track/road. ...
Electrical work in connection with provision of Electronics interlocking under remodeling work at LJN yard, Proposal for extension of electric loco shed at Lucknow Jn. yard, CYM Building at coaching Depot ASH and development of goods platform surface, fencing etc. at Pardhan and approach road at BKT Railway Stn.
... dia in the bore and the laying of cables in the bore and the laying of cables in the bore under the track/road. ...
At BBLA - Provision of additional IRS type shed (16.00 M X5.00M) over PF ( 12 Nos) with PF bench under PF shed, Provision of water booth with pipe water supply, for additional Passenger amenities with all other ancillary works under SSE/W/BT.
"Trenching and laying of cable underground by soil cutting through ...