Loading…
Loading…
16,985 results • Best match
Electrical work in connection with provision of Electronics interlocking under remodeling work at LJN yard, Proposal for extension of electric loco shed at Lucknow Jn. yard, CYM Building at coaching Depot ASH and development of goods platform surface, fencing etc. at Pardhan and approach road at BKT Railway Stn.
... dia in the bore and the laying of cables in the bore and the laying of cables in the bore under the track/road. ...
At BBLA - Provision of additional IRS type shed (16.00 M X5.00M) over PF ( 12 Nos) with PF bench under PF shed, Provision of water booth with pipe water supply, for additional Passenger amenities with all other ancillary works under SSE/W/BT.
"Trenching and laying of cable underground by soil cutting through ...
REPAIRS AND MAINTENANCE OF LT DISTRIBUTION NETWORK INCLUDING CABLES, LT DISTRIBUTION PANEL BOARD AT VARIOUS LOCATION OF SITE A1 OF NAVAL BASE AREA KARWAR.
Supply and Laying LT UG cable 1100 Volts grade XLPE insulated ...
Special repair to Bldg No P-13 (OR Institute, Bldg No P-29 and P-30 (Cook Houses) of Guards at Suratgarh Mil Stn under GE(A) Suratgarh
... poles, struts, stays etc. or laying underground cable etc. in soft/loose soil, ...
REPAIR/MAINT OF EXTERNAL ELECTRIC LT DISTRIBUTION SYSTEM AT KHANABAL UNDER GE 861 EWS
... clean fine river sand for underground cable 8 cm before laying cable and 15 cm after laying and... and punned to 18 cm after laying of cable complete all as spefied ...
Arrangement for Illumination and Providing of Un-Interrupted Power Supply to Transit Base Camp at FCI Godown Mirbazaar and Transit Base Camp at Walnut Factory Qazigund by way operation and maintenance of DG Sets, LED lights etc for SANJY 2026
... of PVC 16SQMM twin core cable including laying and fixing of same as Service ...
Malappuram Package No.5 - Supply and Construction of 11 kV Lines using UG cable for the Development of Distribution Infrastructure on a Turnkey Basis under the Dyuthi Special Scheme at Various Locations under the EC, Manjeri(Re-tender/2nd Invitation)
Excavation of cable trench in all classes of soil and backfilling after laying of cable (excluding laying of cable).
Under the Business Plan Scheme 2026-27, work of construction and bifurcation of 11 KV line and strengthening of 33 KV line under electricity distribution division Modinagar.
RESTORATION OF PIT AFTER LAYING OF CABLE LOOP
MISCELLANEOUS ELECTRICAL REPAIRING WORKS AT DIFFERENT AREA OF STATION NO. 4 UNDER TPS.
Laying through Underground Trech.(a)Laying of one No. cable upto 35 sqmm in underground ...
EI work for Proposed New Toilet Block at Diamond Harbour Court Complex at Diamond Harbour in the District of South 24 Parganas under Diamond Harbour Eletrical Sub-Division, PWD.
SUPPLY & LAYING CABLE Supply of 1.1 KV grade 2/4 Core XLPE/PVC Insulated & Sheathed Armoured Aluminium Conductor cables of following sizes [Make : Havells / Gloster/Polycab] 2 core 10 Sqmm
"(i) Soft up gradation of CPH, KRBA, AKT, NIA & BUA station through Amrit Bharat Station Scheme phase-II. (ii) Soft up gradation work of BRJN & BPH stations through Amrit Bharat Station Scheme phase-II. (iii) Development of second entry and modernisation of all platforms along with all alied facilities at Uslapur Railway Station. (iv) Soft Upgradation of all platforms of AKT, NIA, CPH, BUA, RIG, BPH, BRJN & KRBA Railway Stations."
Laying of cable of lower size ( upto Metre ...
REPAIR MAINTENANCE OF LT EXTERNAL ELECTRIC SUPPLY AT INS PALLAVA UNDER GE NAVY CHENNAI
Excavation in trenches not exceeding 1.5 mtrs wide and not exceeding 1.5 mtr deep in hard /dense soil for laying underground cables, laying pipes etc. complete all as specified and directed.
SPL REPAIR TO BLDG NO P-68 AT MH KAMPTEE
... poles, structures, stay rods, laying of underground cable etc complete all as specified ...
Construction of New Substation
... by brick. On both side of cable by laying brick vertically and bricks... includes digging of trenches, laying of cable in under ground trenches, ...
Provision of New Electronic Interlocking work at Jhantipahari (JPH) station in connection with dismantling of UP and DN main line cross over & one UP Passenger platform & one Goods shed line in Adra Division of South Eastern Railway.
... filling and ramming after cable laying as specified in Technical... issued by CSTE/SER for S&T Cables (Cable laying charges is also included).This ...
SPECIAL REPAIR/REPLACEMENT OF BER TRANSFROMER AND ALLIED WORKS AT AF STN BAMRAULI
Supply & laying cable XLPE Insulated screened ...
Conversion of 33 kV OH line crossing across NH6 by micro tunneling with 200 mm dia HDPE pipe PE 80 PN6 and lay of 33 kV 400 sq mm Kona Kona TT feeder nr Nibra More under Howrah1 Division
Micro Tunnel with 200mm Dai PE 80Pn 6 HDPE Pipe Including laying of XLPE Cable
Construction of 44 beds Running Room building at WMY/VSKP in the section of SSE/W/MPM/WAT under the jurisdiction of ADEN/Estate/WAT.
... incharge to work site. & laying of cable shall be completed with contractors men & materials. The cable laying shall be in accordance with ...
INSTRUMENTATION WORKS FOR EPCM2 SERVICES FOR RPTU UNIT FOR NUMALIGARH REFINERY EXPANSION PROJECT NREP NUMALIGARH ASSAM GROUP B
... contractor's(bidder) scope. Cable pulling, Laying / Installation work includes... test results etc.). While laying the cable/multicable drum shall be ...
Installation of CCTV Camera at Coaching Depot BJU & Freight Depot GHZ
CAT-6 UTP Cable (Indoor laying inside building) Above/
GENERAL-Maintenance of LAN-Maintenance of LAN in PWD Buildings Sub Division, Mannarkkad Palakkad.-General Electronics Work
OD292368/2025-2026:Dismantling of old cable and laying through existing conduit.
SUPPLY AND DELIVERY LED LIGHT FITTING INVARIOUS PARTS OF WARD NO-96 BR-X.
Laying through RCC/Hume/GI Pipe.(a)Laying only Cable upto 50 sqmm through existing RCC/Hume/ GI Pipe/open masonary trench FOR single, 2, 3, 3... & 4 core
INSTALLATION OF DECORATIVE FITTING FOR BAPUJINAGAR BOROPUKUR AND SURROUNDING AREAS IN WARD NO-96 BR-X.
Laying through RCC/Hume/GI Pipe.(a)Laying only Cable upto 50 sqmm through existing RCC/Hume/ GI Pipe/open masonary trench FOR single, 2, 3, 3... & 4 core
SITC of Hooter System
... sqmm Aluminium armoured cable including laying of armored power and signal ...
Replacement of power supply arrangement at P.H. No. High Lift of Chandpara Ground water based W/S Scheme under EMSD-I, PHE Dte. in 24 Pgs. (N).
Laying of cable as in item no.1 on wall/surface ...
S/D and installation of MCC Panel and valve set for Augmentation Tubewell at PH No-II Zone-I in connection to accomodate FHTC under Gobindapur ground water based water supply scheme under Block_Shantipur Dist- Nadia under under EMD, PHE Dte.
Installation of Above pumping machinery and MCC panel on wall and laying of cable using gland socket and connetion of power to MCC Panel from KIT-KAT Fuse unit as per direction of EIC
S/D and installation of MCC Panel and valve set for Augmentation Tubewell at PH No-I Zone-I in connection to accomodate FHTC under Gobindapur ground water based water supply scheme under Block_Shantipur Dist- Nadia under under EMD, PHE Dte.
Installation of Above pumping machinery and MCC panel on wall and laying of cable using gland socket and connetion of power to MCC Panel from KIT-KAT Fuse unit as per direction of EIC
8813/E8- REPAIR / MAINT OF LT DISTRIBUTION SYSTEM, LT PANELS, MCCBs, LT UG CABLES, CHANGE OVER SWITCHES AND CONNECTED WORKS AT INS UTKROSH AND VAYU VIHAR, NTS TEYLERABAD, MARCOS, NAD, DAD DOLLYGUNJ, CHOULDHARI PUMP HOUSE, PORT MOUT AND WTP PROTHRAPUR
Excavation in soft / loose soil not exceeding 1.5 mtr wide and n exc 1.5 mtr depth and getting out incl forming of bottom for laying cable all as specified and directed by Engr-in-Charge.
Fiber Cable work for CTVS Building at SMS Hospital, Jaipur
... item no. 11.1 to 11.4 for Laying Charges for cable through Manual Boggi by... repairing the pit after laying of cable with PCC/ Bitumin as required.
Installation of Submersible pumping Machineries at newly sunk Tube Well No III and allieds works at Augmentation of Haridaspur Piped Water Supply Scheme Block Nalhati I under Bolpur Mechanical Division
... wall after necessary power cable connection after laying of cable on wall with using saddles ...
Tender for providing SOP for pumping machinery for drip irrigation system in Sanour Cluster Part-II under HP Shiva Project by water user association Sanour from already proposed 63 KVA, 11/0.4 KV S/Stn. Sanour Nalah in (E) section Kandrour.
... stringing and sagging of LT AB Cable:-Laying of AB Cable, Installation of Suspension ...
Electrification work of all instrumentation Rooms at downstream of Kadra Dam Site
... Depth upto 0.6 Mtr (for LT cable laying) including trial pits, depositing ...
PROVISION OF LIVING ACCOMMODATION FOR HALF DSC PLATOON IN VARUNA RESIDENTIAL COMPLEX AT NPOL, KOCHI
... trenches below 8cm laid before laying of cable and 15cm sand cable laid after laying the cable and around underground cables for cushioning of ...
As per tender documents
... unwashed dry river sand for underground cable 8 cm before laying cable and 15 cm after laying and ...
The work of locating underground 33 kV and 11 kV faults through detector and rectifying them.
Replacement of 33 KV damaged cable (cable shall be provided by the department). Laying of cable in tranch after making joint and filling of sand/brick/soil/as per site requirement.
Procurement of High-Mast (Design, Manufacturing, Supply, Multiple Loading/ Unloading, Installation, Testing, Commissioning and Maintenance During Warranty Period) between VR-DRD Section under MUTP-III.
Excavation of cable trench in soil & filling the trench with sand, pebbles etc. after laying of the cable complete with RCC warning cover & cable markes, sand etc. as per requirement.
Arrangement for a dedicated power source connection of about 50 kW load for the X-ray service at Dinhata Sub-Divisional Hospital, Cooch Behar.
SUB-HEAD 2--Supplying & Laying of Cable
"S&T work in connetion with "Proposal for construction of Road over Bridge in lieu of LC No.- 03 at KM: 09/15-16 between Ramganj Mandi and Julmi station of RMA- JLWC section."
... over pieces of signalling cable. Laying of cable pieces shall be covered in laying of cable item.
SPL REPAIR TO BLDG NO P-151 (OR MD ACCN) AND PROVN OF MOBILIZATION OF EQUIPMENT STORE NEAR BLDG NO P-26C OF 232 FD WKSP COY EME AT CHAUBATTIA UNDER GE RANIKHET
M&L for sand cushioning in trenches spreading and consolidation 8cm thick before laying the cable & 15 cm of sand after laying the cable complete all as specified
Reorganisation and Illumination Enhancement of Temple Premises through Installation of Decorative Lighting of GM Establishment, IB Valley Area
... with latest amendment for cable laying.
Installation of CCTV Cameras in the Premises of Chandernagore Banga Vidyalaya
Supply & Delivery of LAN Cable [ Specification:- CAT 6 UTP LAN Cable including laying charges ( Casing/Piping & all cabling materials) ] [ Make: Molex/D-Link/Commoscope ]
ELECTRICAL WORK AT THAZHANKUPPAM CPS SCHOOL, SVM NAGAR CPS SCHOOL, KATHIVAKKAM CMS SCHOOL, MAAKALAIAMMAN KOVIL SCHOOLCHS IN DIVISION -01,02 AND 4 AT UNIT-01,ZONE-01.
Laying of cable along road / street through 50mm O..., HDPE pipe (trench size 45cm width x 75 cm depth)
Supply And Construction of HT, L/T and TF for Giving Service Connection in EDSD I Almora Under UERC Head 2025-26
Laying AB Cable 1 Phase LT Line
El.D.C.No.North/332/2026/ Supply and Erection of 53 Nos of 7 Mtr lamp posts and 24 Nos of 9.5 Mtr lamp posts with LED fittings at Ulaganathapuram, Chinnakuppam, Kasi koil Kuppam and various laocations in Div 1,2,3, Zone 1
Laying of cable along road / street through 50mm OD, HDPE pipe (trench size 45cm width x 75 cm depth)
El.D.C.No.South/0793/2026 Supply and Erection of 40 Nos of 7/9.5 Mtr street lamp post with LED fittings at Arcot Road from Porur Junction to Alappakkam Main Road Junction in Dn 150 Zone 11 Deposit Work CMRL
Laying of cable along road / street through 50mm OD, HDPE pipe (trench size 45cm width x 75 cm depth)
SPL REPAIR TO UG CABLES AND CONNECTED ITEMS AT TECHNICAL AREA AT AF STN DINJAN UNDER GE (AF) MOHANBARI
Supply, laying & testing cable XLPE insulated, screened, ...
RESTORATION OF DAMAGED ELECTRICAL DISTRIBUTION WIRING AND LIGHTING SYSTEM DUE TO HEAVY STORM AND RAINFALL AT DIFFERENT LOCATIONS IN EWS.
... with Saddles / clamps.(a)Laying of cable upto 2 core 25 sqmm on wall/surface ...
SUPPLYING AND PROVIDING MATERIAL
Supplying and Laying armoured cable 4C X 6 sq.mm
Supplying Electrical Materials And Repair Maintenance Services At. Grampanchayat Khalumbre Tal Khed Dist Pune
Supplying & Laying armoured cable 4C X 6 Sq.mm.
THROUGH RENOVATION OF DAMAGED ILLUMINATION SYSTEM OF CLARIFLOCCULATOR NO-1 AND 3 AT WTP-II WITH OTHER ALLIED WORKS INSIDE CLEAR WTER CAMPUS GRWW.
... with Saddles / clamps.(b)Laying of cable upto 3/4 core 25 sqmm on ...