Loading…
Loading…
2,132 live2,591 closing this weekmost from E-IN-C BRANCH - MILITARY ENGINEER SERVICES and PWD
2,132 results • Best match
ADDN/ALTN OF PQC ROAD INCLUDING INTERLOCKING OF TILES AT DAD COLONY JAMNAGAR AT BG LINES MILITARY STATION JAMNAGAR
... 5 mm), including making drainage opening wherever required ...
CONSTRUCTION OF TECH BLDG ALONGWITH ALLIED INFRASTRUCTURE AT LAMAYURU
Total amount of Sch ‘A’ Part - VI (AREA DRAINAGE)
Construction of Road from Egarkund south panchayat Harimandir Nakara Kanali Modak basti via Raju sah , Tilak Dhobi home to G.T road .(L-0.650 Km.)
Construction of dry rubble flooring at cross drainage works for relatively less important works.
Medical College and Hospital, kolkata-Emergent work for provision of Ramp at Entrance of Anatomy building including some allied works during the year 2026-2027.
... 5 mm), including making drainage opening wherever required ...
Construction of Road from Katajhar Pather Kahitama Road starting from South side of Burha Dolong to Oxiguri Pather at Athikhari village in Baksa District for the year 2025-26. TN-398-2.
Drainage spouts complete as per drawing and Technical Specification Clause 1209.
Construction of Road from Uttar Barapeta Naamghar to Katajhar Kahitama Road in Baksa District for the year 2025-26. TN-398-3
Drainage spouts complete as per drawing and Technical Specification Clause 1209.
Protection of Pub-Barala, Balapara and its adjoining areas on both banks of river Kaldia.
Earth work in excavation of drainage channel to the proper grade ...
Construction of compost pit windrows for the processing of 05 TPD of wet waste.
Earthwork, Erosion Control and Drainage
Constt. Of CSC near shiv mandir kalian da mhalla wno 5
Providing and fixing 110mm dia. PVC waste water / sewerage pipe of 4 kg pressure per sqm of supreme / prince/ finoeix make prakash surya
BID DOCUMENTS FOR RENOVATION OF EXISTING 8.50 MLD WATER TREATMENT PLANT AT POWER HOUSE WATER WORKS, CONSTRUCTION OF SECURITY CABIN, CC ROAD AND COMPOUND WALL PAINTING AT UMARGAM. DIST VALSAD.
1 352.00 Excavation for pipe line trenches for water supply, sewerage line, manhole
Construction of Multipurpose Hall with 1 Room annexe with Toilet Facility at Manipur Zoological Garden Qtr., Complex Facility, Iroisemba, Imphal-West, Manipur Covering a Plinth Area of 436.24 Sq.mt.
F. INSPECTION CHAMBERS & EXTERNAL DRAINAGE
Proposed Construction of Multipurpose Hall with 1 Room annexe with Toilet Facility at Forest Office Complex, Mantripukhri, Imphal East District, Manipur Covering a Plinth Area of 436.24 Sqm.
F. INSPECTION CHAMBERS & EXTERNAL DRAINAGE
PROVN OF CERTAIN AIR RAID SHELTERS AT 1 WG AF STN SRINAGAR
Sch 'A' Part-V ( Area Drainage) Note:- Prepriced at par with SSR Part-II (2020) at Serial Page No 28 and contractor has to quote the estimated amount under Col 6
Shivpur ward no-9 me jay durga nagar kadipur mukhya marg par manoj kumar singh ke ghar se paschim disha ko jane vali sadak rajesh kumar ke ghar se hote hue vivekanand jha ke ghar tak tatha uttar me ramakant dube ke ghar se krishanand pandey ke ghar t
Supply and fixing of PVC pipe 110 mm dia ISI mark for drainage SI no.23(31) SOR 2020 p.no. 10 Rate=225x1.1=247.50
Sarnath ward me shrilanka gest house se STC towar se anand shrivastav ke ghar se SA 14/67-S A-3 se hote hue suman yadav ke ghar tak KC dren v pich nirman karya
Supply and fixing of PVC pipe 110 mm dia ISI mark for drainage SI no.23(31) SOR 2020 p.no. 10 Rate=225x1.1=247.50
SPL REPAIR TO CERTAIN INTERNAL RDS IN MD ACCN GFA, OGFA, THELA GROUND, USMAN RD UNDER GE (WEST) LUCKNOW.
... necessary excavation making drainage opening wherever required ...
Sundarpur satti chauraha se dhirendra mahila PG college hote hue panchkoshi tirahe tak men road par ek kot penting ka karya sath me lagi KC dren interlocking karya
Supply and fixing of PVC pipe 110 mm dia ISI mark for drainage SI no.23(31) SOR 2020 p.no. 10 Rate=225x1.1=247.50
PROVN OF APPROACH PATH FOR CERTAIN MD ACCN IN AJMER LINE AND PROVN OF HARDSTANDING AT FIELD WKSP COMPANY UNDER THE AREA OF AGE B/R-I OF GE (ARMY) No 1 JODHPUR.
... 5 mm), including making drainage opening wherever requiredcomplete ...
Sankul dhara pokhara se khojhava bazar pustkalay hote hue rammandir tak men road par ek kot penting ka karya gali me KC dren interlocking nirman karya
Supply and fixing of PVC pipe 110 mm dia ISI mark for drainage SI no.23(31) SOR 2020 p.no. 10 Rate=225x1.1=247.50
GENERAL RM 2026 27 RC 2 Zone 4 Palode Roads Section Zone 4 One Year Running Contract RC for Various PWD Roads 2 roads for a length of 1100 m under Roads Section Palode in TVM District General Civil Work
OD62028/2026-2027:Engaging mazdoor for cleaning chocked culvert and drainage and wood cutting works etc. complete asper the direction of department officers at site.
Special Repairs to UPVC Partition and sink arrangements in Ground floor Triage and Welcome Desk in TAEI Ward in Tirunelveli Medical College Hospital at Tirunelveli
... desinged such that the water drainage does not pass through the ...
A/R and M/O to various road under PWD division South East Road-1 during 2026-27. (SH -Providing manholes and bellmouths at various roads under South East Road 14)_RECALL
... of size 100x50x50 cm for drainage pipe under footpath, including ...
Construction / Upgradation of Bridges under Pradhan Mantri Gram Sadak Yojna including maintenance for Five Year after construction-PMJANMAN
Drainage Spouts complete as per MoRT&H standard drawing and Technical specificationand as per clause 2705 of specifications
Construction of PCC Road and culvert from Simradih maszid to house of khlil miyan, At-Chiridiri, GP-Chiridiri, Block-Kanhachatti, Estimate cost-5290300
Construction of dry rubble flooring at cross drainage works for relatively less important works. S.O.R. Item No. 16.09
Construction of PCC Road from house of Sanjay Paswan to Murtiya tola prathmic vidalaya deoriya, At-Deoriya, GP-Deoriya, Block-Chatrar, Estimate cost-6672900
Construction of dry rubble flooring at cross drainage works for relatively less important works. S.O.R. Item No. 16.09
RESTORATION OF ROAD SURFACE ALONG GANGA PRASAD MUKHERJEE ROAD FROM XING OF CHAKRABERIA ROAD (S) TO XING OF GIRISH MUKHERJEE ROAD IN WARD NO -072.
SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE ...
MC and EW (CAM) to Restoration of Stepped Tank at Hemadpanthi Temple of Shree Mahadev (Taponeshwar), Tapona, Dist. Yavatmal.
... during execution, temporary drainage arrangements, deployment ...
Construction / Upgradation of Road/ CD works including maintenance for Five Year after construction. RBR-Bridges
Drainage Spout
Maintenance and repair of Dy-2(L) of TMLC from 29.28 km to 35.813 km including Cross Bundh (6 nos) and also Minor-8(R) of Dy-2(L) of TMLC from 0.00 km to 0.94 km for ensuing Boro Irrigation within Sadar Block, P.S. Kotwali, District Jalpaiguri during
... re-excavation / silt clearance of drainage channels in all kinds of ...
PROVN OF BITUMINOUS ROAD FOR WKSP MT AREA AND INNER PERIMETER OF MED REGT AT BASOLI UNDER GE BASOLI
... 5 mm), including making drainage opening wherever required ...
REPAIR AND REPLACEMENT OF EXISTING SEWER LINE, CLEANING PREMISES AND REMOVAL OF DEBRIES AT RAJNAGAR COLONY , NAGPUR . (ONLY FOR UNEMPLOYED ENGINEERS).
Manualy clearing the chockes from under ground drainage line including Inspection chambers with the help of required tools for propre functioning line chamber to chamber etc. complete.
SITC of Air Conditioners at Civil and Criminal Court Building at Quepem and Canacona-Goa
Providing and fixing PVC drain pipe complete with fittings, clamps and accessories for condensate drainage from split air conditioner units. Complete as required.
Construction of Road from Barpeta Road Bashbari Road to Bajegaon Pather Smashan in Baksa District for the year 2025-26. TN-398-1.
Drainage spouts complete as per drawing and Technical Specification Clause 1209.
Construction of 1450 metre PCC Road and culvert From village Purtidighiya to village janghiburu at Panchayat Kalaiya under Jagannathpur Block
Drainage spouts complete as per Drawing and Technical Specifications.
SPL REPAIR OF OTM ACCN BLDG NO P-137 OF 8 RAJ RIF UNDER GE (I) KANPUR
... specifications : (a) S&F of drainage spout GI pipe 40 mm dia... thick laid in slope towards drainage out spout pipe mixed with ...
KARIMANNU TO PERUMPARACHALLA ROAD MAINTANANCE ,WARD 5, KOZHINJAMPARA GP-PROJECT NO 41/2026-27
drainage
Dismantling of existing damaged road and Laying of new CC road in Rotarypuram near Sreerama Temple and Masjid areas in Ward No. 07 of Pulivendula Municipality
... for nonpressure sewage & Drainage application pipes of standard ...
Retarring, Remettalling
Retarring and Drainage Facilities
Cleaning, Maintenance and Repair work of Distributary and Minor Canals under Block No.6G2 for the year 2026-27
pipe drain / drainage Syphon for drain / canal by digging the same
Provision of standard tactile tiles and ramps for Divyangjan at different stations under the jurisdiction of ADEN/East/Adra in connection with the work of provision of 100% compliance of Divyangjan amenities over all NSG category stations of Adra division.
... less than 106 gms. 19.0 DRAINAGE ADRA DIVISION-ENGG/SOUTH ...
Construction of a bridge at Kudlu Beeranbylu, Nadpalu village, Hebri taluk
Drainage Spouts using 100 mm GI pipe ...
Construction of Bakhrupara to Khadibahar Approach Road i/c Bridge Length Km ½ to 4/6 = 3.60 Km Dist Narayanpur
(b) For Sub-base cum drainage layer or upper sub-base with (ii) Grading-VI Material
Civil Works
... bring them to original shape,drainage capacity including disposal ...
Construction of Synthetic Athletic Track at District Stadium, Dungarpur (Excluding cost of cement.)
... than 5mm) including making drainage opening wherever required ...
Establishing 2x5MVA, 33/11kV Sub-Station at Ujalamba Village in Basavakalyan Taluk, Bidar District and Construction of 15Km of 33KV S/C line from 110/33/11kV Manthal MUSS to proposed 33/11kV Ujalamba Sub-Station along with Construction of 10Km 11kV Link Lines on Total Turnkey Basis.
14 Storm water drainage system: Providing and construcution of storm water drainsin M20 RCC including ...
Establishing 2x5MVA, 33/11kV Sub-Station at Shadipur Village in Chincholli Taluka, Kalaburagi District and Construction of 1.20Km of 33KV S/C line by tapping to the existing 33kV Kunchavaram line near Shadipur Village feeding from 110/33/11kV Chincholli MUSS to proposed 33/11kV Shadipur Sub-Station along with Construction of 10Km 11kV Link Lines on Total Turnkey Basis.
14 Storm water drainage system: Providing and construcution of storm water drainsin M20 RCC including ...
Establishing 2 X 5 MVA, 33/11 KV Sub-Station at Ballur(J) village in Aurad Taluka, Bidar District and Construction of 11.50Km of 33KV S/C line from 110/33/11kV Santhpur MUSS to proposed 33/11kV Ballur Sub-Station along with Construction of 10Km 11kV Link Lines on Total Turnkey Basis
14 Storm water drainage system: Providing and construcution of storm water drainsin M20 RCC including ...
Construction of Boundary wall Kitchen and store room for Kalyan Mandap in Township at HAL Korwa.
... for jointing the pipe for sewerage / rain down pipe fixed to ...
Construction of E-Block, Entrance Portico,Upgradation works of Controlled Environment Facility (9B) and balance works of Exposure Room (X-ray facility) including Area development works, PH, Electrical, Mechanical, PA and FA systems at CDM, North site
... shop. d) Length of pipe from drainage channel to tank is upto... discharge of liquid from tank to storm water drainage channel as and when required. ...
DAY TO DAY COMPLAINT AND CERTAIN MISC REPAIRS AT AHMEDABAD UNDER GE (AF) CHILODA
... Stainless steel sinks with drainage board made of stainless ...