Loading…
Loading…
47,602 results • Best match
Renovation and Beautification works of the Tahsildar's Office, Kotabommali Mandal of Srikakulam District Estimate Cost: Rs.50.00 Lakhs
... etc.,complete but excluding cost of steel and its fabrication charges for finished item... complete but excluding cost of steel and its fabrication charges for finished item ...
EE/D/KZI/ETW-13/26-27/19.05.26
Labour, Machinary, consumables for fabrication for steel structures Light section(below 14 kg/m)
Purchase of 5 Tata Ace for Disposal of Garbage.
1.00 TECHNIC FABRICATIONS PVT LTD (GSTN-03AAACT5339C1ZT) BID ID -760719 4000000.00 -9.62 3615200.00 Thirty Six Lakh Fifteen Thousand Two Hundred
Extention of ZPHS School Building in Akumarru Village of Guduru Mandal, Krishna District. EST.COST:Rs.14.00 lakhs
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
OVERHAULING OF ONE UNIT(U-3) OF 210MW BOILER AT NTPC KAHALGAON.
MATL (STEEL) Fabrication
Repairing of set 4000 GPM x 200 Mtr head pump KBL make model No SCT300/77 SI.No-01 of ABOCP Mine under Block-II Area
Fabrication of stainless steel long bush
Providing and using of good earth at SLF site for project of green bhalswa CLZ
1.00 M/s S.K.Steel Fabrication & Sheet Metal Works (GSTN-NA) BID ID -940697 991971.02 -7.49 917672.39 Nine Lakh Seventeen Thousand Six Hundred and Seventy Two
Construction of Cremation Shed for SC Burrial Ground in Rudravaram Village of Machilipatnam Mandal. EST.COST : Rs.8.00 lakhs
... complete but excluding cost of steel and its fabrication charges, Seigniorage charges ...
RENOVATION OF WORKSHOP BUILDING AT KAVARATTI
Fabrication and placing of m.s. rod... charges, tools, cost of all steel, fabrication charges, transportation ...
Construction of Southside Compoundwall and Shed to SC Burial Ground in Lankapalli Village of Ghantasala Mandal. EST.COST : Rs.11.25 lakhs
... etc.,complete but excluding cost of steel and its fabrication charges , seigniorage charges ...
INSTALLATION WORK
FABRICATION OF STEEL
As per DNIT
Providing and laying Carpet in the LHC
1.00 ADIT FABRICATIONS (GSTN-04AGVPG1888P1ZJ) BID ID -3404885 3991180.00 -3.50 3851488.70 Thirty Eight Lakh Fifty One Thousand Four Hundred and Eighty Eight
59/SE(T)AMAUSI ZONE/2025-26
Supply Fabrications fixing of iron Stand for Installation of Taill Less Units. Angle Size 50x50
Construction of Sanskrutik Bhavan Near Manikeshwar Temple at Chengta Village, in Kamalapur Taluka, Dist. Kalaburagi under CMIDP for the year 2025-26 (WORK RESERVED FOR ST CATEGEORY)
Steel Fabrication
Balance work of Samudaya Bhavan at Thanakushnoor village in Kamalnagar Taluka.
Steel Fabrication
Construction of GF and 1st floor of Vaddera Sangham Community hall at Chilkanagar Gutta, Ward No.23-Chilkangar, Uppal Circle-9, GHMC. (2nd Call)
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
RENEWAL OF KAPTANGANJ PIPRAGAUTAM NAHAR KI PATRI TO KUDHAPATTI PRITHVI ROAD
4.00 SHAKTI CONSTRUCTIONS AND FABRICATIONS (GSTN-NA) BID ID -5901518 383880.00 -29.00 272554.80 Two Lakh Seventy Two Thousand Five Hundred and Fifty Four
Construction of RCC Drain with cover slab from Shaik Meera Shops to Buchalu Cheruvu and in other places in Nallajerla GP of Nallajerla Mandal - 2nd Call
... etc.complete. Excluding steel and its fabrication charges. for Bottom Raft
Construction of Compound wall for Smart Kitchen Shed at Kumbhagiri GP of Atloor Mandal , Est. Cost.23.00 Lakhs
... etc.,complete but excluding cost of steel and its fabrication charges for finished item... complete but excluding cost of steel and its fabrication charges, overheads and contractors ...
Construction of Godown at Pandirimamidi to store Cashew collected by the VDVKs(6 Blocks) Rampachodavaram (M) Est cost Rs 30.00/11.00 Lakhs
... etc.,complete but excluding cost of steel and its fabrication charges for finished item... complete but excluding cost of steel and its fabrication charges for finished item ...
Maintenance of Adivaram to Kadayampatti Road
Supply and fabrication of Steel Grade Fe500D required for... schedule including cost of steel, cost of fabrication, labour charges for cleaning ...
Providing Stair Case Arrangement for VVD OHT in East Zone
... and also including cost of steel reinforcement, fabrication charges, scaffolding, centering, ...
Providing Cement Concrete Road at the way of Avila Convent ward no.10 in Kanniyakumari Municipality
... site excluding cost and fabrication of steel but soft water labour charges ...
Maintenance and Reparing of Cement Concrete Road from Pazhathottam Nagercoil Main Road to Rajeswary House at Ward no. 01 in Kanniyakumari Municipality
... site excluding cost and fabrication of steel but soft water labour charges ...
Maintenance of existing drainage Municipal office front at Ward no. 16 in Kanniyakumari Municipality
... site excluding cost and fabrication of steel but form work and centering ...
INSTALATION WORK
FABRICATION OF STEEL
Providing RCC Drain from Tagore Road to Rayapati Venkata Ramana Veedhi in Ramalingeswara Nagar, 15th Division. 4th Call General Funds
... etc.,complete but excluding cost of steel and its fabrication charges for finished item... complete but excluding cost of steel and its fabrication charges for finished item ...
Mechanical Repairing and Structural Strengthening of Take-up Drums of Conveyor units 201 and 301-B at Moonidih Coal Washery.
Fabrication of Structural steel work
MISCELLANEOUS ELECTRICAL WORKS IN SRP AT TNPL UNIT - II, TRICHY.
... Supports, Frames and Misc. Steel Fabrication Works:Fabrication and erection... supports, frame and Misc.Steel fabrication work including one anti-rust ...
RENEWAL OF L D RAUSINGHPAR TO DR AMEDKAR SAMUDAIK KENDRA RAUSINGHAPAR MUKHYA PURWA ROAD
3.00 SHAKTI CONSTRUCTIONS AND FABRICATIONS (GSTN-NA) BID ID -5901535 577680.00 -28.50 413041.20 Four Lakh Thirteen Thousand Forty One
Provision of full length platform shelter for each platform at Bhilwara, Bijaynagar, Mavli Jn & kapasan in Ajmer Udaipur section of Ajmer Division.
Fabrication,supply stainless steel benches,with or without backrest with or without back rest and seat partition (1 Nos Each 95 kg=95.0 kg) Total 7122309.60
Manufacturing Erection and Testing of New Sliding type Gate of size 1.2m X 1.8m 2 Nos 1.5m X 1.8m 3Nos Total 5 Nos at 560m of Main Canal and of size 1.5m X 1.8m 5 Nos at 70m 310m of Main Canal with Gate Leaf Embedments and Screw Stem Hoist includin
... Manufacturing with QAP, Fabrications, erections, commissioning ...
Replacement of Overload 11 KV Cable of Power Transformer under Matlkota Substation
FABRICATION OF STEEL
Installation of Exhaut Fan at Power Transformer of Bhadaipura substation under EDSD Rudrapur 1
FABRICATION OF STEEL
Construction of 1.00 LL Sump at Ward No 26, Women Police Station near OHT Campus
... site excluding cost and fabrication of steel but form work and centering ...
Construction of New Municipal Market in Aswaraopeta Municipality under Nagarabhivrudhi Funds.
... etc.,complete but excluding cost of steel and its fabrication charges for finished item... complete but excluding cost of steel and its fabrication charges for finished item ...
Provision of 06 meter wide FOB at Aishbagh and Basti Railway stations and improvement works like raising of PF-1 & 2, extension of PF-2, water hydrant, water supply, toilet, pipeline and sanitation at Barhni Railway station of Lucknow Division, North Eastern Railway.
... authority shall be obtained. (4) Steel fabrication works shall be executed... The material required for fabrication of steel channel sleepers should ...
Construction of Ceremony shed at Neelakandarayanpet H/O Maruthalam Panchayat Sholinghur Block Ranipet District
Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete.
Reconstruction of Sluice to Korukanthangal Eri at Maruthuvambadi Panchayat Under GENERAL FUND 2026-27
Supply and fabrication of steel as per IS432/1960 (Tested Quality) including fabrication charges for all RCC items ...
Construction of Additional Class room to MPP school Boochipalli Village & GP in Peddathippasamudram Mandal Est Cost Rs. 20.00 lakhs
... etc.,complete but excluding cost of steel and its fabrication charges for finished item... complete but excluding cost of steel and its fabrication charges for finished item ...
TNCRUDP Fund-ReConstruction of cement concrete road at Lakshmi Sundaram colony 5th Cross(078017R553)., Sukkan Medu 3rd Cross(078019R622),West Arockiya Matha St.,(078020R635)
... site excluding cost and fabrication of steel but soft water labour charges ...
TNCRUDP Fund-Renewal of CC Road at Renuga Amman Kovil street(078022L113), Anandha Vinayagar koil st (078029S156), Kalaigar Nagar cross 2 (078047S298) in ward no 22,36,47 in Dindigul City Municipal Corporation
... site excluding cost and fabrication of steel but soft water labour charges ...
Renovation of 100000 Litres Capacity OHT in Vallam village and Panchayat in Tenkasi Panchayat Union
Supplying and fabrication of steel in position including the cost of bindingwire and labour charges etc..complete
Providing Ventilators to each room in all the floors (Ground Floor, First Floor, Second Floor) of Senior Boys Hostel at College of Medicine and JNM Hospital, Kalyani, Nadia
Labour charge for fabrication and installation of composite... alloy aluminium sectios, fabrications, including cutting to proper ...
Annual Maintenance of Bridges for the year 2026 -27 in State Highway-176 Joining from Bidadi to Huskuru via Kenchanakuppe, channapatna, akkuru, Iggaluru at Chainage 48.85 km in Channapatna Taluk Bengaluru south district.
Steel Fabrication
Annual Maintenance of Bridges for the year 2026 -27 in State Highway-186 Joining from Halaguru to koudle via Nidagodi, Iggaluru at Chainage 9.75 km in Channapatna Taluk Bengaluru south district.
Steel Fabrication
Construction of RCC drain work at Ward No. 04 Gundu Gouda Layout in Haliyal TMC Limit
Steel Fabrication
CC Drain
Steel Fabrication
Construction of CC Drain from Veerabasappa Jadi house to the Hugar house in Mavanur village, Hubballi taluk.
Steel Fabrication