Loading…
Loading…
28,447 results • Best match
Permanent Restoration of road from Badhal Gali to Naga Thub Km 1st RD 0 to Km 10th RD 1000 (2nd Call)
Carriage of material from source to site of work by mechanical transport including loading /unloading and stacking complete.
Construction of Drain Bawali on BGSBU road from the Shop of Abdul Hamid 2nd Call
Carriage of material from source to site of work by mechanical transport including loading /unloading and stacking complete.
C/O Wire Crate R/Wall at RD 40/610 to 40/630
Excavation work by mechanical means (Hydraulic excavator)/ ...
Construction of FP Work by way of laying of toe crates to off-take of Arihal Khul on left side of Aripal Nallah upstream Gulbugh
Carriage of materials from source to road site of work by mechanical transport including loading, unloading and stacking stones for avg. 2 km
Construction of Minor Repair at Boys Middle School Jawahar Nagar (2nd Call)
Carriage of material from source to site of work by mechanical transport including loading/ unloading and stacking complete.
C/O one Number Ghat at Pohru Nallah at Mazbugh
Carraige of materials from source to actual site of work by Mechanical transport including cost of loading, unloading and stacking etc
PLEASE REFER TO BOQ
Carriage of material from different sources up to actual site of work by mechanical transport including loading, unloading and stacking complete.
Restoration of rain damages SH C O Protection Wall at Panjari KH No 556 Ward No 10 Tutikandi
... necessary to complete the work by mechanical means and labour (if required).All ...
C O Steel Parking on road leading to Inder Nagar in front of Police Station Dhalli SH C O Steel Parking in front of Ward Office Inder Nagar ward No 20
Excavation work by mechanical means (Hydraulic excavator)/ ...
ANNUAL PLAN ENMAKAJE GP 2025-26 PRO.NO 362/26 PALLOM AYURVEDA SUB CENTRE MAINTENANCE
2.9.1:Excavation work by mechanical means (Hydraulic excavator) ...
Restoration of rain damages SH CO footpath connecting Shiv Mandir from GPS Panjari Ward no 10 Tutikandi
... necessary to complete the work by mechanical means and labour (if required).All ...
C O ambulance road from Deepak Project NH 205 to Tulsi Ram House ward No 9 Kachighati SH CO R wall at RD 0 456 to 0 471 near RM Sharma
... necessary to complete the work by mechanical means and labour (if required).All ...
Restoration of damages due to laying of pipeline on link road from Barana Mariyari Km 0/000 to 8/000 in DisttKangra (HP) (Deposit work) (SH-Construction of retaining wall in Km 6/630 to 6/637).
Excavation work by mechanical means (Hydraulic excavator)/ ...
Construction of 300 Meter Pucca Nallah from T Point of Bella and Thanamandi road to Decamrine Restaurant
Carriage of material from source to site of work by mechanical transport including loading /unloading and stacking complete.
C/O one Number Ghat at Pohru Nallah at Mazbugh.
Carraige of materials from source to actual site of work by Mechanical transport including cost of loading, unloading and stacking etc
Improvement of ridding surface of road to Masjid Ali ward no 01 Kheora (3rd Call)
Carriage of material from source to site of work by mechanical transport including loading /unloading and stacking complete.
Restoration of Rain Damage on Brow to Poshna road Km 0/000 to 13/180
Excavation work by mechanical means (Hydraulic excavator) ...
C/O lining wall on gham Khul at Seelo
Carraige of materials from source to actual site of work by Mechanical transport including cost of loading, unloading and stacking etc
Pohru Nallah Flood protection work on left side of Pohru Nallah at RD 11000M Approx. Lenth 60m
Carraige of Materials from Souce to Road site of work by Mechanical Transport including cost of loading, unloading and stacking etc
Seer Canal Construction of Lining Wall and Bed treatment from RD 4000 4200 and RD 9000 9200 MTRS (L 400MTRS)
Carraige of Materials from souce to Road site of work by Mechanical transport including cost of loading, unloading and stacking etc
Making of 03 nos. Silt settling tank with two 02 nos. chambers at workshop AKKOCP under AKK OCP, BnK Area
Excavation work by mechanical means (Hydraulic excavator)/ ...
Construction Of Culvert Nallah crossing Near Pump Station Ward No. 03 PYT. GB West Block Akhnoor For the Year 2026-27 Under PRI. (Pyt Level)
Carriage of Key Construction material from source to site of work by mechanical means of transport of sand aggregate average 7 km laid by MT.
Construction Of Lane Culvert Near Sham lal , subash chander and others W no.06 PYT.Sungal Upper Block Akhnoor For the Year 2026-27 Under APDP Budget (Block Level)
Carriage of Key Construction material from source to site of work by mechanical means of transport of sand aggregate average 7 km laid by MT.
Construction of retaining wall near house of Mohd Shafiq on road Lower Thudi Taunch Mohalla (2nd Call)
Carriage of material from source to site of work by mechanical transport including loading /unloading and stacking complete.
C/O one Number Ghat at Pohru Nallah at Mazbugh.
Carraige of materials from source to actual site of work by Mechanical transport including cost of loading, unloading and stacking etc
Construction of road from NHO Mehta Devidas to Jatt Mohalla Muradpur Panchayat -A ward No 06 (2nd Call)
Carriage of material from source to site of work by mechanical transport including loading/ unloading and stacking complete.
Tender for R/R of damaged 11/0.4 Kv DTR Structure due to heavy rains/storms
Excavation work by mechanical means (Hydraulic excavator)/ ...
REPAIR MAINT TO ROAD FUNITURE, ROAD MARKING PAINT KERB STONE PAINTING PAVER BLOCKS AT JA(LIPA MIL STATION
... 50mm dia stainless steel pipe(fabrication work from SS-304 material) ...
DEPOSIT PWD Department Temporary laying of 200mm PVC and 110mm PVC line and Permanent Laying of 200 mm PVC, 200 mm MS, 110 mm PVC and 100 mm GI Pipelines at Murinjapuzha , in Vaikom - Ernakulam road as part of the culvert work by PWD department
... edges of 200mm (I.D.) M.S. pipes during fabrication work including all labour... tools etc., complete: For pipes fabricated with 8mm thick M.S. plates.
Lifting and lowering of submersible pump motor along with other allied works within DWS Sub Division II Milansangha Agartala
Providing & fabrication of column pipe including fitting fixing ...
Providing and fitting fixing of electrical accessories, spare of panel board of different water supply schemes at different locations under DWS Sub-Division, Barpathari during the year 2026-27 (2nd Call).
Providing & fabrication of column pipe including fitting fixing ...
Construction of MINI Community Sanitary Complex in PUE School (Boys) at R.Puthupatti In Senthamangalam East Pt
Supplying and Fixing in Position for Fabrication of Erecting Structural Steel Works including all chargse curing, etc.
COMPREHENSIVE MAINTENANCE OF EM INSTALLATIONS WITH ALLIED WORKS AT ALLENBY PH UNDER GE UTILITY AMBALA
... supports, clamps and back plates fabricated from structural steel sections including ...
CA NO CWE/AMB/UTILITY-88 OF 2025-26 REPAIR/ MAINT OF 11 KV HT NETWORK HT VCBs RMUs DISTRIBUTION TRANSFORMERS AND ALLIED WORKS UNDER SECTOR A UNDER GE (UTILITY) AMBALA CANTT
... with operating GI rods and mechanical work from ground level with locking ...
Tender for Special Repairing work at FSD Jiribam for the FY 2026-27 Repairing of office, canteen, security barrack, weighbridge including painting.
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Construction of Community Hall at Shiv Mandir under MLA CDF for the year 2026-27 (Amt 9.80 Lacs) (1 ST Call)
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.
Reconstruction of Two Nos. Shop in Ward No. 12 Near City Bus stand Karnal, M.C. Karnal (Recall)
[5.25]Demolishing R.C.C. work manually/ by mechanical means including stacking ...
Remodelling of existing storm water drain with RCC Precast drain as per new master drainage plan 2025 of LP Road from Kala Mandir Road to Sanjay Gandhi Hospital Road under Sub Division NWR-21, Division NWR-2, During 2025-26. (4th Call)
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Renovation and Repair of workshop, stores and goods shed of Pit No 02 of Kunustoria Colliery under KNT Area.
Demolishing brick work manually/ by mechanical means including stacking ...
Repair and Renovation of sumbal link sub-divisional office and lodging at headwork sumbal including allied works
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.
R.C.C. slab casting on existing toilet at MLV College Bhilwara
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
Project No.145/2026 Anganwadi maintanance-AKLM GP
15.7.4:Demolishing brick work manually / by mechanical means including stacking ...
Remodeling of existing storm water drains with Precast drain as per new master drainage plan 2025 at sultanpuri main road (From Flood Control Drain to jalebi chowk) and Jagdamba Road (From Main sultanpuri Road to D-5/244 (Jagdamba market) .....
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Renovation and development of Rani Luxmi Bai Park in ward No. 20 (FOR L/C SOCIETY LTD)
[5.34]Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of Engineer-in-charge. [Through Rate]
MANNARKKAD MUNICIPALITY 2025 26 KARSHIKA VIPANANA KENDRAM NAVEEKARANANAM PRO NO 597
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking ...
Upgradation of Set No. 34 D Block D at Ahata Amar Singh by way of Kitchen Washroom Tiling etc. CNo-237 P
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge
Remodeling of drain as per Master Plan of Delhi at Najafgarh Road from Moti Nagar to Raja Garden under Sub-Division WR-21, Division West Road-2 (M-112N), New Delhi during 2026-27
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
CANAL WATER BASED WATER SUPPLY PROJECT FOR CONSTRUCTION OF 7 MLD WTP AND OTHER RELATED WORKS INCLUDING 5 YEARS O AND M PART 2 AT JANDIALA GURU DISTRICT AMRITSAR PUNJAB UNDER AMRUT 2 SCHEME
II ) Mechanical Works :
Day to Day cleaning and upkeeping of Bishrampur Township Colony and maintenance of Sanitation system at Bishrampur TA of Bishrampur Area 90 Days
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete work. Thermo-Mechanically Treated bars
Development of new A site RO within 3 km from Rajauli Chowk towards Deodha on NH-104 at Mouza Rajauli Thana Devdha Anchal Jainagar Dist Madhubani under Muzaffarpur DO of BSO.
... 1245 Demolishing R.C.C. work manually/ by mechanical means including stacking ...