Loading…
Loading…
2,390 results • Best match
Madurai Division :- ADEN/SCT Sub-Division:- Provision of Track machine siding at 2 stations.(TML & KUV-Permanent way portion only )
be supplied by Railways. 2. Hydraulic Weld
Supplying and stacking of SKV Welding Portions for 60kg 90UTS / 60 kg/60EI R-260 rails with complete accessories under DEN/C/Jhansi's jurisdiction
Each JHANSI DIVISION-ENGG/NORTH CENTRAL RLY 25mm gap 'in-situ' welding during traffic block using Railway's welding portion and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Welding portion and related accessories as per Annexure - I shall be supplied by Railways. All other items required shall be supplied by the Contractor. 2. Welding shall be carried out only by trained welder having valid competency certificate. 3. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 4. Required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track.
Part supply of signaling material, installation, testing & commissioning in connection with construction of ROB in lieu of LC No. 232/B at Km. 759/6-7 between station Kalol - Khodiyar, LC No. 228 at Km 753/4-5 between Kalol - Pnsar Road and LC No. 230 at km 756/4-5 between Kalol - Mahesana on Ahmedabad - Palanpur section of Ahmedabad Division(Re-invite).
Complete Indoor wiring testing & commissioning of station / LC Gate. This includes: (i) Prewiring & fixing of all base plates as per approved wiring diagram. (Supply of relay base covered in schedule 'A'. Excess quantity of base plate, if required will be supplied by Railways, prewiring of which will be done by the contactor.) (ii) Fixing of Relay groups on relay racks. (iii) Soldering of tag block terminals, dressing of wires as per approved rack arrangements/ Circuit diagrams. (iv) Wiring on bus bar, fuse base condenser , resistance etc. as per wiring diagram. (v) Wiring on Relay rack to relay rack via IDF, IDF to CT rack in relay room. (vi) Wiring on panel tag block shall be repeated on tag blocks located on IDF & CT rack in relay room. (vii) Wiring between control panel room & relay room. (viii) Supply of simulation panel, which shall be separate for each station and shall be left after commissioning. (ix) Provision 200 way tag blocks for data logger and providing jumpers between voltage free terminals on relay racks and data loggers, tag block with 0.6 sq mm cable. (x) Wiring 21 between Integrated power supply and data logger tag block with one square mm /0.6 sq mm cable as per instruction of Engineer in-charge. (xi) Wiring of key lock arrangement at SM's office/ site & Earth leakage detectors. (xii) Wiring of block instruments from CT rack to block instrument terminals and includes supply & laying of indoor cables for this purpose as per standard arrangements. (xiii) All wiring & wiring materials necessary to complete Station/ LC gate (Within station limit) Installation but not cover in the schedule anywhere. (xiv) Writing of description on all relays & other indoor equipments Note: All wiring shall be done as per std. practice of Railways with neat dressing & threading. Detailed testing will include functional testing, selection table, locking table and cross sheet testing with the help of operating panel and simulation panel in the presence of railway officials to their satisfaction. a copy tested selection table, locking table and cross sheet duly signed by contactor to be submitted to field office for record. This included supply of lamps for simulation panel for testing. Note: Contactor will Put sufficient Staff to carry out the testing round the clock, if desired by Railway Engineer and will ensure that any alteration which become necessary during testing are carried out & testing is repeated wherever required .
Removal of garbage in mid section of track at Villupuram Yard beyond 500 metre from the end of platform in Senior Section Engineer/Permanent way/VM for a period of two years.
cotton pads, aluminium casseroles and any other miscellaneous catering refusals lying in the approaches of yards beyond 500 metre from the end of platform in mid section with in the railway premises by deploying sufficient men, to keep the track neat and tidy with necessary contractor's lookout men to safeguard against the traffic. Garbage and waste materials collected to be dumped only at the locations nominated by engineers's representative within the Railway limit. The location at which the pick up garbage in bags are temporarily collected should be maintained properly, neatly by the contractor without fouling the environment as directed by the engineers's representative and it has to be cleared by deploying contractor's men and machinery duly trucking out by the contractor's own road vehicles such as trucks and tractors and disposing the same away from the Railway's premises with contractor's men and machinery without infringing track/traffic movements and dumping at corparation/municipality dumping ground with an average lead of 10 km with all lead and lift and Charges if any etc.' complete by the contractor and as directed by the Engineer's representative.All labour, tool & plants, machinery, personal safety equipments such as uniforms, safety shoes, glouse etc'.vehicles like trucks/tractor and consumables stores, fuels, crew are to be supplied by the Tenderer/Contractor at hs own cost. VM Junction - Towards MS End at Km.162/000-161/600 (400m x 16m = 6400 Sqm per day).(Note:1. Manpower required per day is atleast 6 Nos between 07.00 hrs - 13.00 hrs and 14.00 hrs- 16.00 hrs. 2.Payment will be made to the Contractor for every two months from the date of commencement. 3.The SSE/P.way in charge will maintain a register on which the SSE or any other Railway staff under his control as nominated by him, will record the availablity of the labours and area covered. This register is only for official purpose. 4.All the contracts on Works/goods/services will be subject to the new GST Act as applicable from time to time. 5.The Contractor should ensure that the following protective gears to be provided to the labourers. a)Uniforms for labours.The color and design has to be approved by railways. b)Identity card with photo, c)Suitable foot wear, d) Gum boots, e) Illuminous jacket, f) Arm band, g)Cap, h)Face Mask (cloth), i)Gloves rubber cover upto elbow, j)First aid box, k)Rain coat. 6.Daily photographs shall be taken during the progress of work and shared in the special message group without fail. 7.In case the garbage is not cleaned satisfactorily, as observed by the Engineer-in- Charge, a penalty of 50% shall be imposed for that specific day, and the corresponding amount will be deducted from the payment.) 8760000.0
Updating, reconciling & certification of Land Plans with mutation of Railway land (duly separating Patta) along with ROR, Chitha and Jamabandi, in accordance with the Digital India Land Records Modernization Programme (DILRMP) between km 20-101 (Saraighat Bridge-Chaparmukh Jn), km 101-190 (Chaparmukh Jn-Lumding Jn), km 191-328(Lumding Jn-Furkating Jn), km 0-20 (Chaparmukh Jn-Senchoa Jn) , km 0-49 (Senchoa Jn-Mairabari), km 0-61(Senchoa Jn-Silghat Town), km 0-2 (Lumding Jn-Badarpur Jn), km 0-10(TETELIA - KAMALAJARI) km and km 0-16 (DHANSIRI - SHOKHUVI) under the jurisdiction of Sr. DEN/1/LMG and Sr. DEN/IV/LMG.
Collection of survey records. Maps Sqm ownership rights of Railway and available Railway land plans for complete width/area of Railway land, computerizing the tippans/FMB's and generating a Railway land boundary map as per revenue records of state, computerizing the available railway and plans and checking both sets of boundary maps for confirmity of railway boundary, doing accurate cadastral and field survey to verify the contents of field land village/City map sheets and railway land plansas well as Railway land boundary maps developing above duly recording the mandatory field details for location of boundary such as one UP or one DN main through line and a few important land marks/structures(at lease oneper KM) and adjacent properties (Revenue Sr.No) along the Railway boundary. Obtaining authentication of Railway land boundary. In amanner acceptable to the state survey & Land record department which will be kept as a record standing legal scrutiny. Preparing final hard copy of Railway land boundary map in scale 1:1000 with details as record during survey in above which will be used by railway officials to locate their land boundary and other land assets with respect to UP & DN main through line & important permanent landmarks/structures preparing a customized geographic/land information system to suit. Railway requirements for land management providing easy storage access and retrival of geographic/land information system software package to operate the system at different location ( Mid section) Note-Measurements details of existing land plans are in miles and feet. But measurement of subject work land plan are to be kilometers and meters (metric system) only. For station & Rly colony area. LUMDING DIVISION-ENGINEERING/N F RLY
Upgradation of old Running room post demolishing existing old running room and renovation of lobby building with various facilities to Running Staff at HNZM Station in the section of SSE/W/HNZM under ADEN/HNZM in the jurisdition of Sr.DEN-V/DLI.
"Preparation and submission of Architectural plans along with other relevant papers etc. as per Railways requirement in connection with provision of Central Control and Command Centre including preparation of working drawings showing elevation , sections , road /circulating area, landscaping of the area , gates, grills, cup boards, toilets, staircase railing, doors ,windows, ventilators, electrical point positions , S&T point positions , firefighting arrangements , indoor AC positions, false ceiling , wall paneling , lighting arrangements etc. and other specified works related to the above scope as per requirement of Railway administration time to time including submission 2 of Architectural Drawing showing interior and exterior finish. The architect should be certified from Council of Architect. The item includes preparation and submission of completion plans showing detailed drawings of the related items of all the jobs mentioned above for the floors, rooms, toilets, gallery, lift lobbies, circulating area etc. as instructed by Railway Administration time to time. Nothing shall be paid extra whatsoever the case may be. The completed drawings duly signed shall be submitted in two sets in soft/hard copies. The architect has to submit presentation in ppt format as and when asked by Railway Administration. The architect has to visit at the site at least once in a week during execution of work or as and when required by Railway Administration otherwise penalty of Rs. 5000 /- per day shall be levied on the Architect. The mode of payment shall be as under: (i) On submission of Drawing in hard copy =70% (ii) On submission of Drawing in softd copy =20% (iii) After completion of work =10% "" "