Loading…
Loading…
1,487 results • Best match
LAYING OF PE PIPELINE NETWORK INCLUDING ASSOCIATED WORKS FOR PATNA GA FOR CITY GAS DISTRIBUTION NETWORK (1 YEAR ARC)
Survey, Soil investigation, design and execution of various works for Procurement, laying, jointing, testing and commissioning of Distribution network of 20 new OHTs and 29 existing Overhead Tanks and Replacement of Old Distribution Network
Survey, Soil investigation, Design, Construction & Commissioning: - A) Construction of overhead tanks of various capacity -20 nos. & GSR-2 nos. & pumping machinery. B) Providing, laying, jointing, testing and commissioning of pure water feeder main of 32 km of various dia. including excavation refilling, road cutting/ dismantling, restoration, providing valves, and specials and fittings all complete C) Providing, laying, jointing, testing and commissioning Distribution network of proposed & replacement network of – 685.28 km. of various dia. including excavation refilling, road cutting/ dismantling, restoration, providing valves, and specials and fittings all complete D) house service connection work replacement of existing connection + proposed connection = 121520 nos. E) Achieving continuous (24 x 7) pressurized water supply in Each OHT under the scope of work.
Construction of ESR, MBR for zoning of distribution network in Malkangiri Municipality
GSM/GPRS modem - Supplying , Installing and Commissioning of SMS based ON / OFF operation of pumps at remote locations with test & trial including one year guaranty & two year comprehensive maintenance including SIM card & SMS charges. Wireless Motor Controller is suitable for all range of electrical motors and starters and pump sets. It shall protect pump set from dry run. Controller shall have inbuilt battery and charges automatically. Controller shall be controlled through SMS, Call, IVRS or Smart Phone application (All controlling modes are must). It shall have following features as, a. Auto Mode operation
Survey, Soil investigation, design and execution of various works for Procurement, laying, jointing, testing commissioning of Distribution network of 20 new OHT and 46 existing Overhead Tanks Replacement of Old Distribution Network (Package-4)
Survey, Soil investigation, Design, Construction & Commissioning: - A) Construction of overhead tanks of various capacity -20 nos. & GSR-3 nos. & pumping machinery. B) Providing, laying, jointing, testing and commissioning of pure water feeder main of 25.2 km of various Dia including excavation refilling, road cutting/ dismantling, restoration, providing valves, and specials and fittings all complete B) Providing, laying, jointing, testing and commissioning Distribution network of proposed & replacement network of -892.55 km. of various Dia including excavation refilling, road cutting/ dismantling, restoration, providing valves, and specials and fittings all complete C) house service connection work replacement of existing connection + proposed connection = 1,26,480 nos. D) Achieving continuous (24 x 7) pressurized water supply in Each OHT under the scope of work.
Construction of OHSR, Providing and Laying of Water Supply Distribution Network in Zone-1, Zone-2 and Zone-3, Shiv Badi, Biakner
Construction of OHSR, Providing & Laying of Water Supply Distribution Network in Zone-1, Zone-2 and Zone-3, Shiv Badi, Biakner
PKG-F Undergrounding of HT and LT lines (S/s-Nagar Nigam) on turnkey basis under Revamped Distribution Sector Scheme in Uttarakhand State.
Rod type earthing of pole by GI earthing rod 20ɸx2500mm with welded Clamp 40X3mm & GI wire 8 SWG (0.5 Kg) with Bolts Clamp, Washers & Nuts complete as per Drw. REC/RDSS/GEN/07 Annexure C37