Loading…
Loading…
393 live365 closing this weekmost from Energy Department Uttar Pradesh and Gujarat Energy Transmission Corporation Limited
393 results • Best match
Extension of 2 Nos., 220kV line bays at 400/220 kV Maithon Substation (POWERGRID) under ERBS-III
8 Illumination System for switchyard panel room of 6 m length LS 1 18.00 Confirmed ₹ 0.00 0.01
Turfing and gravelling at nearby area of 2x40MVA Transformers of 132KV S/s, ELDECO, Sitarganj under OandM Division, PTCUL, Sitarganj
Turfing of Switchyard with Cement concrete 1:3:6 with 10cm thick layer complete in all respect as per direction of engineer in charge.
Tender for providing 11/0.4 kV, 100 kVA Sub Station Atal Vihar from 11 kV MES feeder and 3 Phase LT Line at Atal Vihar in (E) Section Holta under Electrical Sub Division No. I, HPSEBL Palampur.
Erection of Sub-Station Complete in all respect
Erection of 01 Nos. 33KV Garautha 400KV SS Bay With Supply of Material And Integration and Remote Gateway Work at 132KV SS Gursarai under ETD, Jhansi
Laying of following sizes of control cable in the cable trench from control relay panel to various equipments / marshalling boxes and JB etc. In switchyard as per cable schedule.
Main Plant Electrical Package for KKNPP Unit 5 and 6
0 1 UAK - 400KV OUTDOOR SWITCHYARD STRUCTURES and EQUIPMENT... GUARANTEE OF 400kV OUTDOOR SWITCHYARD EQUIPMENT COMPRISING POST ...
Tender for providing SOP to JSV WSS Storage for improvement of House hold connection to PC habitation of Jia Barsar and Diyala by providing 11/0.4 kV, 63 kVA Sub Station a/w LT Line in (E) Section Gopalpur under ESD No. II, HPSEBL Palampur.
Erection of Sub-Station Complete in all respect
Selection of EPC Contractor for Design, Engineering, Supply, Construction, Erection, Testing and Commissioning including civil works on turnkey basis of 30 MWac Ground Mounted Solar PV Power Projects at vacant lands at SGTPS
... from Pooling substation to Switchyard of generating power Project ...
SERVICES FOR INSTALLATION OF 160 MVA TRANSFORMER AT 220KV GSS SHEO and 132/33KV 50 MVA TRANSFORMER AT 220KV GSS SHEO and 25 MVA TRANSFORMER AT 132KV GSS SATA SUCH AS ERECTION WORK AIR DRYER AND OIL FILTRATION WORK
ERECTION OF SUB-STATION EQUIPMENTS: Erection of Current Transformer / ...
Replacement of old, damaged and malfunctioning 33KV bus isolators and 33KV line isolators at various substations under 220KV OandM Division, PTCUL, Haldwani
... (With earth switch) from the switchyard as per standard procedures ...
Construction of various transmission elements (various 220kV and 132kV transmission lines) associated with 220KV GSS Palana UNDER RVPN/EHV/BN-9019002613
Erection of Sub Station Structures including levelling , setting of Stub and tightening , punching of nuts and Bolts and tack welding upto beam level as per specification
Erection of 01 Nos. 33KV Rewan Bay With Supply of Material And Integration and Remote Gateway Work at 220KV SS Bangra Under ETD, Jhansi
Laying of following sizes of control cable in the cable trench from control relay panel to various equipments / marshalling boxes and JB etc. In switchyard as per cable schedule.
ESWCA-15/2026-27
Outdoor Switchyard Earthing with 32mm size Earth Mat with Delta earthing on Power Transformer neutral & 33KV LA as per resspo Specification
Turnkey Extension of Existing 245 kV GIS by Addition of 2 (Two) Nos. of 245 kV GIS Feeder Bays along with Associated Services at 400 kV Sonapur GIS Substation of AEGCL
Switchyard PCC & Gravelling
Extension of 765/400 kV Champa Substation under the Transmission Scheme Augmentation of Transformation Capacity at 765/400 kV Champa Substation by Installation of 1500 MVA, 765/400 kV ICT (7th ICT on Bus Section-B)
Package Name Retrofitting the 220 kV Switchyard equipments and control & protection system with Substation Automation System and SPR based Control & Protection System at Mandola Substation
Augmentation of Transformer capacity at 132 kV S/s Purkul 132 kV S/s Bhagwanpur and 132 kV S/s Roorkee in Garhwal Zone under Package1
Dismantling of existing conductor with hardware and Disc insulators etc. of 132kV main bus & shifting of dismantled material from switchyard to store.
Shifting of a part of Chakta and Ankhona 11KV feeder from the Railway boundary at Komarpur Railway Crossing emanating from Kandra 33/11kV Sub Stn under Katwa Division under Purba Bardhaman district under West Bengal
Erection of Sub-station DP structure with all fittings (isolator, DTR, FUSE etc) for PCC Pole Solid 9Mtr Long (Paint)
Augmentation of 1x132kV, 20/25 MVA Transformer along with other miscellaneous work at 132kV GSS, RVPN, Parasneu.
ERECTION OF SUB-STATION STEEL STRUCTURES columns ...
Strengthening of iron mesh fence, repairing and construction of trenches and trench covers, rearrangement and dressing of various kinds of cables in trenches and other misc works at 220KV S/s, Kamaluaganja Haldwani under 220KV OandM Division Haldwani
... 220 KV, 132 KV and 33 KV switchyards by opening of trench covers, ...
Construction of 132 KV GSS Moolana
ERECTION OF SUB-STATION EQUIPMENT :i)Erection of 33/0.4kv or 11/0.4kv ...
Work of Re-Construction of 2X5 MVAR Capacitor Bank at 132 KV S/S Sasni under ETD, Hathras
... boxes/junction box etc. in switchyard as per cable schedule, their ...
Supply and Installation work for Construction of new 33/11KV S/Stn and associated 33 KV and 11 KV lines in Turn Key mode at 16 nos. location in West Bengal. (PK SS 07 R)
... concrete. Before concreting, the switchyard area should be cleaned by... per Annexure-A.[ Consider- Switchyard black stone top = 300mm ...
Erection of Augmentation work of 400/220KV ICT-3 from 315 MVA to 500 MVA at 400KV Kansari ss under Palanpur Circle.
1) Tools tackles required for Sub-Station erection activities and stringing.
Erection of (1) 01 no. of 400/220KV, 500MVA, ICT -5 bay Work (2) 400kV Bus Extension (A,B & C) work (3) Erection of 220kV Palanpur Line-2 bay with 220kV Bus Extension Work at 400KV Kansari ss under Palanpur Circle
1) Tools tackles required for Sub-Station erection activities and stringing.
Services for installation of 200 minus 100 MVA transformer at 220KV GSS Balotra such as Erection work dismantling shifting air dryer and oil filtration work
ERECTION OF SUB-STATION EQUIPMENTS: Erection of Current Transformer / ...
Tender for prov. SOP on 11 KV DAV School Changer by erection of 11 KV Metering equipt 250 KVA, New 11 KV HT line from exist str 100 KVA S/Stn Forest colony site and 3 phase LT line with AB cable in (E) section Changer under ESD No.II Bilaspur.
Erection of Sub-Station type CT structure, C.C. ...
Tender for Prov. OF 63 kva S/Stn. to 250 KVA S/Stn. at Harijan Basti and Re conductoring of existing 3 Ph. LT line from AAAC 7/2.50 MM ,6/1/2.11 MM to 7/4.26 MM conductor for SOP to 45 KW load of M/S Dogra Filling Station ( Indian Oil Corp. ) at
ERECTION PART (Sub-Station).1 Nos
Upkeeping OR Cleaning work for Admin Office Building of GETCO Circle office and Const. Dn. office Amreli for the year 2026 27 28 (Two years).
in live switchyard (This is for new agency) & magnitude of jobs including under maximum three
Engineering, Procurement and construction (EPC)of New Hydraulic Structures (Bhadar-5 Barrage) and Other Allied Activities on a Bhadar River ( Stretch From the 1 km D/S of Ganod Checkdam to the 1 km D/S of bhimora Checkdam) Ta. Upleta of Rajkot Dist
... work, mechanical work and switchyard work, machineries work of ...
Engineering, Procurement, and Construction (EPC) Contract for the Construction of New Hydraulic Structures (bhadar-3 Barrage) and Allied Activities on Bhadar River (From Downstream of Bhadar-2 WRP to 1 km Downstream of Upleta-1 Check Dam), Taluka Upleta.
... work, mechanical work and switchyard work, machineries work of ...
Engineering,Procurement and construction (EPC)of New Hydraulic Structures (Bhadar-4 Barrage) and Other Allied Activities on a Bhadar River ( Stretch From the 1 km D/S of Upleta-1 CheckDem to the 1 km of Ganod Checkdem) Ta. Upleta of Rajkot Dist
... work, mechanical work and switchyard work, machineries work of ...
APGENCO-SRBHES Complex - NSRCPH - R&M - Establishment of 132/11KV Network, including supply of certain materials, erection, testing and commissioning of 132KV/11KV distribution network, 4MVA transformer, CTs, PTs, LAs and isolators on both HV & LV ... and erection of ...
... 132/11KV network bay to 132KV switchyard CC cable tray to route cables ...
Adding of 01 Nos 33 KV Solar Bay for M/S Prakash Renewable Power LLP bay at 220 KV S/S Bah, Agra under ETD-III Agra
... with complete adjustment in switchyard on the erected structure ...
MAINT OF EXTERNAL HT E/S NETWORK IN AKHNOOR MIL STN UNDER GE (S) AKHNOOR
... relaying of the same in switchyards complete all as specified ...
Tender for Work of erection of 66 kV equipment, structures, control wiring, yard Lighting, Control-Room etc at 66 kV Hapa Sub Sation with Mesh earthing and furniture.
class switchyard (as per respective technical
Establishment of Katchanam 33/11 KV SS
Erection of Equipments/Materials for Sub Station Works at Katchanam
Tender for Prov. new 11 kV HT line from prop. 11/0.4 kV, 100 kVA S/Stn. DG 4 th along with New 3-Ph LT Line to interlinking with existing LT network at vill. Dagrah in (E) section Sohari Under ESD HPSEBL Chowkimaniar.
ERECTION PART (Sub-Station).1 Nos
Upgradation of the lighting system for Saraighat Bridge.
... ,maintenance free for Transformer switchyard for Substation. The FRP ...
Construction of 132KV S/S Jagdishpur, Amethi on turnkey basis
GI perforated trays of various sizes for all cable trenches in switchyard, control room including fixing for 132 kV S/s
INVITATION FOR BIDS (IFB) FOR BALANCE OF PLANT (BOP) EPC PACKAGE FOR DURGAPUR THERMAL POWER STATION (1X800MW) LOCATED AT BARDHAMAN DISTRICT OF WEST BENGAL
GIS SWITCHYARD
Work of Narmada Based Water Supply Project for 163 Villages of Dhorimanna and Chouhtan Block, Distt. Barmer (Package CP-03, Chouhtan-1 under JICA funded Rajasthan Rural Water Supply and Fluorosis Mitigation Project Phase II on SPR basis with one-year
... Instrumentation, Outdoor Switchyard as per Section for Electrical).
Rate Contract for Civil Works in Substations, Transmission Line Foundation Works and Other Civil Works under NR-I Region
... the required density in switchyard area 40 mm size stone aggregate ...
Supply, Laying, Erection, Testing and Commissioning of 66kV 1CX630 sqmm XLPE Cable with Poly AL-Poly / Aluminum Corrugated construction on EPC basis for various lines in Anjar circle in Rajkot Zone.
on completion of sub-station work, erection/ installation of substation
Establishing 2x200MVA, 220/110 kV and 1x20MVA 110/11 kV sub-station at PM Mitra along with construction of associated lines and terminal bays. Establishing 2x20MVA, 110/33 kV and 2X20MVA 110/11 kV sub-station (Station-1) at Keeranagi village along ... with construction of ... kV sub -station ... sub- station (Station-2) ... ( Station -2) ... with construction of ...
SS66 Sub-station Automation System including erection: Complete Sub-station Automation System including ...
Bi- Annual Rate Contract for restoration of various 132kV/220kV Class Transmission lines, damaged due to natural calamity / any other abnormality under various transmission divisions of Bharuch Circle.
TECHNICAL PARTICULARS FOR ERECTION OF EQUIPMENT AT SUB-STATION
Bi- Annual Rate Contract for Emergency Power Restoration Work of 400/220/132/66kV lines under Bharuch Transmission Circle.
TECHNICAL PARTICULARS FOR ERECTION OF EQUIPMENT AT SUB-STATION
Bi- Annual Rate Contract for restoration of various 66kV Class Transmission lines, damaged due to natural calamity / any other abnormality under various transmission divisions of Bharuch Circle.
TECHNICAL PARTICULARS FOR ERECTION OF EQUIPMENT AT SUB-STATION
Refurbishment of HVDC Control, Protection, SCADA, Valve Hall Equipment and Valve Cooling System for 1x500 MW Vizag HVDC Back to Back (BTB) Station under Add-Cap.
... in one (1) Substation or Switchyard during the last seven (7) ...
Construction of Storm Water Pumping Station for interlinking of lakes in TP Scheme No. 301, FP-251/1, 2 of Hebatpur area in the North West Zone of AMC Area
11 kV SWITCHYARD / TWO POLE (DP) STRUCTURE:
Bi-annual Up keeping / cleaning work of circle office building, conference room and surrounding area of Palanpur Circle Office
experience to work in live switchyard and satisfactory completion certificate from respective
765kV GIS Extension Substation Package SS158 for (a) Extn. of 765/400kV Sasaram (POWERGRID) S/S associated with ERES-51: Diameter completion at Sasaram (POWERGRID) S/s and (b) Extn. of 220kV Nalagarh (POWERGRID) S/S associated with Implementation of 2 nos. 220kV line bays (GIS) at 400/220kV Nalagarh (PG) S/s for the termination of 220kV D/c line from 220/132kV Kunihar S/s to Nalagarh S/s
... one (01) GIS substation or switchyard during last seven (07) years... in one (01) substation or switchyard during last seven (07) years ...