Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
260 results • Latest
CONSTRUCTION OF BOUNDRY WALL, MAIN GATE, CC ROAD ETC AT 06 TRADE ITI BUILDING NALKHEDA DISTT. AGAR MALWA (M.P.)
Inviting rates for Water Supply for for the Financial Year 2026-27
Repair of canal gates in Pipliya Kumhar Tank under the WR subiv. Agar under E/M Sub div Shajapur
Supply Of Construction Material FOR FINANCE YEAR 2026-27
Supply Of Construction Material FOR FINANCE YEAR 2026-27
Facility Management Services - LumpSum Based - NAGAR PARISHAD SOYATKALAN; SUPPLY AND MOUNTING NATIONAL FLAG POLE 30 METER; Consumables to be provided by service provider (inclusive in contract cost)
Tender cum Auction for allotment of industrial Plots to applicants who have successfully submitted EOIonMPMSME Portal and are eligible to participate in tender cum auction process for IA Aankalii
ANNUAL REPAIR WORK FOR EXISTING BRIDGES AND APPROACHES IN DISTRICT AGAR MALWA UNDER PWD BRIDGE SUB DIVISION SHAJAPUR
ANNUAL MAINTENANCE WORK IN DIFFERENT WARD IN YEAR 2026-27
SUPPLY OF MORRAM,CHURI ..ETC AT DIFFRENT WARD IN YEAR 2026-27
SUPPLY OF LOHE KE CHANNEL,JUNGLA,DHAKKAN ..ETC AT DIFFRENT WARD IN YEAR 2026-27
WARD NO. 10 GHUGHARIYA ME SINGLE COT C C ROAD EVAM NALI NIRMAN KARY
Establishment of 10 M.T. Toll kanta on B.O.T Basis in mandi yard BADOD DISTT AGAR
Establishment of 10 M.T. Toll kanta on B.O.T Basis in mandi yard SOYATKANLA DISTT AGAR
Establishment of 10 M.T. Toll kanta on B.O.T Basis in mandi yard SUSNER DISTT AGAR
ARSRMOW/DEPOSITE WORK FOR RESIDENTIAL BUILDING AT SUB DIVISION SUSNER DISTT AGAR MALWA
B.T. PATCH REPAIR WORK OF SUB DIVISION AGAR DISTT AGAR MALWA
MINOR CDS REPAIR WORK ON VARIOUS ROAD UNDER P.W.D. DIVISION AGAR DISTT AGAR MALWA
ARSRMOW/DEPOSITE WORK FOR NON RESIDENTIAL BUILDING AT SUB DIVISION SUSNER DISTT AGAR MALWA
Lightemittingdiodedriver (Q4)
WARD 19 SHITAL MATA MAANDIR KE SAMNE EVAM NAG MAHARAJ MANDIR KE SAMNE TEEN SHEED NIRMAN KARY
WARD 11 ME GAMOTH GALI JAINESHWAR GALI ,JAMIDARPURA ME CC ROAD EVAM NALI NIRMAN KARY
Repairs and Maintenance of Nalkheda SO under Ujjain Division.
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Within 5 Year Maintenance (BW)
Interactive Panels with CPU (Q2) (3 (3 ))
Camera for CCTV System (V3) (Q2), Video Recorder for CCTV System (V2) (Q2) (3 (3 ))
Vehicle hiring 02
Vehicle hiring 01
External Electrification work for 16 N.G.O. Qrts., Police Line, Agar Malwa (11/0.4 KV, 1x200 KVA Transformer (On Line) with Street Light)
WARD NO. 17 BALAJI HOSPITAL SE LADDA MALL KE PICHE TAK C C ROAD EVAM NALI NIRMAN KARY-2ND CALL
supplying 5ton capacity hydrolic cylender trolly with 20ton load capacity hydrolic jack
supplying 47hp tractor maximum torque 178nm,4 cylender drive type 2wd 2000RPM dual clutch,dual acting power steering, oil immersed brackers
construction of a cc road in ward no. 01 (Rajwada) construction of a ghat and electrification work at devesagar pond in ward No. 15 and electrification and beautification work at shivpahadi
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Scorpio, Mahindra Bolero; 2022; 75, 000- 1, 00, 000 kms; Non A/C; 12
Maintenance Work of flooring sanitary Work of division sub division office Distt. Agar Malwa M.P.
xtrelectronics
Executive Table (V4) (Q2)
Revolving Chair (V5) (Q2)
Construction Of CC Road Mohan Baser To Shankar Singh House At Ward 02
B.T. RENEWAL WORK OF LALGARH KALISINDH BRIDGE TO PIPLON KALAN ROAD LENGTH 5.10 KM AND GATA TO KHOKRIYA ROAD LENGTH 5.10 KM TOTAL LENGTH 10.20 KM SUB DIVISION AGAR DISTT AGAR MALWA
B.T. RENEWAL WORK OF SEMALKHEDI APPROCH ROAD LENGTH 3.30 KM AND KHELAGAON TO GURDADIYADEV LENGTH 2.70 KM TOTAL LENGTH 6.00 KM SUB DIVISION SUSNER DISTT AGAR MALWA
CONSTRUCTION OF HELIPAD AND BERICATING WORK AT AGAR DISTT AGAR MALWA
External Electrification Work Near Dudha Khedi Stop Dam, Shubash Marg
Infrastructure Development Work of Industrial Area Agar Malwa Phase 3 dist. Agar Malwa
12 Month Repairing and Maintenance of Hand pump Major and Minor Work in Different Villages of block Agar. Distt. Agar Malwa M.P.
Balance Work of External combined water supply scheme for Industrial Area Agar Malwa sector 1, 2 and 3, with 8 MLD Water Supply Scheme, dist Agar Malwa
High End Laptop - Notebook (Q2), All in One PC (V2) (Q2) (3 (3 ))
Selection of Contractor for The Work of Legacy Waste Dumpsite Remediation through Bioremediation, Biomining and disposal of Residual wastein Nagar Parishad,Agar.-4TH CALL
LED Luminaire For Road And Street Lights Conforming To IS10322 (Part5/Section3) (V3) (Under BISScheme-II) (Q2)