Loading…
Loading…
311 live241 closing this weekmost from Rural Development and Panchayati Raj and Department Of Military Affairs
311 results • Latest
Facility Management Services - LumpSum Based - Comprehensive Non- Mechanized Cleaning and Housekeeping of DRM Office (Administrative Complex) JAT for 03 Year(36 months); Housekeeping, Collection and disposal of garbage; Consumables to be provided by ..
SPECIAL REPAIR TO BLDG NO P-69 AT JAK LI REGT CENTRE UNDER GE 970 EWS
ADDN/ ALTN OF EXISTING BATHROOM/ WASHROOM BLDG NO T-3 (SM BARRACK) AND PROVN OF SEWAGE LINE APPROX 30 RM AND SEPTIC TANK FOR 50 USERS BEHIND BLDG NO P-97 (QUARTER GUARD) OF 14 WEU AT OAF, SRINAGAR UNDER GE 970 EWS
Ordinary Portland Cement (V3) Confirming to IS 269 (Q3) (3 (3 ))
Power Control Center (PCC) Panel for Power Distribution (Q3) (3 (3 ))
Security Manpower Service (Version 2.0) - Healthcare; Security Supervisor, Security Manpower Service (Version 2.0) - Healthcare; Unarmed Security Guard
Supply, Installation, Testing and Commissioning of G plus 1, 15 Passenger Lift (Suitable for Hospital Stretcher use) including other allied works at Sub-District Hospital Beerwah Budgam
Establishment of sports medicine Centre for Agniveer at JAK
12 Watt White-LED Based Solar Street Lighting System As
Tent Extendable Frame Supported 4M and 2M Complete with Accessories (V2) (Q2) ( ( 3 3 ))
PROVN OF CERTAIN AIR RAID SHELTERS AT 1 WG AF STN SRINAGAR
REPAIR/MAINT AND REPLACEMENT OF CENTRIFUGAL PUMP SETS, STARTERS, LT PANEL OF VARIOUS ASSESTS INSTALLED AT WATER SUPPLY INSTALLATION AND OTHER CONNECTED WORKS UNDER GE (AF) SRINAGAR
REPAIR/ REPLACEMENT OF UNDERGROUND PIPE LINES, SLUICE VALVES, NRVs, ARV, VALVE PIT CHAMBERS, JOINTS, LAGGINGS AND OTHER CONNECTED WORKS UNDER GE (AF) SRINAGAR
Custom Bid for Services - Repair, Renewal and Maintenance of RO water Purifier Similar Category ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2)
Jungle Boot IS 17861: 2022 (Direct Injection Process) as per CAPF specifications (Q1) (3 (3 ))
Coat Parka (Outer Jacket, Inner Jacket and hood) for CAPF's as per MHA Specifications (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Cloth Disruptive Polyester and Cotton (20: 80) with Digital Print Uniform Cloth (V4) as per CRPF Specifications (Q1) (3 (3 ))
SPECIAL REPAIR TO BLDG NOS TR-06, TR-07, TR-11, TR-12 AND TR-13 OR LIVING ACCN OF 25 AD REGT AT OLD AIR FIELD SRINAGAR UNDER GE 970 EWS
ENDOSCOPE AND COLONOSCOPE
High Strength Deformed Steel Bars and Wires for Concrete Reinforcement (V2) ISI marked to IS 1786 (Q2) (3 (3 ))
High Strength Deformed Steel Bars and Wires for Concrete Reinforcement (V2) ISI marked to IS 1786 (Q2) (3 (3 ))
Supply, Installation, Testing and Commissioning of Fall Arrestor System
Development of Shrine Premises and Bada Talab at Charisharief B.W.O Upgradation of Bada Talab Boundary walling ELECTRIC WORK
Development of Shrine Premises and Bada Talab at Charisharief B.W.O Development of Shrine premises at Charrarishareif by way of ornamental canopy and installation of Luminaries with allied accessories like wiring controlling protection switch gear d
Stablilization and improvement of 33KV Nowbugh Charsharief Line at Kakawring
PROVN/CONSTRUCTION OF URC AND ALLIED WORKS AT AF STN SRINAGAR
ADDITION / ALTERATION / IMPROVEMENT TO LIVING IN BILLET AT NO-2 AREA UNDER GE (AF) SRINAGAR
REPAIR / REPLACEMENT OF MESHES, EXTERNAL PLASTERING, CRACKS AND SEEPAGE OF SWTS AT MES COMPLEX AND 727 SU AND INTERLOCKING / FOOTHPATH TILES AT ARJAN LOUNGE, DUTY CREW, ACCOUNT SECTION, STN HQ AND 2202 HQ, PATH AND CULVERT AT TECHNICAL AREA
SPECIAL REPAIR / REPLACEMENT TO BIRD PROOFING NET AND FALSE CEILING AT VARIOUS HANGARS UNDER GE (AF) SRINAGAR
REPAIR / REPLACEMENT OF EARTHING PITS, LIGHTENING ARRESTOR, FLAME PROOF FITTINGS AND OTHER MISC WORK UNDER GE (AF) SRINAGAR
PROVN OF OVERHEAD WEATHER SHELTER AND DUTY NCO CABIN FOR IAF(P) AND DSC GUARD AT UNIT MAIN GATE AT 45 WEU AT AF STN SRINAGAR
Design, Fabrication and SITC of Motorized Sliding Trolley Gate including All inclusive Comprehensive Maintenance Contract at Srinagar International Airport
Augmentation of Receiving station BK Pora.
Upgradation of Sighting System of L/70 Gun System
Construction of 125 mm Bore Well with submersible pump unit and allied works at Chadoora in District Budgam.
Installation of Bore well along with submersible pump and allied fittings at Peace Enclave at Sheikhpora Panchayat Budgam in District Budgam.