Loading…
Loading…
374 results • Latest
CONSTRUCTION OF MIS IEC AND BC ACTVITIES UNDER SWACHHTA SURVEY 2025-26 PREPARATION TECHNICAL SUPPORT SUSTAINBLE CLEANLINESS CITIZEN PARTICCIPATION AND ALL DOCUMENT WORK
HANDPUMP REPAIRING AND MAINTANANCE OF 1725 Nos AT NORTH SIDE OF Sone River BLOCK SIDHI DISTT SIDHI
Up Keeping and care taking for 10 months of round the clock (24 Hours) at camping house Sidhi.
Construction and renovation of control room at 33/11 KV S/s Hanumangarh, Sidhi.
Pre Stress Cast Boundary Wall (Q3)
Repair and Maintenance Work of Sluice Gates of Singrauli District
Repair and Maintenance Work of Sluice Gates of Sidhi District
Urgent Repair of Flood Damaged Other Distt. Roads and rural Raods Under Sec. Bamhani Sub. Dn. Sidhi, Distt. Sidhi, PWD Raod SOR w.e.f 11-04-25 2nd Call
Special Strengthning work on Dhupkhad Duari Road L- 9.30 Km, Under Sub. Dn. Majhauli, Distt. Sidhi PWD Road and Bridges SOR w.e.f 11-04-25
SUPPLY OF COIL
Inviting Rate For SBM Wall Painting Work FY 2026-27
IE Services for Widening of existing 2-4 lane divided carriageway with paved shoulder from Km243.800-Km270.500 of NH39 (Rewa to Churhat Tunnel) and from Km286.200-Km313.700 of NH 39 (Churhat to Sidhi) (54.20 Km) under NH(O) in the State of MP on HAM
Supply of computer
4 PULSE GENERATOR DISCS FOR 1TB2026
Survey and preparation of a Detailed Project Report DPR for the construction of the Churhat Amiliya Sihawal Road Length 64.54 km and the Sihawal Khairpur Chitrangi Road Length 14.00 km Total Length 78.54 km.
PIPELINE MENTINENCE MATERIAL SUPPLY FINENCIAL YEAR 2026-27
CONSTRUCTION OF PAVER WORK FROM BUDI MATA MANDIR ROADS WARD 12
HAND PUMP MENTINENCE MATERIAL SUPPLY FINENCIAL YEAR 2026-27
ELECTRIC MATERIAL SUPPLY FINENCIAL YEAR 2026-27
SANETRY MATERIAL SUPPLY FINENCIAL YEAR 2026-27
Repair/Maintenance of the Rural Roads/CDs, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme-Special Repair of Roads/Culverts (Flood Damage)
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme.-Post 5 Year
Shifting/Raising of High Voltage (HV) / Medium Voltage (MV) /Low voltage (LV) lines and poles from alignment of PMGSY/CMGSY Road.
Shifting/Raising of High Voltage (HV) / Medium Voltage (MV) /Low voltage (LV) lines and poles from alignment of PMGSY/CMGSY Road.
1POWER SUPPLY, 2POWER SUPPLY 24V 40A, 3POWER SUPPLY 24V 40A, 4POWER SUPPLY 24V 40A, 5POWER SUPPLY 24V 40A
1BEARING BRACKET DE, 2Brush holder yoke, 3BEARING BRACKET DE, 4STUD BRUSH HOLDER, 5Insulator, 6SPRING
CS for AE for Supervision of balance work for rehabilitation and upgradation of Sidhi Singrauli Road from Km 82/400 to Km 187/99 DL 105.59 Km of NH39 (Old NH75E) to four lanes with paved shoulder in Madhya Pradesh on Item Rate Mode
Construction of 500 MT Capacity Godown with Agro Solution Center at 1. Village-Amiliya/Chamroha 2. Village- Bamuri District Sidhi
UNDER KAYAKALP SCHEME 2.0 STRENGTHENING WORK OF C.C. ROAD MAIN MARKET NEW OFFICE BULDING TO FOREST OFFICE AT WARD NO. 04,05,07,10 AND 11 NAGAR PARISHAD MAJHAULI DIST.-SIDHI (M.P.)
Repairing and Maintenance of P.H.E. Building At Subdivision Churhat Distt. Sidhi M.P.
HANDPUMP REPAIRING AND MAINTANANCE OF 1337 Nos AT West SIDE OF SIDHI PART-1 ( 7 HEAD QARTER) BLOCK SIDHI DISTT SIDHI
HANDPUMP REPAIRING AND MAINTANANCE OF 1299 Nos AT EAST SIDE OF SIDHI PART-2 ( 6 HEAD QARTER) BLOCK SIDHI DISTT SIDHI
HANDPUMP REPAIRING AND MAINTANANCE OF 1574 Nos AT South Side Of Sone River BLOCK SIHAWAL DISTT SIDHI
VARIOUS ALLIED CIVIL, ELECTRICAL, RENOVATION AND INTERIOR FURNISHING WORK IN KARUNA BHAWAN AT COLLECTOR OFFICE BUILDING SIDHI DISTRICT SIDHI (M.P.)
CONSTRUCTION OF PCC ROADS WORK FROM JAMUNA SINGH HOME WARD 03
CONSTRUCTION OF PCC ROADS WORK FROM GAJENDRA SINGH HOME WARD 03
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme.-Post 5 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme.-Post 15 Year
CONSTRUCTION OF B.T. ROAD KACHHIYAN MOHLLA TO RAMAVTAR GUPTA HOUSE AT WARD NO. 02 NAGAR PARISHAD MAJHAULI DISTT. -SIDHI (M.P.)
ELECTRCT MATERIAL SUPPLY FINENCIAL YEAR 2025-26 NAGAR PARISHAD MAJHAULI DIST SIDHI (M.P.)
HANDPUMP MENTINENCE MATERIAL SUPPLY FINENCIAL YEAR 2025-26 NAGAR PARISHAD MAJHAULI DIST. SIDHI (M.P.)
SANETRY MATRIAL SUPPLY FINENCIAL YEAR 2025-26 NAGAR PARISHAD MAJHAULI DIST SIDHI (M.P.)
PIPE LINE MENTINENCE MATERIAL SUPPLY FINENCIAL YEAR 2025-26 NAGAR PARISHAD MAJHAULI DIST SIDHI (M.P.)
2kv Solar Off Grid System and other
Monthly Basis Cab & Taxi Hiring Services - SUV; 3000 Km x 364 hours; Outstation
Revised work of Retrofitting Work of Piped Water Supply Scheme to achieve the target of JJM for supplying water at every doorstep through functional household tap connection in Villages Shivpurwa No. 1 Block -Sidhi District - S
Construction of 100 Seated Girls and 100 Seated Boys Hostel Building Under Dharti Aaba Janjatiya Gram Utkarsh Abhiyan DA JGUA At Government Higher Secondary School, CHAKARIYA, District Singrauli MP SECOND CALL
CONSTRUCTION OF WBM ROAD HARIJAN BASTI TO BHAINSVAHI PRIMARY SCHOOL IN WARD NO. 03 NAGAR PARISHAD MAJHAULI DISTT. -SIDHI (M.P.)
CONSTRUCTION OF R.C.C DRAIN NEAR MANBODH KUSHWAHA GOMTI TO RESIDENCE OF CIVIL JUDGE IN WARD NO. 14 NAGAR PARISHAD MAJHAULI DISTT. -SIDHI (M.P.)
CONSTRUCTION OF WORK FROM PCC ROADS DINESH SAKET HOME TO UMESH SAHU