Loading…
Loading…
2,101 results • Latest
Procurement of COLTCS Cleaning Ball for 500 MW units of NTPC VSTPS
Repair of tank, leaf spring and other body parts and replacement of worn out parts of Mobile Fogging machine MP66H 2358 and MP66H 2359 of Block-B Project.
Repairing and Rewinding of TRANSFORMERS during monsoon period
Repairing/rebuilding of worn out of housing of Boom, Arm and eye of upper structure then co-axial line boring to its original size in PC2000-8(K-1) Hydraulic shovel at Amlohri Project
Repairing of Power Ladder, counterweight, Railings and Catwalk of 2 Nos. PC 2000-8 Hydraulic Shovels(K-1, and K-2) of Amlohri Project.
HOSE 381-12 Part No. 2074222, HOSE END, FR 2-8 Part No. 1032836, HOSE END FR5-12 Part No.1034545, HOSE END FR 5-4 Part No. 1081659, HOSE END FR 5-5 Part No. 1033131, HOSE END FR 5-6 Part No. 1034421, HOSE END FR 5-8 Part No. 1033255, HOSE R 2-8 Part No. 1032828, 1033140 HOSE Part No.1033140, HOSE R 5-4 Part No.1081641, HOSE R5-5 Part No. 1033239, HOSE R 5-8 Part No.1033930, TEE 8 RT X 5 Part No.0968056, TEE, PIPE PFM .38 Part No. 0807435, CONNECTOR 5-497 X 5 Part No. 0882381, MALE CONNECTOR Part No. 0875961, CONNECTOR 88FT X 5 Part No. 0837229, CONNECTOR 8- 8GT X 9 Part No. 0837211, CONNECTOR 88 GT X 9 Part No. 0994839, CONNECTOR 8FT X 5 Part No. 0845752, ELBOW 4-4CTXS MALE Part No. 0837113, ELBOW 5-4CT X 5 Part No. 0837202, ELBOW 5-4 VTK5 Part No. 0931179, ELBOW 5CT X 5 Part No. 0837199, ELBOW 8-8 CT X S Part No. 0938483, ELBOW 8CT X 5 Part No. 0845736
Fabrication / Repair of 04 Nos. RHS platform and repairing and fitting work of Engine Guard 04 Nos. of CAT777E Dumpers at OWS Nigahi Project.
Repairing of damaged gear box cover of Hoist intermediate shaft and main gear wheel of 24/96 Krishna Dragline at Nigahi Project.
Shifting and Diversion of Existing 33KV and 6.6 KV HT OHL F no 3,4,11 and 13 towards North side and F no 15 towards East side from existing place near Tapovan s/s for providing space to HOE working in that areas for OB and Coal Exposure.
CONSTRUCTION OF GADAKHAND MARKET SUHIRA MAIN ROAD SHRI RAMANUJ CHAKKI TO GUDARARI KHOLI ROAD L-3.50 KM, UNDER PWD SUB DIVISION WAIDHAN , DISTT- SINGRAULI (M.P.)
1 - M8701261210 - 100267380, 2 - M8701105211 - 100267380
Upkeeping of Indira Bhawan and Sports complex in CWS colony at CWS Jayant for 120 days
Hand - Operated Chain Pulley Block (V2) as per IS 3832 (Q3) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6762725 Dated : 16-10-2025 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Hand - Operated Chain Pulley Block (V2) as per IS 3832 Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 753056.2 Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India Schedule 1 EMD Amount (In INR) 6569 Schedule 2 EMD Amount (In INR) 3477 Schedule 3 EMD Amount (In INR) 1477 Schedule 4 EMD Amount (In INR) 3539 ePBG Detail Advisory Bank ICICI (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 3 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. 2/9 (b). The EMD Amount will be applicable for each schedule/group selected during Bid creation. (c)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : SO(MM) NCL Singrauli Madhya Pradesh, COAL INDIA LIMITED, Northern Coalfields Limited, Ministry of Coal (Prabodh Rai)
BLOCK TACKLE; TIRFOR, 3TON, BLOCK TACKLE; TIRFOR, 5TON, BLOCK TACKLE; PLNG-LFTNG, HND OPRTD, 5T, 8T
Trimming, Bush cutting near HT OHLs and other maintenance works of all HT OHLs including , Installation, Testing and commissioning of 11 KV Gr, 1250 A GOAB switch (Isolator)and Lightning Arresters, spike/Air terminal system with Earthpits etc
Providing and fixing overhead signage boards at the ends of express way at Jayant project
Power, Schedule14_100263856_240_M1917221352_BEARING ROLLER SPHERICAL 22213 E_For Vindhyachal Super Thermal Power, Schedule15_100263856_270_M1955997569_BRG RLR TAPER SINGLE 645 632_For Vindhyachal Super Thermal Power, Schedule16_100263856_280_M1985212000_ADAPTER SLEEVE H2320_For Vindhyachal Super Thermal Power, Schedule17_100263856_290_M1920862628_BRG RLR CYLINDRICAL NU2226ECML_For Vindhyachal Super Thermal Power, Schedule18_100263856_300_M1920661000_BEARING ROLLER CYLINDRICAL NU 310_For Vindhyachal Super Thermal Power, Schedule19_100263856_320_M1910721330_BEARING BALL ANGULAR CONTACT 7213 BMP_For Vindhyachal Super Thermal Power, Schedule20_100263856_340_M1915131650_BEARING BALL SELF ALIGNING 1316 K_For Vindhyachal Super Thermal Power, Schedule21_100263856_350_M1960731200_BRG RADIAL INSERT UC212_For Vindhyachal Super Thermal Power, Schedule22_100263856_360_M1902640514_BEARING BALL RADIAL CONTACT 6405 C3_For Vindhyachal Super Thermal Power, Schedule23_100263856_370_M1920660712_BEARING ROLLER CYLINDRICAL NU307 C3_For Vindhyachal Super Thermal Power, Schedule24_100263856_380_M1912320701_BEARING BALL ANGULAR CONTACT 3207 A_For Vindhyachal Super Thermal Power, Schedule25_100263856_400_M1920870830_BRG RLR CYLINDRICAL NU2308 ECP_For Vindhyachal Super Thermal Power, Schedule26_100263856_420_M1975006220_BRG RLR TAPER 6220 6277_For Vindhyachal Super Thermal Power, Schedule27_100263856_430_M1975000522_BRG RLR TAPER 522 526_For Vindhyachal Super Thermal Power, Schedule28_100263856_440_M1975034306_BRG RLR TAPER CONE 34306 _For Vindhyachal Super Thermal Power
PROCUREMENT OF Wallace And amp Tiernan MAKE CHLORINE LEAK DETECTION SYSTEMSPARES NTPC VSTPS
" HOSE FIRE; SYNTHTC JACKETD, TYP: B, 63MM, 15M", HOSE; LND DLVRY, 22.5M, MXF, RBR, AL
Forged Shackles for General Lifting Purpose (V2) Conforming to IS/ISO 2415 (Q3) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Drilling of 10 No. Gravel Pack Tubewell 300/100 mm dia and 60.00 mtr deep. In District Singrauli(M.P.)
Bulk procurement of DOM Air cylinder for NTPC
Tarfelting and Denting of roof of both side 24/96 ( Krishna and Balram) Dragline and 20/90 ( Bajrang and Matang) Dragline working at site Nigahi Project.
1 - M3370330025 - 100274310, 2 - M3100990308 - 100274310, 3 - M3100990467 - 100271565
NIKKU Air Break Contactors frame size 2 Brand: NIKKU (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687767779931 dt.16/06/2026)
VVIP AND VIP PROGRAM STAGE, HELIPAD, BARICETING, APPROACH ROAD AND OTHER WORK UNDER PWD SUB DN. CHITRANGI DISTT. SINGRAULI (M.P.)
REPAIR AND RENOVATION OF DISTRICT COURT BUILDING WAIDHAN BLOCK WAIDHAN DISTT-SINGRAULI (M.P.)
REPAIR OF RESIDENTIAL BUILDING (RB) AND NON RESIDENTIAL BUILDING (NRB) UNDER PWD SUB DIVISION CHITRANGI, DISTT.- SINGRAULI (M.P.)
REPAIR OF RESIDENTIAL BUILDING (RB) AND NON RESIDENTIAL BUILDING (NRB) UNDER PWD SECTION SARAI AND NIWAS, SUB DIVISION DEOSAR, DISTT-SINGRUALI (M.P.)
Dissolved Acetylene (Gas) (V2) Conforming to IS 308 (Q2), Oxygen, Compressed Gas and Liquid (V3) Conforming to IS 309 (Q3) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
WIRE ROPE PART No. V12460460, SEAL KIT OF CONSIST 27 TO 36 PART No. SDF2374000, GASKET, CYLINDER HEAD - 1.4(DEF. EPMB) PART No. 7101797013, PIN RETRACT FAB PART No. 7107261
NIKKU Air Break Contactors frame size 6 Brand: NIKKU (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687727885388 dt.13/06/2026)
M5530111325, M5530111322, M5530111321, M5530111323, M5530111324, M5530111320
Proximity Warning System, Part No. 789DPD
BLOCK TACKLE CHN PLLY, 1TON, BLOCK TACKLE CHN PLLY, 2TON, 3M, BLOCK TACKLE CHN PLLY, 3TON, BLOCK TACKLE CHN PLLY, 5TON, BLOCK TACKLE CHN PLLY, 10TON, PALLET HAND, HYDRAULIC, 2T, LIFT 2M
Household Refrigerating Appliances as per IS 17550 (Q2), Deep Freezer Marked to IS 7872 (Under BIS Scheme 1) (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Fabrication of 35No battery clamps and repairing of battery box of BWS70kL/CAT777D/CAT777E model 100T dumpers/water sprinklers of Amlohri Project
Procurement of AC Spares required for TATA Hitachi Hyd
Repairing and Maintenance of 04 no. Apron Feeders installed in CHP Phase-II, Amlohri Project
Repair and maintenance of civil works in GM office and workshop complex at CWS Jayant for a period of two years
Outsourcing Work for OTR Tyre related works of Dumpers/ Water Sprin-klers of Block-B Project for a period of 610 days
CONSTRUCTION OF ADDITIONAL ROOM AT Govt. HS GHINHAGAWAN JP DEOSAR DISTRICT SINGRAULI (M.P.)
MAIN CABLE ASSEMBLY Part No.SE57506, SENSOR CABLE ASSEMBLY Part No.SE53944, REFILLING KIT FOR AUTOMATIC FIRE Part No.SE57330, PORTABLE CYLINDER Part No.SE53836, TEFLON BUSH Part No.SE543351, NOZZLE CONICAL Part No. SE53508, 1 by 4 HOSE ASSY Part No.SE5352243, 1 by 4 HOSE ASSY. ONE SIDE L BEND Part No.SE5352219, DIP TUBE INLET Part No.SE539931, NITROGEN CYLINDER ASSEMBLY 0.5 LIT Part No.SE57112, CONTROL UNIT Part No.SE59965, CO2 CYLINDER ASSEMBLY Part No.SE58217, PILOT CYLINDER ASSEMBLY GL Part No.SE57146, CABLE ASSY MAIN 4005N Part No.SE57501, SENSOR CABLE ASSEMBLY Part No.SE536951, DCP CYLINDER 20KG Part No.SE57510, HORN UNIT Part No.SE57392
Inviting Rate For Air conditioner and All in One Desktop At Nagar Parishad Sarai Distt-Singrauli (M.P.)
INVITING RATE FOR CONSTRUCTION MATE-RIAL (NIRMAN SAMGRI) FOR FINENCIAL YEAR 2026-27
For hiring of 01 No. Light Commercial Vehicle (Utility Bolero Jeep or equivalent) of latest modal approximate maximum Three-year-old as on date of issue of NIT for A.E.(ONM) MPPKVVCL Waidhan
Piped Water Supply Scheme under Jal Jeevan Mission (JJM) at Village Obari and Gannai Sub division Deosar Distt Singrauli (M.P.)
Piped Water Supply Scheme under Jal Jeevan Mission (JJM) at Village Barka and Niwas Sub division Deosar Distt Singrauli (M.P.)
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero, Mahindra Scorpio, Maruti Suzuki Jimny; The vehicle to be deployed should not be more than three years old in case of light vehicles from the date of its first RTO regist..
Repairing of Road Over CHP Track Crossing Bridge at Amlohri Project.