Metalling, Re-carpeting, Seal coat, Protection work and other allied works
Earthwork, PCC and RCC work, Brickwork, Patch Metalling, Carpeting and other allied works
(1)Const of Paver block road - Pranesh Das to Dipen Das,W/7 (2) Const of Paver block road - Sukantapalli Road (near Railway Line) to Satyandra Das,W/10 (3) Const of Paver block road - Halaimura road near Bikash Das to Rasendra Rudrapaul, W/6
Bituminous grouting, Metalling, Re-carpeting, Protection work and other allied works
1) Imp of road - Dayananda Biswas to Subudh Das house,W/3 2) Paver block road - Shyamal Banik to Monomohan Das, W/6 3) Const of road Subhash Pal to Hiranjan Malakar,W/8 4) Const of road - Subhankar Chakma to Sonadhan Chakma,W/9
Bituminous grouting, Metalling, Re-carpeting, Seal coat, Box cell and other allied works
Construction of RCC Foot Bridge from Sarat Chandra Para to Chandradayal Para at west Potachera Dumbur hydel project of Raishyabari RD Block under RD Gonda Twisa Division during the F.Y. 2026-27
Construction of masonry Drain including cover slab from the various locations under the ward no 22 under UMC_UDP_2026_27. Total Length of Drain including cover slab 149.00 m.
Construction of Paver block road including Protection wall at various locations under the ward no 22 UMC_UDP_2026_27. Length of P wall 180.00 m and Length of Paver block road 180.00 m.
Provision of floor tile at sector combined hospital (Female ward, Physiotherapy room, and office and duty room) BSF campus Goklulnagar