Loading…
Loading…
569 results • Latest
Construction of masonry Drain including cover slab from the various locations under the ward no 21 under UMC_UDP_2026_27. Total Length of Drain including cover slab 142.00 m.
Providing permanent Electrical installation in the first floor and second floor of newly constructed Tripura Public Service officers office at Old Kalibari lane in Agartala.(2ND Call)
Mtc. Of 0.65 MGD capacity SWTP at Kakraban under kakraban R.D Block /SH- Providing, suppling Alum, hydrated lime, bleaching powder, chlorine etc. at 0.65 MGD capacity of SWTP at kakraban during the year 2026-27. (2nd_Call)
WQM_SP under JJM/ Supplying of Field Testing Kits (FTK) for Chemical testing of water sample at various drinking water supply schemes within the jurisdiction of DWS Division Udaipur during the year 2026-27.
Construction of cover slab for existing drain including paver block road with protection wall at various spots a. From PWD road to the house of Ranjit Pal b. From PWD road to the house of Anup Das at ward No 20 under UMC_UDP_2025_26. Length of P wall
Construction of masonry Drain including cover slab from the various locations under the ward no 20 under UMC_UDP_2026_27. Total Length of Drain including cover slab 143.00 m.
Hiring of OEM FSR for Troubleshooting/repair of ABB make VFD of brake unit#1 at drilling Rig NG-2
3rd call for Repair/Renovation/Set up of exterior Office yard of NCC unit, Hariganganga HS school by filling of local Earth by mechanical Transport with other allied works in the premises of NCC unit, Agartala West Tripura for the year 2026-27.
Maintenance work of Kshudiram Basu English Medium School under Sadar, West Tripura for the year 2026-27.
Construction of paver block road masonry drain including cover slab and C.C. road at various location Road 1 The house of RatanMathuri to Dipak Das TL of paver block road and drain including cover slab 65.00 m Road 2 The house of Tapan Das at Kamini